60 MOORGATE, EC2 HAS BEEN COMPREHENSIVELY REDEVELOPED BEHIND A RETAINED FAÇADE AND WILL OFFER APPROX. 28,000 SQ FT (2,601 SQ M) OF NEW OFFICE AND RETAIL SPACE. Situated in a prominent position on the junction of London Wall and Moorgate, 60 Moorgate provides a prestigious business address and close access to the capital’s transport network with the new Moorgate entrance of the Elizabeth line just 150 yards away. This new office building will provide typical floors of just under 4,000 sq ft of column free Grade A workspace. The scheme has been highly specified with building amenities modern occupiers seek, with a roof terrace on the top floor and bike storage and showers in the basement. This exciting new City development is scheduled for completion in Q4 2019. PAGE ONE THE BUILDING – VRF air conditioning – Full access raised floors – 2 x 13 person passenger lifts – Typical floor to ceiling heights of 2.75m – Cycle storage – Showers, lockers & changing facilities – BREEAM – Excellent – Wiredscore Certification – Gold – Column-free floor plates PAGE TWO LOCATION SITUATED IN THE HEART OF THE CITY, SIXTY MOORGATE HAS FIRST CLASS AMENITIES ON ITS DOORSTEP. PAGE THREE LOCATION BANKS PROFESSIONAL SERVICES AMENITIES 1 Bank of China 2 Bank of England 15 Alvarez & Marsal E T 3 Deutsche Bank 16 Baker Botts BARBICAN A G 4 ING 17 Fried Frank 2 2 5 Schroders 18 Latham & Watkins 1 6 Standard Chartered 19 Smith & Williamson MOOR 15 11 3 2 20 Stephenson FINANCIAL Harwood SERVICES 21 White & Case BROADGATE 20 14 CIRCLE MOORGATE 7 BlackRock 8 Citadel FINSBURY 11 9 CLSA 9 CIRCUS LIVERPOOL 10 Legal & General 5 8 14 6 STREET 11 Pictet L O N D O N W A L L 2 12 Portigon AG 13 Prudential 16 10 Regulation Authority L 14 Rathbones ON RESTAURANTS BARS / CAFÉS D O N 5 1 W 3 A L L 6 1 1 Lombard Street 1 Chipotle 2 Angler 2 Coco di Mama TE 4 A 3 Brasserie Blanc 3 Davy’s 15 5 3 4 Coya 4 El Vino 12 13 ET 5 Enoteca da Luca 5 Euphorium Bakery OORG GUILDHALL 13 1 RE 6 Goodman City 6 Fox’s Wine Bar 19 M 18 7 7 Harry’s Bar 7 Notes 15 9 7 D S T 8 Hawksmoor 8 Panino Giusto 8 14 OA R B E Guildhall 9 Ravello 9 4 T A 9 K10 10 Royal Exchange G R D E S H G A M 13 OL S 10 Kitty Hawk Grind S P T R E 1 16 E T O 17 4 11 Le Relais de Venise 11 Taylor St Baristas H S 16 I 12 M 12 The Anthologist 12 B P 11 1 L O Y R T R 10 13 Mint Leaf 13 The Gable 7 H B U 5 I 14 Natural Kitchen 14 The Globe N 21 6 C 4 15 Off the Wall 15 The Tokenhouse E T HE BANK OF 12 E T 3 S T R E ’ ENGLAND E 16 Pizza Express 16 Vertigo 42 S S T E E DL A D N R E 17 Sauterelle T H 18 R 18 The Mercer RETAIL C E HEAP E T S 2 10 3 I D E 3 17 THE ROYAL HEALTH / LEISURE 1 Barbican P OU LTRY EXCHANGE 8 HA L L S TREE T 2 Broadgate Circle LE A DE N CO R NHIL L 6 1 City Golf and 3 The Royal Exchange BANK Health Clubs ET RE 2 IA S T 2 Eight Members HOTELS O R C T 1 4 Club VI E N LEADENHALL 3 Fitness First 1 Apex London Q UE MARKET LOCAL 4 Gym Box 2 South Place Hotel 5 Pure Gym 3 The Ned OCCUPIERS 6 Matt Roberts City 4 Threadneedles PAGE FOUR LOCATION PAGE FIVE CONNECTIONS KINGS CROSS ST PANCRAS 6 MINS INTERNATIONAL OLD STREET REET Northern Line D S T 9 MINS OL M OORGAT SHOREDITCH HIGH STREET E COMM ERCIAL BARBICAN LIVERPOOL STREET S T BOND STREET CANARY WHARF R HEATHROW CITY AIRPORT MOORGATE E LONDON WALL E ET 14 MINS 16 MINS AIRPORT 27 MINS Central Line Northern Line 35 MINS G R Jubilee Line E SHAM S T R EE SHOPSGAT T I B C H EA P S ID ALDGATE E EAST ST PAUL’S ALDGATE T BANK E E R S T C AN H N O R C N F E H U LONDON BRIDGE ST N C RE E T 3 MINS MANSION HOUSE FENCHURCH Northern Line CANNON STREET TOWER GATWICK AIRPORT S STREET R MONUMENT GATEWAY A 53 MINS I R TOWER HILL IDGE R ACKF N B L B DO N IDGE R LO B RI V LONDON UNDERGROUND E R T H A M INTERNATIONAL E S R E W IDGE TO R LONDON BRIDGE B STRATFORD 6 MINS CONNECTIVITY FOR MOORGATE PADDINGTON IS SET TO BE ENHANCED 10 MINS CONSIDERABLY FOLLOWING HEATHROW CANARY WHARF AIRPORT 8 MINS THE OPENING OF 35 MINS BOND STREET THE CROSSRAIL IN 7 MINS ELIZABETH Q4 2019. LINE THE ELIZABETH LINE (FROM Q4 2019) PAGE SIX THE FLOOR PAGE SEVEN SCHEDULE OF OFFICE AREAS SQ M SQ FT SEVENTH FLOOR* 121 1,302 SIXTH FLOOR* 318 3,423 FIFTH FLOOR 354 3,810 FOURTH FLOOR 357 3,843 THIRD FLOOR 356 3,832 SECOND FLOOR 354 3,810 FIRST FLOOR 351 3,778 GROUND FLOOR RECEPTION 70 754 LONDON WALL MOORGATE