Borough of Poole s1

Borough of Poole s1

<p> AGENDA ITEM NO 8</p><p>BOROUGH OF POOLE</p><p>PLANNING OBLIGATIONS (RECREATIONAL CONTRIBUTIONS) SUB-GROUP</p><p>22 JULY 2014</p><p>REPORT OF THE HEAD OF ENVIRONMENTAL AND CONSUMER PROTECTION SERVICES</p><p>PROGRESS UPDATE AND CURRENT FINANCIAL POSITION</p><p>1 Purpose</p><p>1.1 To inform Members of the status of planning obligations funded projects and the current financial position of Section 106 funding</p><p>2 Recommendation</p><p>2.1 Members are recommended to note the contents of this report.</p><p>3 Progress Report: Current planning obligations funded projects </p><p>3.1 Appendix 1 provides an update on the status of projects that have allocated commitments. This includes all outstanding commitments for both the Planning Obligations Recreational Contributions and the Specific Recreation Contributions.</p><p>4 Planning Obligations Fund financial position</p><p>4.1 Appendix 2 provides the Planning Obligations Recreational Contributions Position Summary as at 31 May 2014.</p><p>SHAUN ROBSON HEAD OF ENVIRONMENTAL AND CONSUMER PROTECTION SERVICES</p><p>Contact Officers: Kate Mitchell, Open Spaces Development Manager (01202) 261755 Appendix 1: Approved commitments as at 31 May 2014</p><p>The following table provides a breakdown of all approved commitments for Recreational Contributions. These commitments have been approved by either the relevant Portfolio Holder or Service Unit Head and also been allocated a capital cost code by Finance.</p><p>Fund Approved Projects Sub- SU Status commitment Group date Major £72,488.34 Built Sports Facility 24.01.13 C&CL £1k retained until built and Play Pitch finalised. Going to facilities Strategy £19k, of Full Council to be which £1.5k adopted following remains minor amends from EO&SC. Carter Community 23.11.06 C&CL Report being Changing Facilities submitted to £70k of which Planning Obs Sub £45,988.34 Group July 2014. remains Ashdown Athletics 16.01.14 C&CL Decision from Track £25k external funders expected in August 2014. Youth/ £45.32 Carter Community 23.11.06 C&CL Report being Adult Changing Facilities submitted to outdoor £45.32 Planning Obs Sub play Group July 2014. Upton £19,876.00 £19,876 allocated 16.01.14 C&CL Progressing draft Country to UCP HLF bid bid in line with HLF Park processes. Beaches £227,575.16 Lake Pier Toilets 16.07.13 E&CPS Project in progress. and Poole Harbour Options paper to Canoe Club Boat EO&SC 1 May Store £66k 2014. allocated of which £65,429.82 remains Sandbanks Blue 30.03.12 C&CL Path works Flag Path £8,140 complete. C&CL to allocated of which make decision on £2,145.34 remains use of remaining funds. CCTV along 16.01.14 C&CL Project to be seafront £70k progressed during 2014. Accessible toilet 16.01.14 C&CL Project to be and ramp at progressed during Branksome Prom 2014. £90k Poole £220,730.29 Poole Park 05.11.13 E&CPS In progress. Phase Park Heritage Lottery 1 HLF application to Fund £230k be submitted August allocated of which 2014. £220,730.29 remains ECP – £12,000.00 Belben 16.12.11 E&CPS First funds will Alderney Road/Bowden become at risk in Road Play /Area 2015/16. Listed on £12k Open Space Forward Plan for 2014/15. CP&AOS £901.32 Tucker’s Field 05.11.13 E&CPS Bulk of project – £12,036 of which completed. Final Hamwort £901.32 remains works due summer hy East 2014. CP&AOS £28,777.76 Town Centre 24.02.10 C&CL Planning obs sub – Poole Regeneration Area group agreed to Town Open Space reallocate to CP&AOS improvements Guildhall/ Maypole (Guildhall, St space on 