<p> ADEPT CONTRACTORS PTY LTD</p><p>Lot 8 Long Pocket Road</p><p>Moranbah QLD 4744</p><p>Phone: (07) 4941-5100 </p><p>Phone: (A/H) 0417 797 179 or 0408 063 441</p><p>Email: [email protected]</p><p>PROFILE</p><p>Adept Contractors Pty Ltd is a family business operated by husband and wife team Peter & Helen Allardyce.</p><p>Peter has been in the construction business over 50 years, completing all his trade certificates to become a registered builder. A few years in house building he wanted something more challenging, venturing into civil works which included bridge building, concrete silos, sewerage treatment plants, culverts, etc. This took the family to various locations throughout Australia.</p><p>Finally locating to Mackay work began in the mining industry. Adept Contractors evolved and has been locally based in Moranbah for the past 17 years, providing concrete works, maintenance, earthworks, demolition, steel fabrication, machinery hire and transport services to the coal mining sector, local council and private contractors. </p><p>With growth came the relocation to our new premises at Long Pocket Rd, Moranbah from which all our projects are run. This is incorporated with a well-equipped camp to accommodate our employees and their families. Adept are focused on continually improving our business and our people. We remain committed to delivering high quality, incident free services, and an advanced level of workplace safety and maintain positive relations with our clients, subcontractors and suppliers. </p><p>Peter and Helen Allardyce Directors Adept Contractors Pty Ltd.</p><p>KEY PERSONNEL</p><p>Directors: Peter & Helen Allardyce Experience: 45 years Background: Registered and General Builder.</p><p>Project Coordinator: Michael Lawton Experience: 12 years Background: Administration, Supervisor, Concreter, Formsetter, Steelfixer, Operator.</p><p>Workshop Manager: Jason Paterson Experience: 20 years Background: HR Driver, Mechanic and Operator</p><p>Fleet Manager: Ross Cook Experience: 35 years Background: HR Driver</p><p>Supervisor: Daniel Helsham Experience: 8 years Background: Concreter, Formsetter, Steelfixer and Operator Operator: John Reid Experience: 12 years Background: MR Driver, Excavator, Bobcat and Roller Operator. Concrete Trade Assistant</p><p>Operator: Brian Garvey Experience: 35 years Background: HR Driver, Brick Layer and Concreter</p><p>Operator: Neil Burrows Experience: 20 years Background: Trade Assistant Mechanic, HR Driver, Excavator, Loader, Grader, Backhoe & Bobcat Operator</p><p>Concreter: Mitchell Maluga Experience: 6 years Background: Concreter, Formsetter, Steelfixer</p><p>RESOURCES</p><p>Adept Contractors owns a diverse range of equipment for the use in earthmoving and construction. All our operators are experienced and have been trained, assessed and deemed competent to operate all our equipment.</p><p>The company is supported with its own service department who regularly service, monitor and document all plant as per manufacturer’s specifications. </p><p>In addition to the below plant Adept Contractors also owns light vehicles and trucks fitted with compressors, generators and hand tools.</p><p>Adept Plant:</p><p>1. JCB 4.5t Excavator 2. CASE 13t Excavator (2) 3. CASE 20t Excavator (2) 4. JCB 24t Excavator 5. CASE 24t Excavator 6. JCB 30t Excavator 7. JCB 4 CX Backhoe 8. CASE Backhoe (2) 9. CAT 140H Grader 10. CAT 966D Loader 11. CAT CS433E Roller 12. CASE 465 Bobcat 13. CAT Forklift (2) 14. Western Star Prime Mover 15. Hino Step Deck 16. Hino Tilt Tray 17. 10m Hino Tippers (9) 18. Hino 8000lt Water Truck 19. Hino 12000lt Water Truck 20. Hino Service Truck</p><p>Equipment Attachment’s:</p><p>1. Rock Breakers 2. Post Hole Borer’s (200mm, 300mm, 450mm, 600mm, 900mm & 1200mm) (Max Depth 18m) 3. Long Arm (Additional 3m for 24t Excavator) 4. Hydraulic Grab 5. Sieve Bucket</p><p>All Equipment is Mine Compliant. RESOURCES</p><p>RESOURCES</p><p>RESOURCES</p><p>RESOURCES MULTI-PLATE CULVERT INSTALLATION</p><p>Client Contact details BMA Coal Pty Ltd</p><p>(COS GORDON)</p><p>Location EUREKA CREEK</p><p>BROADMEADOWS MINE</p><p>Contract Installation of multi-plate culvert and apron slab in Eureka creek</p><p>Description of Project Excavation work, Assemble multi-plate culvert, place, prop & backfill, construct concrete apron slabs </p><p>Machinery 20t Excavator, Grader, Backhoe, EWP, Franna, All Terrain Crane. Type