Works Information & Site Information
Total Page:16
File Type:pdf, Size:1020Kb
Project title
Works Information & Site Information
Scheme title
Client
Version control:
Rev Date Prepared by Details of revision 1
2
3
4
5
Works Information & Site Information, Version 1.0 Page 1 of 29 Project title
Contents:
Ref Description Page
1.WI. 1 General & Commercial
Brief description of the works
Project objectives and philosophy
1.WI.2 Employers requirements for Contractor's designed work
1.WI.2a Design:
Whole Site Development Brief
Final and approved Design Brief
Standards compliance - list of HTM's & HBN's
Schedule of functional content
Schedules of accommodation
Whole Hospital Operational Policies
Departmental Operational Policies
Schedule of derogations
Room data sheets
Development Control Plan 1:1000
1:500 signed off drawings
1:200 signed off drawings
1:50 signed off drawings
Equipment Schedules
1.WI.2b Design management:
Checking and approval
Use of design / Copyright / licence
Provision of Documents
Planning approvals
Building regulations
CAD Requirements
Works Information & Site Information, Version 1.0 Page 2 of 29 Project title
Contents (continued):
BREEAM Review
AEDET Review
Alternative / equivalent products
Acceptance of products and samples
1.WI.2c Strategies:
Approved Engineering Strategy
Approved Fire Strategy
Approved Energy Strategy
Final Security Strategy
Final IM&T Strategy
1.WI.2d Programme:
Programme requirements
Definition of Completion
Final clean
Security at completion
Access for correction of Defects
Known events and interruptions
Working hours
Information Release Schedule
Others working on site
Employer working on site
Planning requirements/ approvals
1.WI.2e Site management:
Use of the Site
Sign board
Protection of Existing Buildings & Services
Protection of the works
Works Information & Site Information, Version 1.0 Page 3 of 29 Project title
Contents (continued):
Noise levels
Removal of rubbish and debris
Deliveries
Waste materials / management
Storage facilities
Deleterious materials
Considerate Contractors
Constraints
Confidentiality
Security and Protection
Site passes
Facilities and services to be provided by the Contractor for use by the Employer and Others
Facilities and services to be provided by the Contractor for his own use
Facilities and services to be provided by the Employer for use by the Contractor
Work by Others with whom the Contractor shares the Working Areas
Property in excavated materials of demolished buildings
Salvaged / reclaimed materials
Marking Equipment, Plant & Materials
1.WI.2f Quality assurance:
Work Specifications
Infection control requirements
Building Manual
Maintenance Manual
As Built Drawings
Product literature
Works Information & Site Information, Version 1.0 Page 4 of 29 Project title
Contents (continued):
Spares
Training of Employers staff
Testing and Inspection
Inspection and test certificates
Commissioning
Witness testing
Nameplates and labels
Signage
Key suiting
Plant and Materials Off-Site
1.WI.2g Reports/ records:
PSCP progress report
Photographs
Records required (Clause 51.2)
1.SI Site Information
Site location
Site information
Boundaries of the site
Access to site
Adjacent Sites
Adjacent buildings, structures, plant
Existing structures and plant
Piped / cable services
Buried plant and services
Site hazards (asbestos etc)
Works Information & Site Information, Version 1.0 Page 5 of 29 Project title
Contents (continued):
Maintenance of public / private roads
Protection of existing trees, flora, fauna
Existing Site surveys/drawings
Existing Soil Investigations/report
Existing Infrastructure drawings
Works Information & Site Information, Version 1.0 Page 6 of 29 Project title
Works Information
Works Information & Site Information, Version 1.0 Page 7 of 29 Project title
Ref Description
1.WI. 1 General & Commercial
Brief description of the works:
Project objectives and philosophy:
Works Information & Site Information, Version 1.0 Page 8 of 29 Project title
1.WI.2 Employers requirements for Contractor's designed work
1.WI.2a Design:
Whole Site Development Brief:
Final and approved Design Brief:
Standards compliance - list of HTM's & HBN's:
Schedule of functional content:
Schedules of accommodation:
Whole Hospital Operational Policies:
