List of Figures

List of Figures

The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Report Volume 2: Pre Feasibility Studies List of Figures Figure Page Figure 2.1.1 Busway Route for Short-Term Plan 2-1 Figure 2.2.1 Location of Current Bus Stops 2-2 Figure 2.2.2 Major Dimensions of Bus Coach 2-4 Figure 2.3.1 Busway Passenger Demand - 2007 2-5 Figure 2.3.2 Busway Passenger Demand - 2010 2-5 Figure 2.3.3 Busway Passenger Demand – 2020 2-6 Figure 2.3.4 Jabodetabek Public Transport Demand, 2020 2-7 Figure 2.3.5 Specification of Articulated Bus Coach (18 m type) 2-8 Figure 2.3.6 Bus Operation Concept 2-11 Figure 2.3.7 Bus Exclusive Lane Arrangement 2-12 Figure 2.3.8 Example of Bus Lane in Case of Road Widening 2-13 Figure 2.3.9 Location of Road Widening and Installation of Exclusive Bus Lane 2-14 Figure 2.3.10 Interchange-Facility Development 2-16 Figure 2.3.11 Number of Transfer Passengers (2010) 2-16 Figure 2.3.12 Square Development at New Sudirman Bus Stop 2-18 Figure 2.3.13 (1) Bus Terminal Improvement Plan 2-18 Figure 2.3.13 (2) Bus Terminal Improvement Plan 2-19 Figure 2.3.13 (3) Bus Terminal Improvement Plan 2-20 Figure 2.3.14 Transferring Center at Monas and Senen 2-21 Figure 2.3.15 Example of the Bus Shelters 2-22 Figure 2.3.16 Example of Feeder Bus Service 2-23 Figure 2.3.17 Example of Travel-lane Rearrangement by Removal of Side Separator 2-24 Figure 2.3.18 Example of Travel-lane Rearrangement by Removal of Side Separator 2-24 Figure 2.3.19 Tidal Flow Lane System 2-25 Figure 2.4.1 Comparison of U-Turn Measures 2-28 Figure 2.4.2 U-Turn Measure Type 1 2-29 Figure 2.4.3 U-Turn Measure Type 2 2-29 Figure 2.4.4 U-Turn Measure Type 3 2-29 Figure 2.4.5 Rough Layout at Jl. Melawai and Panglima Polim Intersection 2-32 Figure 2.4.6 Layout of Intersection at JORR (Jl. Kartini) 2-33 Figure 2.4.7 Rough Layout at Roundabout 2-34 Figure 2.4.8 Layout at Jl. Gatot Subroto 2-35 Figure 2.4.9 Layout at Kapten Tendean 2-36 vi The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Report Volume 2: Pre Feasibility Studies Figure Page Figure 2.4.10 Layout at Jl. Pejaten Raya 2-37 Figure 2.4.11 Layout at JORR 2-37 Figure 2.4.12 Rough Layout at Jl. Mangga Dua and Jl. Gunung Sahari 2-39 Figure 2.4.13 Rough Layout at Jl. Dr. Sutomo 2-40 Figure 2.4.14 Rough Layout at Jl. Pramuka 2-41 Figure 2.4.15 Rough Layout at Intra Urban 2-42 Figure 2.4.16 Rough Layout at Jl. Jend. Suyoto 2-42 Figure 2.4.17 Rough Layout at JORR 2-43 Figure 2.4.18 Lane Assignment at Perintis Kemerdekaan – Kelapa Gading Intersection 2-44 Figure 2.4.19 Signal Phasing at Kelapa Gading Intersection 2-45 Figure 2.4.20 Suprapto/Perintis Kemerdekaan – A. Yani Intersection 2-45 Figure 2.4.21 Phase Sequence at Suprapto/Perintis Kemerdekaan – A. Yani Intersection 2-46 Figure 2.4.22 Existing Layout at Suprapto – Tanah Tinggi Intersection 2-46 Figure 2.4.23 Busway Layout Using the Second Option 2-47 Figure 2.4.24 New Layout at Suprapto – Tanah Tinggi Intersection 2-48 Figure 2.4.25 Senen Underpass Plan 2-49 Figure 2.4.26 Intersection Layout at Senen Intersection 2-50 Figure 2.4.27 Phase Sequence at Senen Intersection 2-50 Figure 2.4.28 Existing Circulation Layout at Prapatan – A Rachman Hakim – Menteng Raya2-50 Figure 