Bottom of Form s20

Bottom of Form s20

<p>Post Award SAP (<$100K)(Excluding FAR 13.5) Review Form Activity/Site: FISC Norfolk Detachment Phila FY:2007 QTR:04 Reviewer Name: Last Name, First Name Negotiator ID: r60fml01 Reviewer Phone Nbr: 215-697-XXX PIIN Number: N00189-07-P-ZXXX Award Amount: $XX,XXX.xx</p><p>* See Special Interest (SI) item definitions in the NAVSUP Enterprise QA Guide. The last letter of the SI metric code matches the labeling system used in the SI definitions in the guide.</p><p> This form can be saved while work is in progress by selecting the 'Save' link at the top of this page  Metric Types can be identified as follows: Overall Metrics are Yellow, Metric Subquestions are White, and Special Interest Metrics are Grey  To Complete Review, Overall SAP and Special Interest Metrics must be addressed (subquestions do not require an entry)  In some instances, a Metric (SAP or Special Interest) may not apply to the PIIN. It is strongly recommended that these questions are answered with 'N/A'. and not left blank.  Negative Responses require an entry in the 'Comments' block </p><p> Can't Complete this form? Go directly to the Can't Do section </p><p>Select one of the following: Supply Service </p><p>SP-1 Pre-Award Planning/ Screening of Mandatory Sources PURCHASE REQUESTS (PR)/REQUEST FOR CONTRACTUAL PROCUREMENT (RCP) Was the PR or RCP approved IAW internal instruction/policy (i.e. COMFISCINST 7112.1 (Series))? Yes No N/A SP-1A Comments Should alw ays be YES, unless you cannot find the PR/RCP</p><p>SI-A Was an Economy Act D&F prepared in accordance with NAVSUPINST 4200.90 (Series) and FAR 17.503?* Yes No N/A Comments If Not Required, Use NA</p><p>Was Government Furnished Property (GFP) Identified and Documented IAW FAR, DFARS, NMCARS Part 45?* Yes No N/A </p><p>SI-D1 Comments If Not Required, Use NA</p><p>Was a NMCI Waiver Form submitted (for IT over $25K) IAW NAVSUP letter 210/5088 dated 24 Mar 05? Yes No N/A SP-1B Comments If Not Required, Use NA</p><p>For equipment, was a Lease vs. Purchase Analysis completed IAW FAR 7.401?* Yes No N/A </p><p>SI-B Comments If Not Required, Use NA</p><p>PRESOLICITATION Was acquisition planning (i.e. Pre-Solicitation Strategy) completed IAW FAR 7.1, NAVSUPINST 4200.85 (Series) and local instructions? Yes No N/A SP-1C Comments </p><p>Was documentation prepared for Items Requiring Special Approvals IAW the "Don't Buy List" (NAVSUPINST 4200.85 (Series))? Yes No N/A SP-1D Comments </p><p>Was Technical Screening for Priorities for Use of Government Supply Sources completed IAW FAR 8.002? Yes No N/A SP-1E Comments </p><p>SP-1F If FPI was the mandatory source and was not used, was a waiver completed IAW FAR 8.604 & 8.605? Yes No N/A Comments </p><p>Was the market research thoroughly documented IAW FAR and DFARS Part 10 and NAVSUPINST 4200.85 (Series)? (i.e. Was using existing contracts (GSA/FSS contracts) considered before determining the course Yes No N/A SP-1G of action?) Comments </p><p>Was a commerciality determination made IAW FAR 12.101? Yes No N/A SP-1H Comments </p><p>Were evaluation factors utilized IAW FAR 13.106-1(a)(2)? Yes No N/A SP-1I Comments </p><p>OVERALL METRIC RATING </p><p>SP-1 Pre-Award Planning/ Screening of Mandatory Sources Yes No N/A Comments are mandatory if response to question is 'No' </p><p>SP-2 Adequate Competition</p><p>Was the Sole Source Statement prepared and approved IAW FAR 13.106? Yes No N/A SP-2A Comments </p><p>OVERALL METRIC RATING SP-2 Adequate