Works Information & Site Information

Works Information & Site Information

<p>Project title</p><p>Works Information & Site Information</p><p>Scheme title</p><p>Client</p><p>Version control:</p><p>Rev Date Prepared by Details of revision 1</p><p>2</p><p>3</p><p>4</p><p>5</p><p>Works Information & Site Information, Version 1.0 Page 1 of 29 Project title</p><p>Contents:</p><p>Ref Description Page</p><p>1.WI. 1 General & Commercial</p><p>Brief description of the works</p><p>Project objectives and philosophy</p><p>1.WI.2 Employers requirements for Contractor's designed work</p><p>1.WI.2a Design:</p><p>Whole Site Development Brief</p><p>Final and approved Design Brief</p><p>Standards compliance - list of HTM's & HBN's</p><p>Schedule of functional content</p><p>Schedules of accommodation</p><p>Whole Hospital Operational Policies</p><p>Departmental Operational Policies</p><p>Schedule of derogations</p><p>Room data sheets</p><p>Development Control Plan 1:1000</p><p>1:500 signed off drawings</p><p>1:200 signed off drawings</p><p>1:50 signed off drawings</p><p>Equipment Schedules</p><p>1.WI.2b Design management:</p><p>Checking and approval</p><p>Use of design / Copyright / licence</p><p>Provision of Documents</p><p>Planning approvals</p><p>Building regulations</p><p>CAD Requirements</p><p>Works Information & Site Information, Version 1.0 Page 2 of 29 Project title</p><p>Contents (continued):</p><p>BREEAM Review</p><p>AEDET Review</p><p>Alternative / equivalent products</p><p>Acceptance of products and samples</p><p>1.WI.2c Strategies:</p><p>Approved Engineering Strategy</p><p>Approved Fire Strategy</p><p>Approved Energy Strategy</p><p>Final Security Strategy</p><p>Final IM&T Strategy</p><p>1.WI.2d Programme:</p><p>Programme requirements</p><p>Definition of Completion</p><p>Final clean</p><p>Security at completion</p><p>Access for correction of Defects</p><p>Known events and interruptions</p><p>Working hours</p><p>Information Release Schedule</p><p>Others working on site</p><p>Employer working on site</p><p>Planning requirements/ approvals </p><p>1.WI.2e Site management:</p><p>Use of the Site</p><p>Sign board</p><p>Protection of Existing Buildings & Services</p><p>Protection of the works</p><p>Works Information & Site Information, Version 1.0 Page 3 of 29 Project title</p><p>Contents (continued):</p><p>Noise levels</p><p>Removal of rubbish and debris</p><p>Deliveries</p><p>Waste materials / management</p><p>Storage facilities</p><p>Deleterious materials</p><p>Considerate Contractors</p><p>Constraints</p><p>Confidentiality</p><p>Security and Protection</p><p>Site passes</p><p>Facilities and services to be provided by the Contractor for use by the Employer and Others</p><p>Facilities and services to be provided by the Contractor for his own use</p><p>Facilities and services to be provided by the Employer for use by the Contractor</p><p>Work by Others with whom the Contractor shares the Working Areas</p><p>Property in excavated materials of demolished buildings</p><p>Salvaged / reclaimed materials</p><p>Marking Equipment, Plant & Materials</p><p>1.WI.2f Quality assurance:</p><p>Work Specifications</p><p>Infection control requirements</p><p>Building Manual</p><p>Maintenance Manual</p><p>As Built Drawings</p><p>Product literature</p><p>Works Information & Site Information, Version 1.0 Page 4 of 29 Project title</p><p>Contents (continued):</p><p>Spares</p><p>Training of Employers staff</p><p>Testing and Inspection</p><p>Inspection and test certificates</p><p>Commissioning</p><p>Witness testing</p><p>Nameplates and labels</p><p>Signage</p><p>Key suiting</p><p>Plant and Materials Off-Site</p><p>1.WI.2g Reports/ records:</p><p>PSCP progress report</p><p>Photographs</p><p>Records required (Clause 51.2)</p><p>1.SI Site Information</p><p>Site location</p><p>Site information</p><p>Boundaries of the site</p><p>Access to site</p><p>Adjacent Sites</p><p>Adjacent buildings, structures, plant</p><p>Existing structures and plant</p><p>Piped / cable services</p><p>Buried plant and services</p><p>Site hazards (asbestos etc)</p><p>Works Information & Site Information, Version 1.0 Page 5 of 29 Project title</p><p>Contents (continued):</p><p>Maintenance of public / private roads</p><p>Protection of existing trees, flora, fauna</p><p>Existing Site surveys/drawings</p><p>Existing Soil Investigations/report</p><p>Existing Infrastructure drawings</p><p>Works Information & Site Information, Version 1.0 Page 6 of 29 Project title</p><p>Works Information</p><p>Works Information & Site Information, Version 1.0 Page 7 of 29 Project title</p><p>Ref Description</p><p>1.WI. 1 General & Commercial</p><p>Brief description of the works:</p><p>Project objectives and philosophy:</p><p>Works Information & Site Information, Version 1.0 Page 8 of 29 Project title</p><p>1.WI.2 Employers requirements for Contractor's designed work</p><p>1.WI.2a Design:</p><p>Whole Site Development Brief:</p><p>Final and approved Design Brief:</p><p>Standards compliance - list of HTM's & HBN's:</p><p>Schedule of functional content:</p><p>Schedules of accommodation:</p><p>Whole Hospital