Request for Bid Proposal

Request for Bid Proposal

<p> REQUEST FOR BID PROPOSAL TRADE: ATTN: Estimating Project Name: Cinnaminson High School Phase II, Middle School Fire Alarm Job # 99-118 Additions and Renovations to High School & Middle School Fire Alarm replacement Cinnaminson, New Jersey</p><p>RFI Due Date: May 4, 2015, 3:00pm</p><p>Bid Due Date: May 20, 2015, 3:00pm Architect: Garrison Architects Scope of Work: Additions and Renovations to Four (2) schools; Middle School Fire Alarm, High School; All trades including erosion control, earthwork, utilities, site concrete, paving, stripe & signage, fence, landscape, site furnishings, abatement, selective demolition, building demolition, concrete, masonry, masonry restorations, structural and misc. steel, gauge framing and sheathing, expansion control assemblies, rough carpentry, finish carpentry, millwork, damproofing, waterproofing, vapor barrier, water repellants, insulation, fireproofing, firestop, air barriers, metal roofing and wall panels, EPDM roofing, roof restorations, flashings ,trims, and roof accessories, intumescent paint, joint sealants, doors, frames, and hardware, FRP doors, vault doors, fire shutters, storefronts, windows, sliding windows, glazing, GWB partitions, tile, ACT, acoustical wall and ceiling panels, wood floor repair and refinish, terrazzo, flooring, paint, toilet accessories, toilet partitions, signage, metal lockers, FE & Cabinets, classroom/office furniture, science/lab & prep room furniture, stage lift, theatrical equipment & systems, food service equipment, gym equipment, window shades, plastic laminate casework, floor mats, audience seating, elevator, HVAC, plumbing, fire protection, electrical, fire alarm, temp protections, cut & Patch, phasing per documents as referenced in summary of work spec section 01010 & sequence of work 01015. The balancing and commissioning is direct to the owner. MEP trades to provide commissioning assist. </p><p>Additions & Renovations Square Foot – 161,762 SF </p><p>PLA, Sales tax exempt Unit Prices & Alternates: See attached, Alternates 1 - 9 Completion: Phase II High School – completion 8-19-16 Middle School Fire Alarm work – Summer Schedule 2016 Note: Project Begins when school is out for summer in June 2015.</p><p>Please fax back to (856) 988-0508 15 W STOW ROAD  MARLTON, NJ 08053  WWW.HESSERT.COM T: 856-988-0507  F: 856-988-0508 Bid Documents: Drawings and specifications are available at www.hessert.com Click on “Subcontractor/Supplier Login” Addendum: Addendum(s) will be posted at www.hessert.com as issued</p><p>Jim Gibson Chief Estimator T: (856) 552-3115 (direct) Email: [email protected]</p><p>***FAX THIS FORM BACK*** FAX THIS FORM BACK***FAX THIS FORM BACK*** FAX THIS FORM BACK</p><p>PLEASE FILL IN COMPANY NAME: </p><p>YES, WE WILL BE SUBMITTING A BID PROPOSAL NOT BIDDING</p><p>Please fax back to (856) 988-0508 15 W STOW ROAD  MARLTON, NJ 08053  WWW.HESSERT.COM T: 856-988-0507  F: 856-988-0508 </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us