Location of Building to Which Work Relates

Location of Building to Which Work Relates

<p> London Borough of Tower Hamlets Building Control</p><p>COMMENCEMENT NOTICE The Building Act 1984 | The Building Regulations 2000 (as amended)</p><p>Application Number Place Directorate, Building Control, Mulberry Place, 5 Clove Crescent, London E14 2BG / / Tel: 020 7364 5009 | Fax: 020 7364 5265 | Email: [email protected]</p><p>1 Statement I confirm I have submitted a Building Regulations application (reference number above) which has been acknowledged. I am submitting this notice for the work described below in line with Regulation 15(1) giving at least TWO DAYS notice of the intention to commence work. Full Signature: Date: Name: Owner/Occupier Agent Builder (please tick as applicable)</p><p>2 Location of building to which work relates</p><p>Address: Postcode: </p><p>3 Owner/Occupier commissioning building work Full Name: Address: Postcode: Tel: Fax: Email: </p><p>4 Builders Details Full Name: Company: Address: Postcode: Tel: Fax: Email: </p><p>5 Commencement Date Date that work will commence: </p><p>6 Proposed work Description: </p><p>Please read notes overleaf.</p><p>COM v1.6 Page 1 of 2 Commencement Notice Notes</p><p>1. Before submitting this notice and starting work you must submit an application under the Building Act 1984, The Building Regulations 2000 (as amended). Application forms can be found on our website www.towerhamlets.gov.uk/data/planning/index.cfm</p><p>2. In addition to the Notice of Commencement, Regulation 15 of the Building Regulations 2000 (as amended) requires the person carrying out building work to give notice in writing of: a. The covering up of any excavation for a foundation, any foundation, any damp proof course or any concrete or other material laid over a site, or any drain or sewer to which The Regulations apply, at least two days beforehand. b. The laying, haunching or covering any drain or sewer, in respect of which Part H of Schedule 1 (drainage and waste disposal) imposes a requirement, not more than five days after the completion of the work.</p><p>3. The London Borough of Tower Hamlets upholds the principles of the Data Protection Act. The information supplied on this form and in future by telephone, correspondence or verbally will be held on computer for the purpose of Building Control administration.</p><p>4. Further information and advice on the Building Regulations may be obtained from our website www.towerhamlets.gov.uk/data/planning/index.cfm, If you would like to visit in person please telephone us on 020 7364 5009 to make an appointment. (Press option 2 for Building Control).</p><p>COM v1.6 Page 2 of 2</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us