Works Information & Site Information, Version 1.0 Page 9 of 29 Project title
Departmental Operational Policies:
Schedule of derogations:
Room data sheets:
Development Control Plan 1:1000:
1:500 signed off drawings:
1:200 signed off drawings:
Works Information & Site Information, Version 1.0 Page 10 of 29 Project title
1:50 signed off drawings:
Equipment Schedules:
Works Information & Site Information, Version 1.0 Page 11 of 29 Project title
1.WI.2b Design management:
Checking and approval:
Use of design / Copyright / licence:
Provision of Documents:
Planning approvals:
Building regulations:
CAD Requirements:
Works Information & Site Information, Version 1.0 Page 12 of 29 Project title
BREEAM Review:
AEDET Review:
Alternative / equivalent products:
Acceptance of products and samples:
Works Information & Site Information, Version 1.0 Page 13 of 29 Project title
1.WI.2c Strategies:
Approved Engineering Strategy:
Approved Fire Strategy:
Approved Energy Strategy:
Final Security Strategy:
Final IM&T Strategy:
Works Information & Site Information, Version 1.0 Page 14 of 29 Project title
1.WI.2d Programme:
Programme requirements:
Definition of Completion:
Final clean:
Security at completion:
Access for correction of Defects:
Known events and interruptions:
Working hours:
Information Release Schedule:
Works Information & Site Information, Version 1.0 Page 15 of 29 Project title
Others working on site:
Employer working on site:
Planning requirements/ approvals:
1.WI.2e Site management:
Works Information & Site Information, Version 1.0 Page 16 of 29 Project title
Use of the Site:
Sign board:
Protection of Existing Buildings & Services:
Protection of the works:
Noise levels:
Removal of rubbish and debris:
Deliveries:
Waste materials / management:
Works Information & Site Information, Version 1.0 Page 17 of 29 Project title
Storage facilities:
Deleterious materials:
Considerate Contractors:
Constraints:
Confidentiality:
Security and Protection:
Site passes:
Works Information & Site Information, Version 1.0 Page 18 of 29 Project title
Facilities and services to be provided by the Contractor for use by the Employer and Others:
Facilities and services to be provided by the Contractor for his own use:
Facilities and services to be provided by the Employer for use by the Contractor:
Work by Others with whom the Contractor shares the Working Areas:
Property in excavated materials of demolished buildings:
Salvaged / reclaimed materials:
Marking Equipment, Plant & Materials:
Works Information & Site Information, Version 1.0 Page 19 of 29 Project title
Works Information & Site Information, Version 1.0 Page 20 of 29 Project title
1.WI.2f Quality assurance:
Work Specifications:
Infection control requirements:
Building Manual:
Maintenance Manual:
As Built Drawings:
Product literature:
Spares:
Training of Employers staff:
Works Information & Site Information, Version 1.0 Page 21 of 29 Project title
Testing and Inspection:
Inspection and test certificates:
Commissioning:
Witness testing:
Nameplates and labels:
Signage:
Key suiting:
Plant and Materials Off-Site:
Works Information & Site Information, Version 1.0 Page 22 of 29 Project title
Works Information & Site Information, Version 1.0 Page 23 of 29 Project title
Works Information & Site Information, Version 1.0 Page 24 of 29 Project title
1.WI.2g Reports/ records:
PSCP progress report:
Photographs:
Records required (Clause 51.2):
Works Information & Site Information, Version 1.0 Page 25 of 29 Project title
Site Information
Works Information & Site Information, Version 1.0 Page 26 of 29 Project title
1.SI Site Information
Site location:
Site information:
Boundaries of the site:
Access to site:
Adjacent Sites:
Adjacent buildings, structures, plant:
Works Information & Site Information, Version 1.0 Page 27 of 29 Project title
Existing structures and plant:
Piped / cable services:
Buried plant and services:
Site hazards (asbestos etc):
Maintenance of public / private roads:
Protection of existing trees, flora, fauna:
Works Information & Site Information, Version 1.0 Page 28 of 29 Project title
Existing Site surveys/drawings:
Existing Soil Investigations/report:
Existing Infrastructure drawings:
Works Information & Site Information, Version 1.0 Page 29 of 29