2.4.29 Proposed Busway Layout at Prapatan – Hakim – Menteng Raya 2-51 Figure 2.4.30 Phase Sequence at Kebon Sirih – Menteng Raya 2-52 Figure 2.4.31 Intersection Layout at Kebon Sirih – Agus Salim Intersection 2-52 Figure 2.4.32 Phase Sequence at Kebon Sirih – Agus Salim 2-53 Figure 2.4.33 Intersection Layout at Thamrin – Kebon Sirih 2-54 Figure 2.4.34 Phase Sequence at Thamrin – Kebon Sirih 2-54 Figure 2.4.35 Intersection Layout at Gajah Mada – Hayam Wuruk – Hasyim Asyhari 2-55 Figure 2.4.36 Signal Phasing at Gajah Mada – Hasyim Asyhari 2-56 Figure 2.4.37 Intersection Layout at Hasyim Asyhari – Biak 2-56 Figure 2.4.38 Signal Phasing at Hasyim Asyhari – Biak Intersection 2-57 Figure 2.4.39 Intersection Layout at Daan Mogot – Satria 2-58 Figure 2.4.40 Signal Phasing at Daan Mogot – Satria Intersection 2-58 Figure 2.4.41 Intersection Layout at Daan Mogot – Outer Ring Road 2-59 Figure 2.4.42 Signal Phasing at Daan Mogot – Outer Ring Road Intersection 2-59 Figure 2.4.43 Intersection Layout at Daan Mogot – Tampak Siring Intersection 2-60 Figure 2.4.44 Intersection Layout at Daan Mogot – Kalideres Bus Terminal 2-60 Figure 2.6.1 Present Situation of the Busway Routes 2-66 vii The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Report Volume 2: Pre Feasibility Studies Figure Page Figure 2.7.1 Implementation and Operation Schedule of Busway 2-76 Figure 2.8.1 DKI Jakarta Land Use Plan 2-86 Figure 2.8.2 Floor Area of DKI Jakarta Floor Area Ratio 2-87 Figure 2.8.3 Number of Boarding and Alighting and Transferring Passengers on the Public Transportation Network in 2010 2-88 Figure 2.8.4 Potential Locations for Center Developments 2-88 Figure 3.2.1 Types of Urban Transportation Strategy by Target Group 3-2 Figure 3.3.1 Existing Major Business and Commercial Activity Cores in DKI 3-5 Figure 3.3.2 Vehicular Traffic Congestion in Central Part of DKI in 2002 3-6 Figure 3.3.3 Car Trip Generation Density 3-7 Figure 3.3.4 Person Trip Generation by Income Class 3-8 Figure 3.3.5 Car Person-Trip Generation by Income Class 3-8 Figure 3.3.6 Proposed Busways and Railways (2007) 3-9 Figure 3.3.7 Proposed Feeder Bus Services in Central Part of DKI (2007) 3-9 Figure 3.3.8 Existing 3-in-1 Area (Roads) 3-12 Figure 3.3.9 TDM Area Alternatives 1 and 2 3-12 Figure 3.3.10 TDM Area Alternatives 3 and 4 3-13 Figure 3.3.11 TDM Area Alternatives 5 and 6 3-13 Figure 3.4.1 Comparison of “Pushed Out” Ratio: Alternative 1 3-24 Figure 3.4.2 Comparison of “Pushed Out” Ratio: Alternative 2 3-24 Figure 3.4.3 Comparison of “Pushed Out” Ratio: Alternative 3 3-25 Figure 3.4.4 Comparison of “Pushed Out” Ratio: Alternative 4 3-25 Figure 3.4.5 Comparison of “Pushed Out” Ratio: Alternative 5 3-26 Figure 3.4.6 Comparison of “Pushed Out” Ratio: Alternative 6 3-26 Figure 3.4.7 Vehicular Traffic Volume: Alternative 1 [PCU/day] 3-28 Figure 3.4.8 Vehicular Traffic Volume: Alternative 4 [PCU/day] 3-29 Figure 3.4.9 Vehicular Traffic Volume: Alternative 5 [PCU/day] 3-30 Figure 3.4.10 Vehicular Traffic Volume: Alternative 6 [PCU/day] 3-31 Figure 3.4.11 Volume Capacity Ratio (1/3) 3-32 Figure 3.4.12 Volume Capacity Ratio (2/3) 3-33 Figure 3.4.13 Volume Capacity Ratio (3/3) 3-34 Figure 3.5.1 Parking Facility Users