Set (Presenter to Provide)

Set (Presenter to Provide)

<p> Dancenorth - Rainbow Vomit Tech Rider @ 11 October 2016</p><p>Set (Presenter to Provide) 1 Stage at least 10.5m Deep x 10.8m wide with a 7m High Grid or more. 2 Black Smother with minimum 1m Crossover at back of Stage 3 15 x 3m (400mm) Global Box Truss – See plans for configuration 4 2 x (400mm) Global Box Truss Cubes 5 6 x Global Box Truss Bases with all pins and clips to affix truss together 6 12 x 2m (48mm) Scaff Tube Black – to secure Truss legs to Building structure. Longer lengths may be required pending on Venue. 7 24 x Swivel Clamps – 51mm To attach Truss to Building with Scaff tube 8 2 x 1m Scaff Tube – Silver (Chrome) 9 4 x 90 deg Clamps – 51mm 10 4 x 10kg Sandbags Special Equipment 2 x Lifters (SML Cougars or Scissor lift to 7m) </p><p>Loading Dock to receive 2 x Pallets and 6m long Curtain Rolls</p><p>Dancing Tarkett – Black 10.5m Deep x 10m Wide Minimum – 10.5m Deep x 12m Preferred – Depending on Venue size Note:- Dancenorth can provide if required – Extra Freighting would be needed</p><p>Set (Company to Provide) 1 All set and props needed to realise the show Including 11 x Curtains with all running gear</p><p>Lighting (Presenter to Provide) 1 48 Channels of Dimming 2 20 x 1K Par Cans MFL (Silver if possible) 3 9 x LED (RGB) Par Cans 4 6 x LED (UV) Cannons - Instant On/Off 5 32 x 1.2K Fresnels 6 14 x Acclaim Axials 24/44 Profiles 7 1 x DMX Controlled Smoke Machine 8 1 x DMX Controlled Hazer</p><p>Lighting (Company to Provide) 1 All set electrics needed to realise the show 2 Show Control Computer and Jands VISTA M1 3 21 Inch Monitor with HDMI/VGA input</p><p>Sound (Presenter to Provide) 1 House PA System with Stereo Input from Company MOTU 2 2 x FOH (15 inch) Speakers (NEXO or Mackies) 3 2 x Foldback (12 inch) Speakers (NEXO or Mackies) 4 2 x Subwoofers (18 inch) (NEXO or Mackies)</p><p>Sound (Company to Provide)</p><p>Murray Dempsey - Production Manager Dancenorth p. 07 47722549 m. 0417 225 707 e. [email protected] 11 October 2016 1 Show Mac Computer 2 MOTU Stereo Feed from Qlab</p><p>Costume (Presenter to Provide) 1 2 x Costume Racks 2 Laundry Facilities available immediately after Show – Washing Machine, Drying Area (Dressing Rooms)</p><p>Costume (Company to Provide) All costumes provided needed to realise the show</p><p>Crew Required Bump IN Day 1 9am-11pm 4 x Mechs – Tarkett and Truss Install 9am – 6pm 1 x Rigger - To assist Install of Truss, fix truss to building and help attach curtains to truss. 10am – 6pm 3 x Lighting Technicians - Rig and Focus 9am – 11pm 1 x Sound Technician - (Unless FOH rig needs to be moved) 12pm – 4pm</p><p>Bump IN Day 2 1 x Mech 9am – 6pm 2 x Lighting 9am - 1 x Sound 1pm</p><p>Show Times 1 x Venue Tech 1 x Mech -backstage</p><p>Bump Out 4 x Mechs 1 x Rigger 3 x Lighting 1 x Sound/Venue Tech</p><p>Murray Dempsey - Production Manager Dancenorth p. 07 47722549 m. 0417 225 707 e. [email protected] 11 October 2016</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us