TOTAL 2,281 24,552 * Sixth & Seventh floors are to be let together PAGE EIGHT FLOOR PLANS GROUND FIRST BIKE STORE EMERGENCY DISABLED WC AND REFUSE ACCESS ESCAPE WC DISABLED WC WC LIFT LIFT LIFTLIFT WC OFFICE ENTRANCE LONDON WALL RETAIL UNIT AND LONDON WALL RECEPTION OFFICE ENTRANCE MOORGATE MOORGATE SECOND THIRD DISABLED WC DISABLED WC WC WC WC WC LIFTLIFT LIFTLIFT WC WC LONDON WALL LONDON WALL MOORGATE MOORGATE N Plans not to scale. For identification purposes only. PAGE NINE FLOOR PLANS FOURTH FIFTH DISABLED WC DISABLED WC WC WC WC WC LIFTLIFT LIFTLIFT WC WC LONDON WALL LONDON WALL MOORGATE MOORGATE SIXTH SEVENTH DISABLED WC RETAIL TENANT WC PLANT AREA BALCONY WC LIFTLIFT LIFTLIFT WC LANDLORD PLANT LONDON WALL LONDON WALL MOORGATE MOORGATE N Plans not to scale. For identification purposes only. PAGE TEN SPECIFICATION 1.0 GENERAL 2.0 STRUCTURAL WORKS Perimeter and raked ceiling at sixth and seventh floors: Design parameters 1.1 2.1 Design Generally emulsion painted suspended plasterboard and skim ceiling Winter Temperature: The premises will be completed to a B1(a) Use, Category A The structural engineering design is in accordance with on metal frame. Outside -3.5°C db fit-out standard specification by the landlord, with provision all relevant British Standards and Building Regulation Office area: Powder coated white metal system lay-in Office 20°C ± 2°C for future connection to all statutory authority incoming requirements. perforated ceiling tile 600x600 module. Toilet Areas 20°C minimum services (excluding gas), via capped off services. Ceiling has been designed to allow for installation of (Winter only no summer control) All the landlords works to Category A fit-out have been 2.2 Floor Construction partitions by incoming tenant. Summer Temperature: carried out with reference to relevant current British The columns are all located along the edge of the building Standards, Planning approvals, Building Regulation approvals. while the core is located at the back. The maximum Outside 32.5°C db 3.4 Doors span of the floor beams will be approximately 12 metres. 21.5°C wb Doors to the stair lobby, stair core is a minimum clear 1.2 Therefore the floor plates are without internal columns Office 24°C ± 2°C opening width of 820mm and 2100mm high. Opening All fittings, finishes and services associated with the tenants to maximise the nettable area and to provide the most swing in the direction of escape from ground to sixth floor. Windows and rooflights – new aluminium powder coated fit-out are to be provided by the tenant and subject to flexible solution. Door between office and lobby to have one hour fire frames with double glazed fixed panels. Openable for landlord’s approval and current standards. Raised access floor panels sit on pedestals above a rating, with door closer. maintenance purposes only. No tenant works are to be carried out until all necessary 140mm reinforced concrete topped metal deck to meet Doors onto stairs from each floor are access controlled. Second floor windows head is above ceiling level. consents and permits are in place (including planning the fire resistance requirements. This is on 450mm deep Seventh floor office has a balcony to rear with concrete and building control). All future tenant fit-out design and castellated beams spaced at approximately 3 meters 3.5 Staircases pavers finish. construction works are subject to separate consents to be which achieves the long spans. Main core stair – ground to seventh – folded steel stair applied for by the tenant’s design team. with carpet finish. Glazed balustrade with stainless steel 4.0 SERVICES INSTALLATION 2.3 Floor Loading handrail. 1.3 Access and Egress: The office is designed to 2.5KN/m2 plus 1 KN/m2 (partition). 4.1 Design Criteria Access to all floors is compliant with current Document M Basement to ground – RC concrete stairs with contrast The following load allowances have been made within the The foyer, lobby, reception, access and circulation areas Building Regulations. nosings. (Slip resistance as per building regulations) a tyre design of the central plant and building infrastructure systems: are designed to 5.0KN/m2 channel along one side is provided for bicycles.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages14 Page
-
File Size-