<p> WIMES 8.05 Page 1 1. APPENDIX C1 - ODOUR CONTROL EQUIPMENT DATA SHEETS</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 2 PROJECT TITLE (P) DOCUMENT REFERENCE (P) PROJECT NUMBER (P) REVISION (P) PROJECT LOCATION (P) DATE (P) SUPPLIER (P/S) REFERENCE DRAWINGS INCLUDED (Y/N) (P)</p><p>* - Indicates Purchaser’s default requirement 3 Air Composition and Physical Properties (If Known) (P) 3.0 OPERATING ENVIRONMENT AND SITE Composition Mean Max DETAILS 3 Odour conc. (ouE/m ) 1 Operating Environment (P) H2S conc. (ppm) Location () NH3 conc. (ppm) Inland Coastal Inside Outside Details of Processes Causing Sudden Increases in Odorant Concentrations Other (specify) Hazardous Area Classification () Physical Properties Min Mean Max None Zone 1 Temperature (°C) Zone 2 Relative humidity (%) EMC Environment () 1st environment – C1 1st environment – C2 2nd environment – C3 3 Source of Air Composition Data () (P) 2 Ambient Air Temp/RH (10°C-40°C/<100%*) (P) Actual sampling/analysis 3 Special Environmental Hazards (P) Theoretical data 4 Further Information to Assist Supplier in Equipment Design (P) 4 References For Further Information (P)</p><p>4.0 SOURCE(S), VOLUME AND PROPERTIES OF ODOROUS AIR</p><p>1 Source(s) and Volume of Odorous Air (P) Source(s) (P)</p><p>Volume (m3) (P) 2 Design Number of Air Changes per Hour Required/Provided (P/S) 2 Design Air Flow Rate Required /Provided (m3/hr) (P/S</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 3</p><p>Process Odour Conc. H2S Conc. RH (%) Further Details 3 Unit (ouE/m ) (ppm) Referenc Mean Max Mean Mean Max Mean Mean e</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 4 5.0 PERFORMANCE SPECIFICATION 1 LCC Assessment Required (Y/N) (P) 5.1 General</p><p>1 Service Life (years) (P)</p><p>5.2 Odour Treatment Performance</p><p>1 Performance At Outlet Stack (P) Maximum Odour 3 Concentration (ouE/m ) Maximum Concentrations of Specific Odorants</p><p>H2S (ppm)</p><p>NH3 (ppm) Other (specify) 2 Performance At Nearest Receptor (P) Maximum Odour 3 Concentration (ouE/m ) Maximum Concentrations of Specific Odorants</p><p>H2S (ppm)</p><p>NH3 (ppm) Other (specify) 2 Dispersion Model Used (P/S)</p><p>5.3 Noise</p><p>1 Maximum Noise Levels (<80* dB(A) at 1 m) (P) </p><p>5.4 Life Cycle Costs</p><p>5.4.1 General</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 5 Specified Duty Point (For Use with 5.4.4 Service Lives and Costs of Components Sections 5.4.2, 5.4.3 and 5.4.4, where LCC and Treatment Media Model 06 is not used) 1 Guaranteed (G) and Expected (E) Service Design Air Flow Rate Lives of Components at Specified Duty (m3/hr) (Clause 4.2) Point (x 103 hrs) (P/S) Mean Inlet Odour Load (Clause 4.3) Component G E Odour conc. (ou /m3) E Chemical dosing pumps H S (ppm) 2 Re-circulating pumps NH (ppm) 3 Fans Other (specify) Media support grilles Required Process Performance (At Outlet Pre-filters Stack or Nearest Receptor, As Appropriate) (Clause 5.2.1) Nozzles (biofilters) Maximum Odour 2 Costs of Components (£)/Time Required 3 Concentration (ouE/m ) to Replace Components (hrs) (S) Maximum Concentrations of Specific Component Cost