<p>API RP 575 Inspection of Tanks</p><p>May 8, 2017 10:30am to 11:00am, Las Vegas</p><p>John Scott, LyondellBasell Industries, Study group Chair</p><p>Study Group Agenda:</p><p>Discuss Study Group approach</p><p> Reaffirm?</p><p> Minor changes?</p><p> Need Master Editor?</p><p>Meeting Notes:</p><p>Discussed the know issues with the current document to determine the pathforward. There are currently no score card issues other than a note to recheck the new material added related in the last edition related to LPG tanks. The following items were discussed as areas needing improvement:</p><p> Tank floor chime sealing issue</p><p> Normative references</p><p> Definition consistency/Acronyms</p><p> Refrigerated tank score card item</p><p> Should/shall review</p><p> Sync with 653 minor changes</p><p>This list preliminary list was deemed sufficient to require a Task Group and Mater Editor to update the document.</p><p>It was required that we have an SCAST Vice Chair – Nelson Acosta volunteered.</p><p>An SR3 form has been submitted for Master Editor (post meeting)</p><p>Pathforward for next meeting in Dallas:</p><p>1. Hope to have a Master Editor assigned by then</p><p>2. Will request input for more specific score card items from SCI and SCAST</p><p>3. Will Schedule a Task group meeting at the fall meeting in Dallas to begin pulling together issues for the Master Editor to work on</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-