Proposed Corrective / Preventive Actions s1

Proposed Corrective / Preventive Actions s1

<p> TTF3 Couplers </p><p>NON CONFORMANCE REPORT</p><p>Created by: Date: Report NCR# Nieland / Kiehl Sept. 18, 2008 0004 Supplier Supplier Address Communication and Power Ind. 150 Sohier Road Beverly, MA. 019158 Part name/ Number Serial Number(s) Qty Coupler / Cold Part 3964328/A.000 FC05 1</p><p>Preliminary finding  Scratches on antenna</p><p>For a full report go to: <V:\ILC\Drop Boxes\TTF3 couplers\Couplers, visual inspection complete\FC05-FH05> on the SLAC website</p><p>Picture of scratches on antenna:</p><p>MRB: : Reviewed on 8-21 / 9-10 / 9-17. Reviewed by CA. JT. TN. DK. Repair in house</p><p>Out of tolerances? □ Yes □ No Drawing # DESY Base Document 3964328/A.xxx / LAL 165-3D-1250</p><p>Proposed Corrective / Preventive actions Corrective Action </p><p>Take before and after photos of all items being repaired. Protect the coupler around the area that is being repaired with lint free cloth and / or rubber clean room glove. Use the HEPA vacuum during any particle generating operations. Remove a minimal amount of material, when abrading damaged area. With a strip of 800 grit Microfinish Cushioned Silicon Carbide Sanding Cloth (McMaster-Carr P/N 4611A314)to smooth initial damaged area, using a back and forth motion with light finger pressure to remove any sharp edges. Then finish repair by repeating previous step using 1200 grit Microfinish Cushioned Silicon Carbide Sanding Cloth (McMaster-Carr P/N 4611A313) Clean the repaired area with lint free clean room wipe and ethyl alcohol. Inspect repair and complete visual and metrology receiving inspection. ESD bag coupler cold part. Ship to Bldg. 6 for ultrasonic cleaning, leak check, and assemble for R.F. processing.</p><p>Picture after repair:</p><p>Preventive action</p><p>Person in charge of Corrective / Preventive action : Name Chris Adolphsen / Jeff Tice Date 4/14/09 Signature</p><p>Customer’s agreement □ Solution up to Manufacture/supplier X Solution was dispositioned and completed at SLAC National Accelerator Laboratory □ Proposed solution is not accepted – new proposal :</p><p>DISPOSITION Use as is □ Repair □ Rework □ Return to vendor □ Scrap □ Other □</p><p>Customer’s Agreement: Name: Date:</p><p>Closing of the Non conformance Planned corrective/preventive action has been completed: Independent verification has been completed :</p><p>Name Date Name Date Distribution:</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us