Time Odorants Chemical dosing pumps</p><p>H2S (ppm) Re-circulating pumps</p><p>NH3 (ppm) Fans Other (specify) Media support grilles Pre-filters 5.4.2 Power Input Nozzles (biofilters) Other (specify) 1 Equipment Power Input at Specified Duty Point 3 Guaranteed Service Lives of Treatment (kW) (S) Media at Specified Duty Point (P/S) Media (specify) Life (Years) 5.4.3 Consumption of Chemicals and Potable Water (Required for Wet Scrubbers)</p><p>1 Consumption of Specific Chemicals 4 Replacement (R)/Disposal (D) Costs of /Potable Water at Specified Duty Point (S) Media (£)/Time Required to Replace Chemical (Specify) or Volume Used* Media (hrs) (S) Potable Water (m3) Media (specify ) Cost Time</p><p>5 Selective Adsorption Capacity (SAC) and Cost of Media (Dry Scrubbers) * - per year of continuous operation Odorant (Specify) SAC (kg/tonne)</p><p>Odorant (Specify) Cost (£/tonne)</p><p>6.0 DESIGN SPECIFICATION</p><p>6.1 General</p><p>6.1.1 General</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 6 1 Summary of Treatment Processes Required/Provided6.1.3 (P/S) Ductwork (Incorporating Dampers) Source and Nature of Treatment Process Required/ Provided to Odorant (P/S) Remove Odorant (P/S)6.1.3.1 Ductwork a 4 Outdoor Ductwork Material (GRP/PVC- b U*) (P) c d 10 Type of Drain Trap Reqd./Provided (P/S) e f 12 Ductwork Colour (P)</p><p>6 Reference for Purchaser’s Particular 13 Ductwork Earthing Specification for Labelling (P) Required (Y/N) (P)</p><p>6.1.2 Covers and Connections</p><p>1 Cover Material () (P) GRP* Aluminium Cloth Other (specify) 1 Covers to Comply with Appendix G (Y*/N) (P)</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 7 6.1.3.2 Control, Balancing and Isolating Dampers 3 Flow Monitoring Facilities Required (Y/N) 3 Damper and Non-Return Flap Spindle and (P) Blade Materials (P) 3 Type and Location of Flow Monitoring Stainless steel no. 1.4401 Facilities (P) (AISI 316) GRP reinforced UPVC Other (specify) 6.1.7 Outlet Stack (Where Required/Provided)</p><p>6.1.6 Monitoring Facilities and Equipment 2 Height (m) (P) 3 Minimum Efflux Velocity (m/s) (P/S) 8 Reference for Purchaser’s Particular Specification for Lightning Protection (P)</p><p>6.1.8 Fans</p><p>6.1.8.1 General</p><p>1 Assist/Standby Fan(s) Required (Y/N) (P) 7 Requirements for the Use of Variable Speed Drives (P)</p><p>6.1.8.2 Casing(s)</p><p>1 Material (S)</p><p>6.1.8.3 Impeller(s)</p><p>1 Material (S)</p><p>2 Method of Securing Impellers to Shafts () (S) Key Bolt Conical taper Other (specify)</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 8 6.1.8.4 Drive System</p><p>2 Drive Systems to be Oversized (Y/N) (P) 2 Degree of Oversizing Required (%) (P)</p><p>6.1.8.5 Acoustic Enclosure(s)</p><p>1 Acoustic Enclosures Provided (Y/N) (S) 3 Dimensions (L x W x H) (m) (S) 3 External Colour (P/S) 4 Locking Arrangements (P/S)</p><p>6.1.9 Weights and Lifting Arrangements</p><p>1 Weights of Major Components (S) Component Weight (kg)</p><p>1 Heaviest maintenance lift (S) 1 Heaviest erection lift (S)</p><p>6.1.13 Maintainability</p><p>2 Maintenance Interval for Provision of Access Equipment (Months) (P) 2 Type of