7 May James’, Hunger 2014. Funds to be Hill) £10k used for Design 3 Open 23.08.07 C&CL design/artist/ Spaces within the involvement. West Quays Town Centre £20k of which £19,511.60 remains CP&AOS £16,631.33 Alexandra Park 16.07.13 E&CPS In progress. Lights – Penn footpaths and in place, the last Hill lighting phase II section of footpath £96,800 allocated due for resurfacing of which early 2014. £16,631.33 remains CP&AOS £26,044.99 Branksome Park 16.07.13 C&CL Sport England – Canford Bowls Club rejected expression Cliffs pavilion of interest as development £25k sporting interest not great enough (priority Young People). Waiting on further funding streams to appear to progress project. No appropriate streams at present. Canford Cliffs 08.07.11 E&CPS Ongoing, likely Pocket Park £4k of completion 2014/15. which £1,044.99 remains CP&AOS £10,000.00 Alderney West 19.03.09 E&CPS MUGA belongs to – Community Centre community centre Alderney Multi Use Games who would Area & Play £10k approach BoP with (this was due to be quotes when work used for 10 years needed maintenance) CP&AOS £20,000.00 Newtown 05.11.13 E&CPS In progress. Public – Development consultation held Newtown Phase – sub-group May-June 2014. and PFH Analysing of recommended findings summer allocation of 2014. Detailed £31,027.68 ECP design and £394,139.13 autumn/winter 2014. CP&AOS. Finance has currently allocated £20k for development work. CP&AOS £25,000.00 Broadstone (links 02.03.06 E&CPS Topic went to Area – Broad- between RoW at Cttee 5 June 2014. stone Old Railway Transportation Cutting, Ashington advised that there is Cutting and Middle not a current Block Corfe Hills) scheme to progress. £25k Specific £79,855.01 Hamworthy Park 11.09.12 E&CPS/ Project to be Recrea- Improvements C&CL redefined. Funds to tion be spent on Contrib- ‘necessary utions – improvements to the Shapwick park’ as a result of Road increased pressure from development by 2015/16. ECP = Equipped children’s play CP&AOS = Casual Play and Amenity Open Space</p><p>Projects finalised since previous position update (7 May 2014):</p><p>Projects Sub- SU Status Group date Built Sports Facility and Play 24.01.13 C&CL Adopted by Council June 2014. £1k Pitch Strategy £5k retained, to be released shortly. Upton Park Play and 16.12.11 E&CPS Project completed 2013. Final spend Recreation Enhancements £60,001.50. £60k allocated North Road playing field, 16.12.11 E&CPS Project completed 2014. Final spend Constitution Hill and £117,265.40. £2,734.60 returned to Parkstone Heights open Parkstone ward pot. space improvements Alderney West Community 11.09.12 E&CPS Project completed 2013. Final spend Centre pedestrian access £2,499.72. £2,500.28 returned to £5k Alderney ward pot. Christopher Crescent (now 17.01.08 E&CPS Project completed 2013. Final spend Stanley Green Park) open £29,943.12. £56.88 returned to space improvements £30k Oakdale ward pot. Plainfield Farm and 24.01.13 E&CPS Project completed 2013. Final spend Charborough Road feasibility £4,700.00 £300 returned to studies £5k Broadstone ward pot. Poole Park Pavilion £18.5k 30.03.12 E&CPS Project completed spring 2014. Final spend £18,500. Poole Park Tennis Courts 16.12.11 C&CL Project complete. Final spend £60k £60,000. Retainer being used for defects as at end of liability period. Play and Landscaping 16.12.11 E&CPS Project completed 2013. Final spend Improvements to Green £90,000. Road play Area £90k Evening Hill footpaths 24.01.13 E&CPS Project completed 2013. Final spend £18,600 and £18,512. £88 returned to