with/without Allowance from Their Employers (Private Car Users by Income Group, for Commuting Purpose Only) 3-40 viii The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Report Volume 2: Pre Feasibility Studies Figure Page Figure 3.7.1 ERP System Operation 3-43 Figure 3.11.1 Public Transport Service Coverage and Proposed Feeder Bus Services (2007) 3-78 Figure 3.12.1 Benefit and Cost Flows during Evaluation Period (in Rp. billion discounted at 12%) 3-84 Figure 3.12.2 Trip Generation of Passenger Car in TDM Area 3-86 Figure 3.12.3 Revenue and Cost of TDM 3-87 Figure 4.2.1 Existing Land Use 4-3 Figure 4.2.2 Population Density 2002 4-4 Figure 4.2.3 Home-Based Work Trip Desire Line along the Serpong Corridor 4-5 Figure 4.2.4 Motorized Modal Shares along the Serpong Corridor 4-5 Figure 4.2.5 Present Road Network along the Serpong Corridor 4-7 Figure 4.3.1 Land Use Plan 4-8 Figure 4.4.1 Double Track on Serpong Line and Improvement Facilities on Western Line 4-10 Figure 4.4.2 Serpong Line Double Tracking Between Tanah Abang and Serpong 4-14 Figure 4.7.1 Patas AC Route (Serpong Line) 4-24 Figure 4.7.2 Patas Route (Serpong Line) 4-25 Figure 4.7.3 Regular Bus Route (Serpong Line) 4-26 Figure 4.7.4 Medium Bus Route (Serpong Line) 4-27 Figure 4.7.5 Small Bus Route (Serpong Line) 4-28 Figure 4.7.6 Patas AC Route (Bekasi Line) 4-29 Figure 4.7.7 Patas Route (Bekasi Line) 4-30 Figure 4.7.8 Regular Bus Route (Bekasi Line) 4-31 Figure 4.7.9 Medium Bus Route (Bekasi Line) 4-32 Figure 4.7.10 Small Bus Route (Bekasi Line) 4-33 Figure 4.8.1 Rawa Buntu station 4-36 Figure 4.8.2 Pondok Betung station 4-36 Figure 4.9.1 Typical Cross Section in Straight 4-40 Figure 4.9.2 Standard Cross Section for Double Tracking 4-41 Figure 4.9.3 Planning Concept of Station Zoning 4-45 Figure 4.9.4 Access Road and Station Square Development Plan Station: Serpong 4-47 Figure 4.9.5 Access Road and Station Square Development Plan Station: Rawa Buntu 4-48 Figure 4.9.6 Access Road and Station Square Development Plan Station: Ciater 4-49 Figure 4.9.7 Access Road and Station Square Development Plan Station: Sudimara 4-50 ix The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Report Volume 2: Pre Feasibility Studies Figure Page Figure 4.9.8 Access Road and Station Square Development Plan Station: Jurang Manggu 4-51 Figure 4.9.9 Access Road and Station Square Development Plan Station: Pndok Ranji 4-52 Figure 4.9.10 Access Road and Station Square Development Plan Station: Bintaro (new) 4-53 Figure 4.9.11 Access Road and Station Square Development Plan Station: Pondok Betung 4-54 Figure 4.9.12 Access Road and Station Square Development Plan Station: Kebayoran 4-55 Figure 4.9.13 Access Road and Station Square Development Plan Station: Limo 4-56 Figure 4.9.14 Access Road and Station Square Development Plan Station: Palmerah 4-57 Figure 4.9.15 Access Road and Station Square Development Plan Station: Karet 4-58 Figure 4.9.16 Access Road and Station Square Development Plan Station: Sudirman 4-59 Figure 4.9.17 Access Road and Station Square Development Plan Station: rasuna Said 4-60 Figure 4.9.18

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    36 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us