Access Equipment Required/Provided (S)</p><p>6.1.14 Guarding</p><p>5 Full Length Hinges Required (Y*/N) (P)</p><p>6.1.16 Lagging and Trace Heating (Where Required/Provided)</p><p>1 Frost Protection Afforded Down to: (-10°C*) (P) 3 Reference for Particular Specification (P)</p><p>ISSUE 2 FEBRUARY 2015 WIMES 8.05 Page 9 6.1.17 Local Control Panel (LCP) and Associated Electrical Installation (Where Required/Provided)</p><p>1 LCP Required/provided (Y/N) (P/S) 2 LCP and Electrical Installation Specification (WIMES 3.04*) (P)</p><p>3 Position of LCP (P/S)</p><p>6.1.18 O & M Manuals</p><p>1 Reference for Purchaser’s Particular Specification (P)</p><p>6.1.19 Training</p><p>1 Reference for Purchaser’s Particular Specification (P)</p><p>ISSUE 2 FEBRUARY 2015 6.2 Wet Scrubber Installations (Where Required/Provided)</p><p>1 Process Reference (See Section 6.1.1) (P/S)</p><p>6.2.1 General 6.2.3 Scrubbing Liquid Dosing System</p><p>2 Type of Wet Scrubber` Required/Provided 2 Scrubbing Liquid Dosing () (P/S) System to Comply with Packed bed scrubber WIMES 8.02 (Y/N) (P) Venturi scrubber 6.2.5 Scrubbing Liquid Blowdown System (Where Spray tower Provided) Other (specify) 3 Type of Scrubbing Liquid (S) 2 Excess/Waste Scrubbing Liquid Characteristics (e.g. pH and Cl content, 3 Target Operating Parameters (S) etc.) (S)</p><p>5 Ancillary Components Required/Provided 3 Excess/Waste Scrubbing Liquid to () (P/S) Discharge to: (P/S) a Pre-filters b Mist eliminator 5 Types of Pre-Filters Required/Provided () (P/S) Dust filters Grease filters Other (specify) 6 Redundancy Requirements (P)</p><p>7 Bypass Ductwork Required (Y/N) (P) 9 Number and Configuration of Wet Scrubbers and Ancillary Components/Systems Provided (S) </p><p>6.2.2 Wet Scrubber(s)</p><p>6.2.2.1 Housing(s)</p><p>1 Material (S)</p><p>1 Type of Construction (S)</p><p>6.2.2.2 Treatment Stage(s) (Packed Bed Scrubbers)</p><p>1 Number of Treatment Stages (S) 3 Configuration of Inert Media Bed(s) (S)</p><p>4 Type and Composition of Inert Media (S) 6.3 Dry Media Installations (e.g. Dry Scrubbers and GAC Units) (Where Required/Provided)</p><p>1 Process Reference (See Section 6.1.1) (P/S)</p><p>6.3.1 General 6.3.2.3 Treatment Stage(s)</p><p>2 Ancillary Components/ Systems 1 Number of Treatment Required/Provided () (P/S) Stages (S) a Pre-filters 3 Configuration of Media Bed(s) (S) b ‘ In situ’ media re- generation system (GAC 5 Type and Composition of Media (S) Units) c Inlet heater 7 Media Sampling Facility 2 Types of Pre-Filters Required/Provided Required/Provided (Y/N) () (P/S) (P/S) Dust Filters 8 Media Analysis Service Grease filters Required (Y/N) (P) De-misters Other (specify) 6.3.3 In Situ Media Re-Generation System (For GAC Units) (Where Required/Provided) 3 Redundancy Requirements (P) 2 Details (S) 4 Bypass Ductwork Type of Re-generating Liquid Required (Y/N) (P)</p><p>5 Number and Configuration of Treatment -1 Units and Ancillary Components/Systems Cycle Frequency (hrs ) Provided (S) Cycle Duration (hrs) Volume of Liquid Waste Produced During Each 6.3.2 Treatment Unit(s) Cycle (l) 3 Method of Disposal and pH of Liquid 6.3.2.1 General