![Note: Instructions Are on the Reverse Side of This Sheet](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
<p>USDA KS-ADS-26 NCS Rev. 4/04</p><p>CONTRACT REVIEW SUMMARY</p><p>Note: Instructions are on the reverse side of this sheet</p><p>Watershed: Estimate No.: </p><p>Project Agreement No.: Contract No.: (Double click on the table below to enter data. Ctrl + home, then click outside the table to exit and save changes) Site Item Mod. or Remarks +$, 25% +$, Contract No. No. Est. No. (Quantity - Price) Variation Modification</p><p>(more) (more) -2-</p><p>INSTRUCTIONS</p><p>Distribution: Attach this Form KS-ADS-26 to a payment estimate as follows: Original to state office Copy to government representative Copy to contracting officer Copy to contractor</p><p>Preparation is made by the government representative at the time of first variation in contract price due to modification or variation for each succeeding pay estimate.</p><p>If any change that appeared on a previous estimate (and therefore on a previous Form KS-ADS-26) is affected by a subsequent change in unit price and/or status (25% variation to modification, etc.), the original entry(s) should be shown, then lined out, and the new entry made below. Example: An item shown in the 25% variation is later modiied, and that amount is included in the modification.</p><p>Items should be grouped by estimate or modification number and then by site number. Total the items below the last entry.</p><p>(more)</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-