(EIA) of Tribeni Irrigation Project, Kachankawal, Jhapa

(EIA) of Tribeni Irrigation Project, Kachankawal, Jhapa

Environmental Impact Assessment (EIA) of Tribeni Irrigation Project, Kachankawal, Jhapa Province No: 1 Submitted To: Ministry of Forests and Environment Singhadurbar, Kathmandu Submitted Through: Ministry of Energy, Water Resources and Irrigation Singhadurbar, Kathmandu Submitted By: Study Design and Environment Section Department of Water Resources and Irrigation Jawalakhel, Lalitpur Proponent: Prepared by: Water Resources and Irrigation Environmental Works and Services P(Ltd) Development Division, New Baneshwor, Kathmandu Bhadrapur, Jhapa Ph. No. 01-4104479/80 Ph. No. 023-455628 Email:[email protected] Email:[email protected] January, 2020 TABLE OF CONTENTS LIST OF TABLES ................................................................................................................... vii LIST OF FIGURES .................................................................................................................. ix LIST OF ABBREVIATIONS AND ACRONYMS .................................................................. x sfo{sf/L ;f/f+z............................................................................................................................... xii EXECUTIVE SUMMARY ................................................................................................... xvii Information on Project ....................................................................................................... xvii Project Proponent and Consultant..................................................................................... xvii Baseline Information .......................................................................................................... xvii Environmental Impacts of the Project ................................................................................. xx Environmental Impacts Enhancement and Mitigation Measures ....................................... xx Environmental Management Plan ....................................................................................... xx Conclusion ........................................................................................................................... xxi 1.1 Name and address of the Proponent ........................................................................ 1 1.2 Name and Address of the Consultant ....................................................................... 1 1.3 Team Involved in EIA Study ....................................................................................... 1 1. NAME AND ADDRESS OF THE INDIVIDUAL OR INSTUITION PREPARING THE REPORT ........................................................................................................... 1 2.1 Background of the Proposal ...................................................................................... 3 2. SUMMARY OF THE PROPOSAL .......................................................................... 3 2.2 Objectives of the EIA Study ....................................................................................... 4 2.3 Limitations ................................................................................................................. 4 2.4 Rationale of the Study ............................................................................................... 4 2.5 Relevancy of the Proposal ......................................................................................... 5 2.6 Impact on Land use ................................................................................................... 6 2.7 Impact on the Environment, Human life and Population ......................................... 6 2.8 Damages to the Public Utilities or Infrastructures .................................................... 7 3.1 Sources of Data ......................................................................................................... 8 3. METHODOLOGY ADOPTED FOR EIA STUDY ................................................. 8 3.2 Data Collection Methodologies ................................................................................. 9 ii 3.2.1 Desk study ..................................................................................................... 9 3.2.2 Questionnaire and Checklist Preparation for Field Survey ........................ 10 3.2.3 Field Study .................................................................................................. 10 3.3 Data Analysis/ Processing ........................................................................................ 13 3.4 Impact Assessment Methods .................................................................................. 14 3.5 Public Hearing .......................................................................................................... 16 3.6 Draft Report Preparation ........................................................................................ 22 3.7 Finalization of EIA Report ........................................................................................ 23 4.1 Project Description of the Project ........................................................................... 24 4. PARTICULARS OF THE PROJECT ..................................................................... 24 4.2 Access of the Project ............................................................................................... 25 4.3 Salient Features of the Project ................................................................................ 26 4.4 Canal Components .................................................................................................. 28 4.4.1 HeadworkDesign ......................................................................................... 28 4.4.2 Intake and Canal ......................................................................................... 28 4.4.3 Other Structures ......................................................................................... 28 4.5 Construction Planning ............................................................................................. 29 4.6 Construction Requirement of the Project ............................................................... 29 4.6.1 Construction Materials and Other .............................................................. 29 4.6.2 Project Ancillary Facilities ........................................................................... 32 4.7 Project Area Delineation ......................................................................................... 36 4.7.1 Direct Impact Area (DIA) ............................................................................. 36 4.7.2 Indirect Impact Area (IIA) ........................................................................... 36 4.7.3 Zone of Influence (ZoI) ................................................................................ 37 4.8 Construction Technology ........................................................................................ 37 4.9 Resource Consumed ................................................................................................ 37 4.10 Maintenance Approach ........................................................................................... 37 4.11 Project Schedule ...................................................................................................... 38 5.1 Review of Constitution of Nepal .................................................................................... 40 5.2 Review of Plans and Policies .......................................................................................... 40 5. REVIEW OF ACTS, POLICIES, REGULATION AND GUIDELINES .............. 40 iii 5.3 Review of Acts ................................................................................................................ 46 5.4 Review of Rules and Regulations ................................................................................... 52 5.5 Review of Guidelines. Manuals and Strategy ................................................................. 54 5.6 Review of International Conventions ............................................................................. 57 5.7 Review of Standards ....................................................................................................... 58 6.1 Physical Environment ..................................................................................................... 60 6.1.1 Land use Pattern............................................................................................. 60 6.1.2 Geology and Soil Type .................................................................................... 60 6. EXISTING ENVIRONMENTAL CONDITION .................................................... 60 6.1.3 Climate ............................................................................................................ 61 6.1.4 Hydrology ....................................................................................................... 64 6.1.5 Air, Noise and Water Quality.......................................................................... 66 6.1.6 Infrastructure Situated along the alignment ................................................. 67 6.1.6 Soil Properties of Command Area .................................................................. 67 6.1.7 Average Water Table ...................................................................................... 67 6.1.8 Seismicity .......................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    338 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us