Pen Hill 16.07.13 ward pot. Alexandra Park footpaths 24.01.13 E&CPS Project completed 2013. Final spend phase 1 £65k £65,000. Appendix 2: Recreational contributions position summary as at 31st May 2014</p><p>Youth/ Borough wide funds Major built Adult Upton Beaches Poole outdoor Country facilities play park park</p><p>Income received 474,380.53 238,395.12 234,041.30 814,155.34 904,008.14</p><p>Cumulative spend to date -390,825.74 -229,255.78 -212,152.80 -472,396.04 -675,604.12</p><p>Total available for allocation 83,554.79 9,139.34 21,888.50 341,759.30 228,404.02</p><p>Approved commitments -72,488.34 -45.32 -19,876.00 -227,575.16 -220,730.29 As at 31st May 2014</p><p>Remaining balance 11,066.45 9,094.02 2,012.50 114,184.14 7,673.73</p><p>Ward Based Funds Equipped childrens play Income Cumulative Balance Approved Remaining collected expenditure remaining commitments Balance</p><p>010 - Hamworthy East 48,884.58 -43,443.89 5,440.69 0.00 5,440.69 020 - Poole Town 356,495.91 -273,342.98 83,152.93 0.00 83,152.93 030 - Parkstone 159,435.18 -136,000.00 23,435.18 0.00 23,435.18 040 - Penn Hill 144,582.33 -100,733.06 43,849.27 0.00 43,849.27 050 - Canford Cliffs 179,605.10 -151,248.05 28,357.05 0.00 28,357.05 060 - Branksome West 55,023.26 -34,050.61 20,972.65 0.00 20,972.65 070 - Alderney 37,148.58 -24,000.00 13,148.58 -12,000.00 1,148.58 080 - Newtown 167,772.69 -135,442.71 32,329.98 0.00 32,329.98 090 - Oakdale 74,553.24 -65,102.17 9,451.07 0.00 9,451.07 100 - Canford Heath West 3,552.76 0.00 3,552.76 0.00 3,552.76 110 - Creekmoor 14,507.03 -14,000.00 507.03 0.00 507.03 120 - Broadstone 43,344.08 -20,000.00 23,344.08 0.00 23,344.08 130 - Merley & Bearwood 11,637.27 -7,000.00 4,637.27 0.00 4,637.27 140 - Hamworthy West 28,973.02 -20,769.72 8,203.30 0.00 8,203.30 150 - Branksome East 44,786.95 -44,933.00 -146.05 0.00 -146.05 160 - Canford Heath East 1,342.55 0.00 1,342.55 0.00 1,342.55</p><p>- 1,371,644.53 1,070,066.19 301,578.34 -12,000.00 289,578.34 Ward Based Funds Casual play and amenity Available Cumulative Balance Approved Remaining open space Funds expenditure remaining commitments Balance</p><p>010 - Hamworthy East 156,633.35 -155,731.06 902.29 -901.32 0.97 020 - Poole Town 509,955.18 -426,857.32 83,097.86 -28,777.76 54,320.10 030 - Parkstone 656,532.96 -459,198.03 197,334.93 0.00 197,334.93 040 - Penn Hill 582,148.68 -478,331.91 103,816.77 -16,631.33 87,185.44 050 - Canford Cliffs 263,675.97 -216,294.40 47,381.57 -26,044.99 21,336.58 060 - Branksome West 163,965.08 -130,304.85 33,660.23 0.00 33,660.23 070 - Alderney 168,459.12 -159,425.02 9,034.10 -10,000.00 -965.90 080 - Newtown 568,822.30 -169,918.37 398,903.93 -20,000.00 378,903.93 090 - Oakdale 256,033.39 -223,326.12 32,707.27 0.00 32,707.27 100 - Canford Heath West 18,002.59 -6,957.19 11,045.40 0.00 11,045.40 110 - Creekmoor 36,775.11 -28,861.11 7,914.00 0.00 7,914.00 120 - Broadstone 132,912.47 -88,282.14 44,630.33 -25,000.00 19,630.33 130 - Merley & Bearwood 37,562.47 -10,403.25 27,159.22 0.00 27,159.22 140 - Hamworthy West 104,337.84 -97,428.98 6,908.86 0.00 6,908.86 150 - Branksome East 162,365.80 -90,876.99 71,488.81 0.00 71,488.81 160 - Canford Heath East 6,048.89 -1,604.00 4,444.89 0.00 4,444.89</p><p>- 3,824,231.19 2,743,800.74 1,080,430.45 -127,355.40 953,075.05</p><p>Summary of unallocated funds as at 31 May 2014 Casual play and open space £1,76,945.42 Major built facilities £11,066.45 Youth and Adult play £9,094.02 Equipped play £289,578.34 TOTAL £1,386,684.23</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us