<p>December 22, 2014</p><p>CHELIFF TRANSFER TOWERS – Steel structure STUDIES</p><p>Kind Attention : Mr. S.Gunasekaran</p><p>Indes Engineering and </p><p>IT Services Pvt. Ltd.,</p><p>Chennai, India</p><p>Person in charge : Mr. S. Gopinath</p><p>Direct phone : 044 4292 7305</p><p>Email : [email protected]</p><p>Subject:</p><p>REQUEST FOR QUOTATION</p><p>WORK DESCRIPTION : Steel Structure study of Transfer Towers (10 Nos.) includes preparation of Design, Calculation note, and detail drawings with the part list for IENET – steel structure. Issue of all execution drawings according to our standard (S20 / S50 / S60)</p><p>TARGET DATE : 29 DECEMBER 2014</p><p>Dear Sir,</p><p>Page 1 of 3 FIVES INDIA would hereby request INDES Engg to submit a quote for the studies of steel structure (10 Transfer towers) of Design, calculation & detail drawings of here above mentioned items and services. This will be in strict accordance to the below requirements and all attached documentation:</p><p>The quote shall be made up with the following indications and documents:-</p><p> Technical description and pointing out of possible differences with regard to all specifications. No deviations or exceptions will be considered unless formally accepted in writing by Fives India,</p><p> Acceptance of the schedule of design/document submission</p><p> Delivery time</p><p> Signed confidentially agreement,</p><p> Detailed price breakdown to be provided </p><p> Specific requests:</p><p> o Documentation about your company including Previous relevant experience,</p><p> o Name of your subcontractors and scope you intend to sub-contract, if any.</p><p> The quote shall be submitted to the undersigned</p><p> All clarifications related to this RFQ are to be sent by e-mail to the undersigned.</p><p>Scope of work:</p><p> Design calculation using STAAD pro software Calculation note in word format (ENGLISH) similar to given analogy document. Detail drawings preparation using TEKLA software. Final output of detail drawings to be in AutoCAD format All revisions/comments Bill of material for detail drawings in Fives FCB format using mark, sub mark methodology Entering of part list in Fives FCB IENET web based software.</p><p>Page 2 of 3 Documents Enclosed:</p><p> Steel structure design – typical contract Standard to follow Typical calculation note in French. Transfer towers preliminary time schedule. Guide line drawings & Equipment drawings for Quotation purpose only</p><p>Notes:</p><p> Vendor calculation note documentation will be in ENGLISH only and the same shall be utilized by Fives FCB for FRENCH translation. Client will give comments in FRENCH document only which will be forwarded to vendor as it is. All Documents prepared by vendor related to the subject Design, calculation note and detail drawings shall be as per the FIVES formats. Revision if any given by FIVES on the vendor submitted documents shall be corrected and revised documents to be provided by vendor are part of this RFQ only</p><p>VERY IMPORTANT</p><p>Please acknowledge the receipt of this tender call by return e-mail or by fax at your earliest.</p><p>Looking forward to your reply, we remain,</p><p>Yours faithfully</p><p>S. Gopinath</p><p>Manager – Engineering</p><p>Fives India Engineering & Projects Pvt. Ltd.,</p><p>Page 3 of 3</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-