of Contract Lump Sum</p><p>Contract Value $450,000.00</p><p>Start Date 15/03/2004</p><p>Finish Date 28/05/2004 MULTI-PLATE CULVERT INSTALLATION CONCRETE WORK AT 7D CONVEYOR Client Contact details BMA COAL PTY LTD (DAVID SHAW)</p><p>Location 7D Conveyor PEAK DOWNS MINE</p><p>Contract Concrete Remedial around 7D Stacker</p><p>Description of Project Prepping and pouring various concrete slabs, shotcreting, fabricating and install handrails</p><p>Machinery 13t Excavator, Tip Trucks, Roller, Concrete Pump</p><p>Type of Contract Lump Sum </p><p>Contract Value $415,670.00</p><p>Start Date 28/05/2013</p><p>Finish Date 27/07/2013 CONCRETE WORK AT 7D CONVEYOR CULVERT INSTALLATION</p><p>Client Contact details BMA COAL PTY LTD</p><p>(COS GORDON)</p><p>Location EUREKA CREEK</p><p>BROADMEADOWS MINE</p><p>Contract Installation of culverts and apron slab in Eureka creek</p><p>Description of Project Excavation work, placement of precast culverts</p><p>Machinery 4.5t Excavator, 13t Excavator, Bobcat, Backhoe, Tip Trucks,Pad Foot Roller, Concrete Pump Type of Contract Lump Sum </p><p>Contract Value $315,208.00</p><p>Start Date 11/2003</p><p>Finish Date 03/2004 CONCRETE WORK AT CLARIFIER TANK</p><p>Client Contact details BMA COAL PTY LTD</p><p>(BRETT CLARK)</p><p>Location Clarifier Tank</p><p>PEAK DOWNS MINE</p><p>Contract Concrete Remedial around Clarifier Tank</p><p>Description of Project Excavation, placement & compaction of road base, formwork, steelfixing and pouring of various concrete slabs Machinery 4.5t Excavator, 13t Excavator, Bobcat, Backhoe, Tip Trucks,Pad Foot Roller, Concrete Pump Type of Contract Lump Sum </p><p>Contract Value $206,115.00 Start Date 14/05/2014</p><p>Finish Date 01/07/2014</p><p>CONCRETE WORK AT CLARIFIER TANK CONCRETE WORK AT CLARIFIER TANK BOOMERANG DAM & PIPE WORKS Client Contact details BMA COAL PTY LTD PEAKDOWNS MINE (BRAD WEST, LEON MEDLEY)</p><p>Location Boomerang Dam PEAKDOWNS MINE</p><p>Contract Rectification work at Ripstone dam</p><p>Description of Project Construct vehicle access road, concrete slabs. Install out take pipeworks from dam to pump station</p><p>Type of Contract Schedule of rates</p><p>Contract Value $295,000.00</p><p>Start Date 03/03/2012</p><p>Finish Date 31/10/2012</p><p>BOOMERANG DAM & PIPE WORKS BOOMERANG DAM & PIPE WORKS BLACKALL SHIRE COUNCIL Client Contact details BLACKALL SHIRE COUNCIL QUEENSLAND</p><p>Location Sale yards, Evora Rd. Blackall, QLD</p><p>Contract Earthworks for Heavy Vehicle Wash-down facilities</p><p>Description of Project Completion of all site preparation, grubbing and clearing. Carting of topsoil. Excavation of ponds, shaping and final trim. Digging and shaping drains.</p><p>Machinery 20t excavator, 7t roller, tip truck, water truck, hydraulic grab attachment, floatage.</p><p>Type of Contract Lump Sum in conjunction with QCCS who completed concrete work.</p><p>Contract Value $133,850.00</p><p>Start Date 07/06/2013</p><p>Finish Date 10/08/2013 MORANBAH RESOURCE RECOVERY CENTRE</p><p>Client Contact details ISAAC REGIONAL COUNCIL (KATRINA JONES)</p><p>Location MORANBAH RESOURCE RECOVERY CENTRE</p><p>Contract Concrete Slab with Walls</p><p>Description of Project Construction of 12m x 4m concrete slab, with a concrete bund wall 250mm thick x 800mm high.</p><p>Type of Contract Lump Sum</p><p>Contract Value $51,586.18</p><p>Start Date 27/01/2015</p><p>Finish Date 13/02/2015</p><p>PH:</p><p>Email: [email protected] OR CALL IN AND SEE US AT LOT8,LONG POCKET RD, MORANBAH</p><p>Construction work, culverts,oily water separator pits, concrete slabs.</p><p>Sheds designed & erected, roof repairs, building & maintenance works, steel fabrication, pipe & drainage works, security fencing, plumbing.</p><p>Earthworks, clean-up work, drain clearing, trenching, break up concrete. Augur holes.</p><p>All machinery hire -BACKHOES, EXCAVATORS, TIPTRUCKS, GRADER, LOADER, BOBCAT, ROLLER, DROP DECK, TILT TRAY & HEAVY HAULAGE HIRE.</p><p>All machinery with attachments – hydraulic hammers, augurs, long arms, rippers, grab, every size bucket.</p><p>ALL EMPLOYEES WITH CURRENT QUEENSLAND MINING GENERICS, BLACK COAL COMPETENCIES, AND ALL REQUIREMENTS TO MEET MINING INDUSTRY REGULATIONS.</p><p>Accommodation available at our quiet country camp.</p><p>Fully equipped training facilities are also available at our premises.</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages27 Page
-
File Size-