Waste (S)</p><p>1 Condensate to Discharge to: (P/S) 4 Excess/Waste Regenerating Liquid to Discharge to: (P/S)</p><p>6.3.2.2 Housing(s) 6.3.5 Media Disposal 1 Material (S)</p><p>1 Type of Construction (S) 1 Method of Removal, Disposal and Waste Classification of Spent Media (S)</p><p>2 Time Required to Replace Spent Media (S) 6.4 Catalytic Iron Filter (CIF) Installations (Where Required/Provided)</p><p>1 Process Reference (See Section 6.1.1) (P/S)</p><p>6.4.1 General 6.4.3 Media Disposal</p><p>2 Ancillary Components/ Systems Required/Provided () (P/S) a Pre-filters b Inlet air humidifier c Media irrigation system 2 Types of Pre-Filters Required/Provided () (P/S) Dust Filters De-misters Other (specify) 3 Redundancy Requirements (P)</p><p>4 Bypass Ductwork Required (Y/N) (P) 6 Number and Configuration of CIFs and Ancillary Components/Systems Provided (S) </p><p>6.4.2 CIF(s)</p><p>6.4.2.1 General</p><p>1 Excess Moisture to Discharge to: (P/S)</p><p>6.4.2.2 Housing(s)</p><p>1 Material (S)</p><p>1 Type of Construction (S)</p><p>6.4.2.3 Treatment Stage(s)</p><p>1 Number of Treatment Stages (S) 3 Configuration of Media Bed(s) (S)</p><p>4 Type and Composition of Media (S) 1 Method of Removal, Disposal and Waste Classification of Spent Media (S)</p><p>2 Time Required to Replace Spent Media (S) 6.5 Biological Treatment Processes (Where Required/Provided)</p><p>6.5.1 Bio-Filter Installations (Where Required/Provided)</p><p>1 Process Reference (See Section 6.1.1) (P/S)</p><p>6.5.1.1 General b Specific Surface Area (m2/kg) 2 Target Operating pH (S) 3 Type of Media Irrigation System Provided c Pressure Drop Across Media (Pa/m) () (S) a Re-circulating b Single pass 6.5.1.3 Media Irrigation System 4 Ancillary Components Required/Provided () (P/S) 2a Strainer Mesh Size a Pre-filters (mm) (S) b Covers (for open- 3 Irrigating Liquid Requirements (S) topped, up-flow bio- Type () filters) Final effluent 4 Types of Pre-Filters Required/Provided Potable water () (P/S) Quality Dust Filters De-misters Pressure and Flow Rate Other (specify) 4 Redundancy Requirements (P) Cycle Frequency (hrs-1) Cycle Duration (hrs) 6 Bypass Ductwork Required (Y/N) (P) 5 Excess/Waste Irrigating Liquid to Discharge to: (P/S) 7 Number and Configuration of Bio-Filters and Ancillary Components/Systems Provided (S) 6.5.1.4 Irrigating Liquid Blowdown System (Where Required For Re-circulating Media Irrigation Systems) 6.5.1.2 Bio-Filter(s)</p><p>Housing(s) and Base Slab(s) 4 Excess/Waste Irrigating Liquid Characteristics (S) 1 Materials (S) 5 Excess/Waste Irrigating Liquid to Discharge to: (P/S) 1 Types of Construction (S)</p><p>6.5.1.5 Media Disposal Treatment Stage(s) 1 Method of Removal, Disposal and Waste 1 Number of Treatment Classification of Spent Media (S) Stages Provided (S) 3 Configuration of Inert Media Bed(s) (S) 2 Time Required to Replace Spent Media 4 Inert Media Information/Characteristic (S) (S) a Type and Composition 6.5 Biological Treatment Processes (If Required/Provided) (Continued)</p><p>6.5.2 Bio-Scrubber Installations (Where Required/Provided)</p><p>1 Process Reference (See Section 6.1.1) (P/S)</p><p>6.5.2.1 