Building D Is a 4 Story Office Building Located at 55 Corporate Drive in Bridgewater NJ

Building D Is a 4 Story Office Building Located at 55 Corporate Drive in Bridgewater NJ

<p> Building A, 2 nd Floor Renovation Project</p><p>Building A is a 5 story office building located at 55 Corporate Drive in Bridgewater, NJ. The following briefly describes the necessary alterations required as part of the A-2 renovation. </p><p>Please reference the following drawings for complete scope of work: AZ Corporation drawings – Sanofi 2nd Floor Office Improvements Progress Set Dated January 3rd, 2014 inclusive of: A-001, A-002, A-100D, A-110, A-112, A-113, A-114, A- 600, E-110.</p><p>The project focuses on the vast majority of the second floor of Building A. The innovation hub is excluded from the project scope. </p><p>Scope of Work:  Demo carpet, furnish and install new carpet tile in the open area, offices A-2507 – A2511, A-2513 – A-2517, A2303 – A2306, new Huddle Rooms A-201 – A-205, three conference rooms (A-2292, A-2552, A-2553).  Demo ten offices: A-2530 – A-2534, A-2536 – A-2540.  Furnish and install 5 new Huddle Rooms: A201 – A205 inclusive of light relocation.  Paint offices A-2507 – A2511, A-2513 – A-2517, A2303 – A2306, new Huddle Rooms A-201 – A-205, three conference rooms (A-2292, A-2552, A-2553), perimeter of work area, hallways, common areas, and new partition walls.  Provide a HVAC allowance of $25,000.  Provide a Fire Protection allowance of $10,000.  Electric (454 data/ voice lines, 73 120v circuits, 24 new poke thrus, 27 wall mount power/ data, data/ phone/ power for six copiers, two new 150 amp subpanels, four new 48 patch panels. Labeling to be performed per Sanofi standards.  Provide temporary plastic barriers with walk off mats at all access points into the construction area.  Construction signage to be installed at all access points into the construction area.</p><p>Exclusions:  All knockdown and reinstallation of workstations, lockers, and furniture by Sanofi.</p><p>This project shall be bid as a Single Phase, Lump Sum project. All permit fees shall be included in your bid. Note, all work to be completed off hours. Earliest start is 6p weekdays. A work plan must be submitted with your proposal including a project schedule. Assume work to commence in June. This work plan must be approved by Sanofi prior to project start. All contractors must abide by the attached US Sanofi Contractor Safety Program. </p><p>Alternates:  Please provide an alternate deduction to perform all work during normal working hours. Note, demolition of offices and poke thrus with associated power and network cabling to occur after 6p.  Please provide an alternate deduction to complete this project with power poles in lieu of poke thrus. Contractor is responsible to furnish and install approved power pole.  Please provide an alternate to complete project in Three Phases as indicated on the drawings. Please consider and describe proposed egress means during each phase. </p><p>Unit Pricing – please provide unit pricing for the following:  Additional poke thru  Additional power poles  Additional infrastructure to support one copier  Additional data drop  Additional duplex receptacle  Carpeting per square foot  Ceiling tiles  Light fixtures </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us