Dancenorth - Rainbow Vomit Tech Rider @ 11 October 2016

Set (Presenter to Provide) 1 Stage at least 10.5m Deep x 10.8m wide with a 7m High Grid or more. 2 Black Smother with minimum 1m Crossover at back of Stage 3 15 x 3m (400mm) Global Box Truss – See plans for configuration 4 2 x (400mm) Global Box Truss Cubes 5 6 x Global Box Truss Bases with all pins and clips to affix truss together 6 12 x 2m (48mm) Scaff Tube Black – to secure Truss legs to Building structure. Longer lengths may be required pending on Venue. 7 24 x Swivel Clamps – 51mm To attach Truss to Building with Scaff tube 8 2 x 1m Scaff Tube – Silver (Chrome) 9 4 x 90 deg Clamps – 51mm 10 4 x 10kg Sandbags Special Equipment 2 x Lifters (SML Cougars or Scissor lift to 7m)

Loading Dock to receive 2 x Pallets and 6m long Curtain Rolls

Dancing Tarkett – Black 10.5m Deep x 10m Wide Minimum – 10.5m Deep x 12m Preferred – Depending on Venue size Note:- Dancenorth can provide if required – Extra Freighting would be needed

Set (Company to Provide) 1 All set and props needed to realise the show Including 11 x Curtains with all running gear

Lighting (Presenter to Provide) 1 48 Channels of Dimming 2 20 x 1K Par Cans MFL (Silver if possible) 3 9 x LED (RGB) Par Cans 4 6 x LED (UV) Cannons - Instant On/Off 5 32 x 1.2K Fresnels 6 14 x Acclaim Axials 24/44 Profiles 7 1 x DMX Controlled Smoke Machine 8 1 x DMX Controlled Hazer

Lighting (Company to Provide) 1 All set electrics needed to realise the show 2 Show Control Computer and Jands VISTA M1 3 21 Inch Monitor with HDMI/VGA input

Sound (Presenter to Provide) 1 House PA System with Stereo Input from Company MOTU 2 2 x FOH (15 inch) Speakers (NEXO or Mackies) 3 2 x Foldback (12 inch) Speakers (NEXO or Mackies) 4 2 x Subwoofers (18 inch) (NEXO or Mackies)

Sound (Company to Provide)

Murray Dempsey - Production Manager Dancenorth p. 07 47722549 m. 0417 225 707 e. [email protected] 11 October 2016 1 Show Mac Computer 2 MOTU Stereo Feed from Qlab

Costume (Presenter to Provide) 1 2 x Costume Racks 2 Laundry Facilities available immediately after Show – Washing Machine, Drying Area (Dressing Rooms)

Costume (Company to Provide) All costumes provided needed to realise the show

Crew Required Bump IN Day 1 9am-11pm 4 x Mechs – Tarkett and Truss Install 9am – 6pm 1 x Rigger - To assist Install of Truss, fix truss to building and help attach curtains to truss. 10am – 6pm 3 x Lighting Technicians - Rig and Focus 9am – 11pm 1 x Sound Technician - (Unless FOH rig needs to be moved) 12pm – 4pm

Bump IN Day 2 1 x Mech 9am – 6pm 2 x Lighting 9am - 1 x Sound 1pm

Show Times 1 x Venue Tech 1 x Mech -backstage

Bump Out 4 x Mechs 1 x Rigger 3 x Lighting 1 x Sound/Venue Tech

Murray Dempsey - Production Manager Dancenorth p. 07 47722549 m. 0417 225 707 e. [email protected] 11 October 2016