General Discharge to: (P/S)</p><p>2 Scrubbing Liquid Requirements (S) Type () 6.5.2.6 Media Disposal Final effluent Potable water 1 Method of Removal, Disposal and Waste Quality Classification of Spent Media (S)</p><p>Pressure and Flow Rate 2 Time Required to Replace Spent Media (S) 3 Target Operating pH (S) 5 Ancillary Components/ Systems Required/Provided () (P/S) a Mist eliminator b Scrubbing liquid conditioning system 4 Redundancy Requirements (P)</p><p>7 Bypass Ductwork Required (Y/N) (P) 8 Minimum pH Value (S) 9 Number and Configuration of Bio- Scrubbers and Ancillary Components/Systems Provided (S) </p><p>6.5.2.2 Bio-Scrubber(s)</p><p>Housing(s)</p><p>1 Material (S)</p><p>1 Type of Construction (S)</p><p>Treatment Stage(s)</p><p>1 Number of Treatment Stages (S) 3 Configuration of Inert Media Bed(s) (S)</p><p>4 Inert Media Information/Characteristic (S) a Type and Composition</p><p> b Specific Surface Area (m2/kg)</p><p> c Pressure Drop Across Media (Pa/m)</p><p>6.5.2.5 Scrubbing Liquid Blowdown System</p><p>4 Excess/Waste Scrubbing Liquid to 7.0 TEST SPECFICATION 7.4.4.4 Further Tests (Where Required)</p><p>7.1 General 1 Reference for Purchaser’s Particular Specification (P) 1b Witness FAT Required (Y/N) 7.4.4.5 Reporting of Results 7.4 Site Acceptance Testing (SAT) 1 Results to be Made 7.4.4 Process Performance Testing Available Within (Days) (P) 7.4.4.1 General 7.4.5 Cover Leakage Testing (Where Required) 1 Types and Number of Tests Required () (Specify Number Required e.g. (4)) (P) 1 Cover Leakage Testing Odour concentration Required (Y/N) (P) H2S 1 Reference for Purchaser’s Particular NH3 Specification (P)</p><p>7.4.6 Ductwork Leakage Testing (Where Required) 3 Witness Testing Required (Y/N) (P) 1 Ductwork Leakage 4 Air Flow Rate for 3 Testing Required (Y/N) Testing (m /hr) (P/S) (P) 5 Testing to be Performed by: (P)</p><p>7.4.4.2 Odour Concentration (Where Required)</p><p>1 Sampling Details (P) Sampling duration Sampling interval 2 Number of ‘Matched Pairs’ Required (P) For analysis As back-ups 5 Maximum Allowable Mean Odour Conc. (P)</p><p>7.4.4.3 Hydrogen Sulphide Concentration (Where Required)</p><p>1 Measurement Details (P) Sampling/data logging duration Number of samples/data logging sessions reqd. Interval between sampling/data logging sessions 4 Time interval (P)</p><p>4 Maximum Allowable H2S Content (P) 2. APPENDIX C2 – DRIVE SYSTEM DATA SHEET</p><p>(TO BE COMPLETED FOR EACH DRIVE SYSTEM )</p><p>Drive No.: Drive No.:</p><p>1 Driven Equipment (P/S) 1 Driven Equipment (P/S)</p><p>2 Type of Drive (Fixed or Variable) (P/S) 2 Type of Drive (Fixed or Variable) (P/S)</p><p>3 Method of Power Transmission from Drive 3 Method of Power Transmission from Drive to Driven Equipment () (S) to Driven Equipment () (S) Close coupled Close coupled Chain Chain Belt Belt Other (specify) Other (specify) 4 Method of Mechanical Overload 4 Method of Mechanical Overload Protection for Drive () (P/S) Protection for Drive () (P/S) Current monitoring Current monitoring Torque limiting coupling Torque limiting coupling Other (specify) Other (specify) 6 Gearbox Specification (S) 6 Gearbox Specification (S) Type and Number of Stages Type and Number of Stages</p><p>Manufacturer Manufacturer Service factor Service factor Final drive ratio Final drive ratio</p><p>Drive No.: Drive No.:</p><p>1 Driven Equipment (P/S)</p><p>2 Type of Drive (Fixed or Variable) (P/S)</p><p>3 Method of Power Transmission from Drive to Driven Equipment () (S) Close coupled Chain Belt Other (specify) 4 Method of Mechanical Overload Protection for Drive () (P/S) Current monitoring Torque limiting coupling Other (specify) 6 Gearbox Specification (S) Type and Number of Stages</p><p>Manufacturer Service factor Final drive ratio 1 Driven Equipment (P/S)</p><p>2 Type of Drive (Fixed or Variable) (P/S)</p><p>3 Method of Power Transmission from Drive to Driven Equipment () (S) Close coupled Chain Belt Other (specify) 4 Method of Mechanical Overload Protection for Drive () (P/S) Current monitoring Torque limiting coupling Other (specify) 6 Gearbox Specification (S) Type and Number of Stages</p><p>Manufacturer Service factor Final drive ratio 3. APPENDIX D - SUPPLIER’S SUPPLEMENTARY DATA SHEET INFORMATION</p><p>Clause Supplementary Information 4. APPENDIX G5 – GRP COVER DATA SHEETS PROJECT TITLE (P) DOCUMENT REFERENCE (P) PROJECT NUMBER (P) REVISION (P) PROJECT LOCATION (P) DATE (P) GRP COVER REFERENCE DRAWINGS MANUFACTUER (P/S) INCLUDED (Y/N) (P)</p><p>* - Indicates Purchaser’s default requirement G6.1.7 Miscellaneous</p><p>G5.0 PERFORMANCE SPECIFICATION 1 Cover Sections to be Uniquely Marked (Y/N) G5.1 General (P)</p><p>1 Service Life (20 years*) G6.2 Mechanical Properties (P) G6.2.1 Assessment of Loads G5.2 Leak Tightness 4 Design Loads (P) G5.2.2 Covers Over Tanks, Wet Wells, Chambers Process Pressure (Pa) (P)</p><p>1 % of Odorous Air Drawn Through Designated Air Wind Loads (P) Intakes (60 %*) (P) Site Location Height of covers above G5.2.3 Covers Over ‘Difficult to Seal’ Installations ground level (m) Access Loads (P) 1 % of Odorous Air Drawn Through Designated Air Intakes (P) Plant and Equipment Loads (P)</p><p>G6.0 DESIGN SPECIFICATION G6.2.4 Deformation G6.1 General 2 Minimum Fall for Free G6.1.1 Design Information to be Provided Drainage (1 in 50*) (P)</p><p>1b Structural Calculations G6.4 Appearance (i) Required (Y/N) (P) 1b Sample Laminate Test 2 Cover Colour (P) (ii) Report Required (Y/N) (P)</p><p>G6.1.2 Weights and Lifting Arrangements G6.6 Access Requirements</p><p>1 Heaviest maintenance lift G6.6.1 General (S) 1 Heaviest erection lift (S) 1 Access Requirements (P)</p><p>G6.1.5 O & M Manuals 2 Further Walkway Requirements (P)</p><p>1 Reference for Purchaser’s Particular 3 Further Access Requirements (P) Specification (P) G6.6.2 Access Hatches and Hatch Covers</p><p>3 Hinge Type (P/S)</p><p>4 Requirements for Stays (P)</p><p>5 Hatch-Cover Locking Requirements (P)</p><p>G6.6.3 Safety Grids 2 Requirements for Safety Grids (P)</p><p>3 Safety Grids to Require Tool for Removal (Y*/N) (P) 5. APPENDIX G6 - SUPPLIER’S SUPPLEMENTARY DATA SHEET INFORMATION</p><p>Clause Supplementary Information</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages25 Page
-
File Size-