Competition Yes No N/A Comments are mandatory if response to question is 'No' </p><p>SP-3 Utilization of Small Business Resources</p><p>Was the Small Business Coordination Form (DD Form 2579) properly completed IAW DFARS 219.201(d)(10) and the procurement executed in Yes No N/A SP-3A accordance with it? Comments </p><p>If the procurement was not issued as a Small Business Set-Aside (SBSA), was the file documented with the reason why SBSA was not used IAW Yes No N/A SP-3B FAR 19.502-2? Comments </p><p>OVERALL METRIC RATING </p><p>SP-3 Utilization of Small Business Resources Yes No N/A Comments are mandatory if response to question is 'No' </p><p>SP-4 Pre Award Actions SYNOPSIS Is there a correctly completed solicitation synopsis IAW FAR 5.2, FAR 12.603, DFARS 205.2 and NMCARS 5205.202? Yes No N/A SP-4A Comments </p><p>Was Small Business Form approved before the synopsis was issued? (Over $10K) Yes No N/A SP-4B Comments </p><p>Was the use of FAR 12 or FAR 13.5 procedures cited in the synopsis? Yes No N/A SP-4C Comments </p><p>SOLICITATION Was Office of Counsel review obtained & documented IAW internal instructions and procedures? Yes No N/A SP-4D Comments </p><p>Was solicitation posted to NECO IAW NMCARS 5213.106-1(d)? Yes No N/A SP-4E Comments </p><p>Were the provisions appropriate for type of order identified? Yes No N/A SP-4F Comments </p><p>SI-F Were Clauses for Domestic and Foreign Restriction including the Buy American Act identified?* Yes No N/A Comments </p><p>NEGOTIATION </p><p>Were offers/quotes evaluated IAW FAR 13.106-2? Yes No N/A SP-4G Comments </p><p>Was an adequate price reasonableness determination made IAW FAR 13.106-3? (i.e. Significant price variances among offers explained, Yes No N/A SP-4H comparison to catalog pricing adequately justified, etc.) Comments </p><p>If the price was determined fair and reasonable based on a comparison to price history, was it documented how the historical price was Yes No N/A SP-4I determined fair and reasonable? Comments </p><p>Was the contractor determined responsible IAW FAR 9.1? Yes No N/A SP-4J Comments </p><p>OVERALL METRIC RATING </p><p>SP-4 Pre Award Actions Yes No N/A Comments are mandatory if response to question is 'No' </p><p>SP-6 Complete Audit Trail CONTRACT AWARD Was Responsibility/Liability for GFP clearly defined IAW FAR 45.103?* Yes No N/A </p><p>SI-D2 Comments </p><p>Did the Office of Counsel review the award document IAW internal policy? Yes No N/A SP-6A Comments </p><p>Was the award made in the appropriate procurement system? (i.e. SPS, ITIMP, etc.) Yes No N/A SP-6B Comments </p><p>POST AWARD ACTIONS Was the DD Form 350/Contract Action Report (CAR) completed timely and signed IAW PGI 204.670-3? Yes No N/A SP-6C Comments </p><p>Was the DD Form 350/CAR coded correctly? Yes No N/A SP-6D Comments </p><p>Was the award properly synopsized IAW FAR 5.301, DFARS 205.3 and NMCARS 5205.3? Yes No N/A SP-6E Comments </p><p>SP-6F Was the contract file adequately maintained IAW FAR 4.8 and DFARS 204.8? Yes No N/A Comments </p><p>OVERALL METRIC RATING </p><p>SP-6 Complete Audit Trail Yes No N/A Comments are mandatory if response to question is 'No' </p><p>Additional Comments</p><p>Maximum 1000 characters allowed </p><p>If this Review can not be completed, select reason from dropdown list and then select the 'Can't Do' button Reason is mandatory if job can not be reviewed Please make a selection Can't Do</p><p>Complete Review</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us