(Estimates Only Actual Costs Will Be Invoiced) Last Revised: February 2013

(Estimates Only Actual Costs Will Be Invoiced) Last Revised: February 2013

<p>(Estimates only – actual costs will be invoiced) Last Revised: February 2013</p><p>Project No. ______Location ______Consultant ______Developer ______City Project Supervisor ______Date ______</p><p>*All works below to be performed by the City of Surrey</p><p>1. WATERMAIN TESTING & CHLORINATION:</p><p>Average cost, regardless of size, to flush, test, disinfect and deliver sample to lab. A 10 hour minimum applies to all jobs at a minimum cost of $1000.</p><p>Length of Watermain Cost Location (Street/Ave) Number of Mains Extended Cost</p><p>< 100 metres of pipe = $1,000 (min) ______X ______= $______</p><p>101 m - 200 m of pipe = $1,800 ______X ______= $______</p><p>201 m - 300 m of pipe = $2,400 ______X ______= $______</p><p>301 m - 400 m of pipe = $3,000 ______X ______= $______</p><p>401 m – 500 m of pipe = $3,200 ______X ______= $______</p><p>501 m – 700 m of pipe = $3,500 ______X ______= $______</p><p>701 m – 1200 m of pipe = $5,000 ______X ______= $______</p><p>Note: Large diameter pipe longer than 1000m will cost in excess of $5,000, depending on access. May require a more detailed estimate. TOTAL 1:$ ______</p><p>2. WET TAP ONLY FOR 19mm- 50mm SERVICE CONNECTIONS: Installation of the remaining service connection and reinstatement of the road crossing. Materials to be supplied by the Developer.</p><p>Size of Existing Watermain Lot Numbers Cost (Labour Only) Extended Cost</p><p>Tap onto a 100mm pipe ______$500 X______= $______</p><p>Tap onto a 150mm pipe ______$500 X______= $______Tap onto a 200mm pipe ______$600 X______= $______</p><p>Tap onto a 300mm pipe @ ______$600 X______= $______</p><p>Tap onto a 400mm pipe @ ______$750 X______= $______</p><p>TOTAL 2: $ ______</p><p>3. WATERMAIN TIE-INS: Any tie-in greater than 300mm is to be reviewed and estimated by the Water Operations Manager. Materials to be supplied by the Contractor at the Developer's cost.</p><p>Size Location(s) Cost Number Extended Cost</p><p>100mm to 300mm ______$9,000 X _____= $______</p><p>______</p><p>______</p><p>> 300mm ______Requires Estimate ☐ $______</p><p>TOTAL 3:$ ______</p><p>Minimum cost of $500 per visit for City Water Ops to witness Water Tie-Ins.</p><p>4. SERVICE CONNECTIONS TO EXISTING MAINS: City of Surrey to supply materials.</p><p>Lot Number Street Size Near Side or Far Side Number Extended Cost</p><p>______20mm $3,500 $6,500 X ______= $______</p><p>______25mm $3,700 $6,500 X ______= $______</p><p>______38mm $4,000 $7,000 X ______= $______</p><p>______50mm $7,000 $10,000 X ______= $______</p><p>TOTAL 4: $______5. INSTALLATION OF FIRE HYDRANTS:</p><p>Locations Cost Number Extended Cost</p><p>______Near side $10,500 X______= $ ______</p><p>______Far Side $17,500 X______=$ ______</p><p>TOTAL 5:$ ______</p><p>6. RELOCATION OF EXISTING HYDRANTS: Remove hydrant & valve, install blind flange and install standard hydrant assembly & valve. More complex relocations are to be reviewed and estimated by the Water Operations Manager. Work by City of Surrey includes labour and materials.</p><p>Locations Description Cost Number Extended Cost</p><p>______Near side of main $ 8,000 X ______=$ ______</p><p>______Far side of main $13,000 X ______=$ ______</p><p>______Extend hydrant lead $5,200 X ______=$ ______</p><p>______Abandon hydrant $ 4,200 X ______=$ ______</p><p>______Complex relocation Requires Estimate ☐ $______</p><p>Total 6:$ ______</p><p>7. FIRELINE / DOMESTIC CONNECTIONS : Any connections greater than 200mm are to be reviewed and estimated by the Water Operations Manager. Work by City of Surrey includes labour and materials.</p><p>Locations Size Near Side Far Side Number Extended Cost</p><p>______50 mm $7,000 $10,000 X ______=$ ______</p><p>______100 mm – 200 mm $12,000 $20,000 X ______=$ ______</p><p>______> 200mm Requires Estimate ☐ $______TOTAL 7: $______8. RELOCATE / EXTEND EXISTING RESIDENTIAL CONNECTIONS TO NEW PROPERT LINE: </p><p>Connections that involve tree conflicts are to be reviewed and estimated by the Water Operations Manager.</p><p>Lot Number Size Cost Number Extended Cost</p><p>______20mm $1,500 X ______= $______</p><p>______25mm $1,700 X ______= $______</p><p>______38mm $2,000 X ______= $______</p><p>______50mm $2,500 X ______= $______</p><p>______Tree Conflict Requires Estimate ☐ $______</p><p>TOTAL 8: $______</p><p>9. ABANDON EXISTING RESIDENTIAL SERVICE CONNECTIONS : </p><p>For water connections 50mm in diameter and smaller. Abandonments that involve tree conflicts are to be reviewed and estimated by the Water Operations Manager. </p><p>Lots Cost Description Number Extended Cost</p><p>______$1,500. for connections in boulevard areas X ______= $______</p><p>______$3000. for connections under sidewalk X______= $ ______</p><p>______$4,500. for connections under curb or asphalt X______= $______</p><p>______Tree Conflict Requires Estimate ☐ $______</p><p>TOTAL 9: $______</p><p>10. ABANDON EXISTING WATERMAIN AT THE DEVELOPER’S COST :</p><p>General Location Cost Description Number of Main(s) Extended Cost</p><p>______$15,000 Abandon existing Watermain(s) X ______= $______Refer to design drawings </p><p>TOTAL 10: $______11. TRANSFER EXISTING WATER SERVICE CONNECTION(S) TO NEW WATERMAIN AT THE DEVELOPER’S COST:</p><p>Contractor is to install water connections off of the new main at time of main installation and bring service connections to the location of the existing Water Daigle at property line. Contractor is to excavate existing water connections at property line for Surrey personnel to transfer the connections and abandon the old service connections.</p><p>Address Cost Description Number Extended Cost</p><p>______$200 Transfer Connection(s) X ______= $______</p><p>______$200 </p><p>______$200 </p><p>TOTAL 11: $______</p><p>12. ABANDON EXISTING WATERMAIN AT THE CITY’S COST:</p><p>General Location Cost Description Number of Main(s) City’s Cost</p><p>______$15,000 Abandon existing Watermain(s) X ______= $______Refer to design drawings </p><p>TOTAL 12: $______</p><p>13. TRANSFER EXISTING WATER CONNECTION(S) TO NEW WATERMAIN AT CITY’S COST:</p><p>Address Cost Description Number City’s Cost</p><p>______$200 Transfer Connection(s) X ______= $______</p><p>______$200 </p><p>______$200 </p><p>TOTAL 13: $______</p><p>TOTAL DEVELOPER’S ESTIMATE: $______(Totals 1-11, inclusive)</p><p>TOTAL CITY’S ESTIMATE: $______(Totals 12-13, inclusive)</p><p>D:\Docs\2018-05-08\041a0f325a9fa5a2251ed04a05717be1.docx</p><p>RT 6/9/18 9:08 a6/p6</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us