Operational Policies:</p><p>Works Information & Site Information, Version 1.0 Page 9 of 29 Project title</p><p>Departmental Operational Policies:</p><p>Schedule of derogations:</p><p>Room data sheets:</p><p>Development Control Plan 1:1000:</p><p>1:500 signed off drawings:</p><p>1:200 signed off drawings:</p><p>Works Information & Site Information, Version 1.0 Page 10 of 29 Project title</p><p>1:50 signed off drawings:</p><p>Equipment Schedules:</p><p>Works Information & Site Information, Version 1.0 Page 11 of 29 Project title</p><p>1.WI.2b Design management:</p><p>Checking and approval:</p><p>Use of design / Copyright / licence:</p><p>Provision of Documents:</p><p>Planning approvals:</p><p>Building regulations:</p><p>CAD Requirements:</p><p>Works Information & Site Information, Version 1.0 Page 12 of 29 Project title</p><p>BREEAM Review:</p><p>AEDET Review:</p><p>Alternative / equivalent products:</p><p>Acceptance of products and samples:</p><p>Works Information & Site Information, Version 1.0 Page 13 of 29 Project title</p><p>1.WI.2c Strategies:</p><p>Approved Engineering Strategy:</p><p>Approved Fire Strategy:</p><p>Approved Energy Strategy:</p><p>Final Security Strategy:</p><p>Final IM&T Strategy:</p><p>Works Information & Site Information, Version 1.0 Page 14 of 29 Project title</p><p>1.WI.2d Programme:</p><p>Programme requirements:</p><p>Definition of Completion:</p><p>Final clean:</p><p>Security at completion:</p><p>Access for correction of Defects:</p><p>Known events and interruptions:</p><p>Working hours:</p><p>Information Release Schedule:</p><p>Works Information & Site Information, Version 1.0 Page 15 of 29 Project title</p><p>Others working on site:</p><p>Employer working on site:</p><p>Planning requirements/ approvals: </p><p>1.WI.2e Site management:</p><p>Works Information & Site Information, Version 1.0 Page 16 of 29 Project title</p><p>Use of the Site:</p><p>Sign board:</p><p>Protection of Existing Buildings & Services:</p><p>Protection of the works:</p><p>Noise levels:</p><p>Removal of rubbish and debris:</p><p>Deliveries:</p><p>Waste materials / management:</p><p>Works Information & Site Information, Version 1.0 Page 17 of 29 Project title</p><p>Storage facilities:</p><p>Deleterious materials:</p><p>Considerate Contractors:</p><p>Constraints:</p><p>Confidentiality:</p><p>Security and Protection:</p><p>Site passes:</p><p>Works Information & Site Information, Version 1.0 Page 18 of 29 Project title</p><p>Facilities and services to be provided by the Contractor for use by the Employer and Others:</p><p>Facilities and services to be provided by the Contractor for his own use:</p><p>Facilities and services to be provided by the Employer for use by the Contractor:</p><p>Work by Others with whom the Contractor shares the Working Areas:</p><p>Property in excavated materials of demolished buildings:</p><p>Salvaged / reclaimed materials:</p><p>Marking Equipment, Plant & Materials:</p><p>Works Information & Site Information, Version 1.0 Page 19 of 29 Project title</p><p>Works Information & Site Information, Version 1.0 Page 20 of 29 Project title</p><p>1.WI.2f Quality assurance:</p><p>Work Specifications:</p><p>Infection control requirements:</p><p>Building Manual:</p><p>Maintenance Manual:</p><p>As Built Drawings:</p><p>Product literature:</p><p>Spares:</p><p>Training of Employers staff:</p><p>Works Information & Site Information, Version 1.0 Page 21 of 29 Project title</p><p>Testing and Inspection:</p><p>Inspection and test certificates:</p><p>Commissioning:</p><p>Witness testing:</p><p>Nameplates and labels:</p><p>Signage:</p><p>Key suiting:</p><p>Plant and Materials Off-Site:</p><p>Works Information & Site Information, Version 1.0 Page 22 of 29 Project title</p><p>Works Information & Site Information, Version 1.0 Page 23 of 29 Project title</p><p>Works Information & Site Information, Version 1.0 Page 24 of 29 Project title</p><p>1.WI.2g Reports/ records:</p><p>PSCP progress report:</p><p>Photographs:</p><p>Records required (Clause 51.2):</p><p>Works Information & Site Information, Version 1.0 Page 25 of 29 Project title</p><p>Site Information</p><p>Works Information & Site Information, Version 1.0 Page 26 of 29 Project title</p><p>1.SI Site Information</p><p>Site location:</p><p>Site information:</p><p>Boundaries of the site:</p><p>Access to site:</p><p>Adjacent Sites:</p><p>Adjacent buildings, structures, plant:</p><p>Works Information & Site Information, Version 1.0 Page 27 of 29 Project title</p><p>Existing structures and plant:</p><p>Piped / cable services:</p><p>Buried plant and services:</p><p>Site hazards (asbestos etc):</p><p>Maintenance of public / private roads:</p><p>Protection of existing trees, flora, fauna:</p><p>Works Information & Site Information, Version 1.0 Page 28 of 29 Project title</p><p>Existing Site surveys/drawings:</p><p>Existing Soil Investigations/report:</p><p>Existing Infrastructure drawings:</p><p>Works Information & Site Information, Version 1.0 Page 29 of 29</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    29 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us