Jpr Performance Requirement

Jpr Performance Requirement

<p> Southwest United Fire Districts DESCRIPTION: This JPR Training Guideline follows the format identified in NFPA 1002, Standard for Firefighter Professional Qualifications 2002 Edition. JPR PERFORMANCE Knowledge, skill, performance and topic description are referenced from the REQUIREMENT Certified Firefighter II & III Instructor Reference Manual developed by Illinois OSFM. Other materials are referenced as needed. Company Training Program</p><p>JPR Duty Area : Apparatus Driver/Operator (FAE) & FF2 Subject: Pump Ops Refresher 5 Standpipe Operations Job Performance Requirement: Supply water to fire sprinkler and/or standpipe systems, given specific system information, a fire department pumper and fire department connections, so that water is supplied to the system at the proper volume and pressure. OSFM # Skill / Knowledge / Performance / Topic Description NFPA Standar Validated #1002 d 11-8-2 Demonstrate the method specified to supply water to fire sprinkler and Pass/Fai  standpipe systems so that water is supplied to the system at the l proper volume and pressure. 11-8.4 Calculate the hose layouts, pump discharge pressure, and procedures Pass/Fai  to adequately supply water to that sprinkler system. l 11-8-5 Calculate the hose layouts, pump discharge pressure, and procedure Pass/Fai  to adequately supply water to that standpipe system. l 11-8-6 Identify the proper methods and procedures to supply a standpipe Pass/Fai  system if the fire department connection is not usable l 11-8-7 Identify at least one method of determining actual water flow into a Pass/Fai  standpipe system l 2-6.24 Demonstrate the operation of a charged attack line 1 ½” or larger into 1001 Pass/Fai  a building connecting it to a standpipe and advancing the line from the l standpipe</p><p>GENERAL TASK STATEMENT:  Spot apparatus at fire department connection and make connection to FDC for standpipe operation and sprinkler system support.  Attack crew operates from high rise pack at assigned floor/level</p><p>Prerequisite Knowledge Prerequisite Skills  Calculation of pumper discharge pressure  Spotting of apparatus at fire department  Hose layouts and appliances connection  Location of fire department connections  Hose lead-out operations  Alternative water supply options  Pump operations  Operating principles of sprinklers and standpipes  Hydrant hook-up operations</p><p>Validation Synopsis 1. Complete fire department connection and supply support to standpipe of sprinkler system according to department SOG. a. If using NFPA 1410 Evolution as guide, evolution must be completed in under 3.5 minutes. Southwest United Fire Districts Training Record Report Attendance Report Date:______Start Description: Pump Ops Refresher #5 Standpipe _ Time:______Operations</p><p>Station(s):______Category: Company – Single or Multi-Company Method: Course # : FAE ___ PR </p><p>Instructor(s):______Credit Hours (Total Time): 3 Type: FIRE ___</p><p>Print Name(s) ID # Signature(s) ID #</p><p>Objectives : 11-8-2, 11-8.4, 11-8-5, 11-8-6, 11-8-7, 2-6.24, </p><p>Description of Training (Notes) Spot apparatus at fire department connection and make connection to FDC for standpipe operation and sprinkler system support. Advance high rise pack from standpipe according to department SOG’s. Discuss fire attack operations and water supply/flow requirements.</p><p>______Type of Training Compan Multi- Officer Mutual Nigh Instructor Signature Drillmaster Approval y Comp. Aid t Tower Classroo Practic Combo. Driv Burn m al er Equipmen Feet of 1 Feet of 2 Supply Feet Number Number Gallons Number Total t ¾” ½” Hose of of of of of Number Used in Hose Hose Used / Ft. Ladde Trucks Water SCBA Of Training Used Used rs Engines Firefighter Session s</p><p>D:\Docs\2018-04-08\0c51cf5d4d78ac3e6cf2c07fbc5c61b7.doc</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us