Alberta E9-1-1 Advisory Association

Alberta E9-1-1 Advisory Association

<p> Alberta E9-1-1 Advisory Association</p><p>Alberta Wireless E9-1-1 Trial Team </p><p>Minutes of Meeting #99-06 </p><p>Date: April 27th, 1999, 0815 /1500. Fire Dept Control Center, 107 - 7th Ave N.E., Calgary.</p><p>Attendance:</p><p>Henry Patram Calgary Fire PSAP Present – Yes</p><p>Chris Kellett Edmonton Police PSAP Present – Yes</p><p>Richard Bzdega TELUS (TCI) Alberta 9-1-1 Present – Yes</p><p>Rick Defleming TELUS (TCI) Technical Support Present – Yes</p><p>Bob Murphy TELUS (TCI) Technical Support Present – Yes</p><p>Scott McArthur TELUS Mobility Wireless Carrier Rep. Present – Yes</p><p>Jim Yee TELUS Mobility Technical Support Present – Yes!</p><p>Joel Thorpe Rogers Cantel Wireless Carrier Rep. Present – Yes</p><p>James C. Taylor Rogers Cantel Technical Support Present – Yes</p><p>Dennis Beland Microcell Wireless Carrier Rep. Present – Yes!</p><p>Sylvain Lapointe Microcell Technical Support Present – Yes</p><p>Parke Davis Clearnet Wireless Carrier Rep. Present – Yes</p><p>Wes Semeniuk Clearnet Technical Support Present – Yes!</p><p>Next Meeting: May 31, 1999, time – 1500/2000. Vancouver Convention Center, Meeting Room #11.</p><p>99-06.01 Formally adopt March 26th Meeting Minutes CLOSED</p><p>Minor changes were noted, and the amended Minutes were formally adopted for circulation.</p><p>99-06.02 Microcell Proposal (TABLED – indefinitely) TABLED (indefinitely)</p><p>99-06.03 TELUS Mobility Proposals x 2 (TABLED – indefinitely) TABLED </p><p>(indefinitely)</p><p>99-06.04 Clearnet Proposals x 2 (TABLED – indefinitely) TABLED </p><p>(indefinitely)</p><p>99-06.05 TELUS E9-1-1 Proposal (Follow-up moved to agenda items 99-06.07 to 99-06.12) Reference the Noted Items</p><p>99-06.06 Future Involvement of Vendors: CML, XYPoint, & SCC TABLED </p><p>It was unanimously agreed that in relation to the Trial, the offer of assistance from (indefinitely) SCC was appreciated; however their services were not required. With regard to individual participants approaching any of the listed vendors off-line for assistance, it was agreed that this is a private matter outside the scope of the Trial preview.</p><p>It was agreed that Henry Patram would draft and send a letter of thanks for the offer of assistance from SCC. </p><p>99-06.07 Memorandum of Understanding (Follow-up from 99-05.07) ONGOING</p><p>Dennis Beland called in specifically to deal with this portion of the meeting. Extensive discussions and review of the MOU resulted in a number of changes and additions to the document. It was agreed that a version 2 of the document would be circulated by May 11th, with a strong focus towards finalizing the MOU in June.</p><p>Everyone complimented Dennis Beland on an excellent first draft of the document.</p><p>99-06.08 ESRD Numbering Plan (Follow-up from 99-05.08) ONGOING</p><p>This item was reviewed, and it was agreed that this information would be finalized as part of Schedule ‘B’ of the MOU.</p><p>99-06.09 Trunking Arrangements (Follow-up from 99-05.09) ONGOING</p><p>This item was reviewed, and it was agreed that this information would be finalized as part of Schedule ‘B’ of the MOU.</p><p>99-06.10 Geographical Coverage of Trial Area (Follow-up from 99-05.10) ONGOING</p><p>This item was reviewed, and it was agreed that this information would be finalized as part of Schedule ‘A’ of the MOU.</p><p>99-06.11 PSAP Screen Configuration & Presentation (Follow-up from 99-05.11) ONGOING</p><p>This item was reviewed, and it was agreed that this information would be finalized as part of Schedule ‘C’ of the MOU. 99-06.12 Project Plan (Follow-up from 99-05.12) ONGOING</p><p>A comprehensive outline of what the Project Plan should contain, was discussed. It was acknowledged that this would be a living document that requires adjustments as we move forward through the Trial. It was agreed that the Project Plan would be finalized as Schedule ‘D’ of the MOU.</p><p>99-06.13 NEW BUSINESS </p><p> a. NENA Wireless Congestion Control Committee INFO ONLY</p><p>Chris Kellett advised that he is participating with a group of people from Canada and the U.S. in relation to this important issue. The group includes the CTIA, some U.S. Wireless companies, and PSAP’s. The mandate is to look at developing high level guidelines, similar to the wireline standard of P.001, to assist NENA with developing a recommended approach for the future. The work is at the very preliminary stages. Kellett committed to making any relevant information available to the Trial, as well as the Wireless E911 Working Group.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us