Solutions for Problems in Chapter 5

Solutions for Problems in Chapter 5

<p> Chapter 5 Job Costing</p><p>MULTIPLE-CHOICE QUESTIONS</p><p>5.16 Ans: C</p><p>5.17 Ans: C</p><p>5.18 Ans: C</p><p>5.19 Ans: B</p><p>5.20 Ans: B</p><p>EXERCISES</p><p>5.21 A. Cost of Goods Manufactured = $277,000</p><p>B. Prime Costs = 183,400 Conversion Costs = Manufacturing Overhead = 192,200 C. Cost of Goods Sold = $290,300</p><p>D. Net Income = $58,500</p><p>5.23 A. Budgeted costs $77,000 B. Fee = $84,700</p><p>5.24 A. $20/hr B. Total job cost for job #1502 $110,000 C. OH underapplied $(11,600) E. Job costing $110,000 F. Quote $154,000</p><p>5.25 B. Budgeted overhead = $66 per hour C. Total Costs for Schuller: $4,814 5-2 Cost Management</p><p>5.26 A. Total Actual Costs Incurred $535,000 B. Overhead was underapplied by $55,000. </p><p>5.27 A. $1,000,000 B. $788,000 C. $985,000</p><p>5.28 C. Ending WIP $203</p><p>5.29 A. Total cost – Job 717 $111,500 C. Underapplied OH $24,000</p><p>5.30 A. 197.5% of DL costs B. Revenue - $14,875</p><p>5.31 A. 139% of direct costs B. Price Quote $133,840 C. Underapplied OH $1,122,000</p><p>5.33 A. Labour = $800 B. Overhead = $900</p><p>5.34 A. Ending WIP Balance = $36,000 B. Direct labour = $7,500 C. Direct materials = $19,500</p><p>5.35 A. Cost of goods manufactured $64,750 Cost of goods sold $61,450</p><p>5.36 Cost of goods manufactured = $ 55,260</p><p>5.39 A. Overhead estimated allocation rate = $1.60 per machine hour B. Overhead allocated to Job No. 21 = $25,600 C. Overapplied overhead = $16,000 Chapter 5: Job Costing 5-3</p><p>5.40 B. $143,000 C. Total overhead overapplied $2,000</p><p>PROBLEMS</p><p>5.46 A. Overhead estimated allocation rates: Machining: = $20 per machine hour Finishing: = 125% of direct labour cost B. Overhead costs for Job 602: $9,138 C. Total cost for Job 602: $25,188 Per unit total cost $125.94</p><p>5.47 A. Overhead rate method 1: 140% of direct professional labour cost B. Overhead rate method 2: 67% of direct professional labour cost C. Overhead rate method 3: 38.5% of total direct costs D.</p><p>5.48 A. Allocated overhead cost for Job 75 using plant-wide rate: $105.00 B. Allocated overhead cost for Job 75 using production cost pools: $169.50</p><p>5.50 A. OH rate $75/hour B. Job 141 $30,000; Job 142 $17,500 D. Underapplied overhead $10,500 E. $96/hour</p><p>5.51 A. Set-up overhead estimated allocation rates Variable rate = 200% of direct labour costs Fixed rate = €40 per direct labour hour B. Overhead allocated to Job 20 during October: €900 C. Total cost of Job 20: €5,650 D. Amount of fixed overhead allocated to jobs in October: €9,160 Amount of variable overhead allocated to jobs in October: €11,450</p><p>MINI-CASES</p><p>5.52 B. $59.20 per machine hour</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us