Annex B: Tower Requirements

Annex B: Tower Requirements

<p>Annex B: Tower Requirements. To be used in conjunction with the General tower specification ETSP0383 & ETSP0158</p><p>Compiled by: M.P Ngwenyama Date: 15.08.2016</p><p>Project Information Site Name Lebohang Substation Proximity Ermelo, Mpumalanga Province Project Lebohang SS – BME, Project No PRJ09147 Name PDH Ericsson CN20 Radio Link</p><p>Tower Height Height of section 21m Top / Bottom Section required Design Height 21m Landing 1 Platform ±15 m AGL Height Aircraft Warning Lights Yes Landing 2 Platform ±20 m AGL Height Painting Required No Site Accessibility Very good Horizontal Cable Tray ±6m Cable Gantry Length No estimate</p><p>Tower Loading Antennas Height Qty Eskom Requirements 1.2 m Solid – Devon RS 20.5 m 1 </p><p>Mast/Tower design SANS 10100 SANS 10160 SANS 1062 BS8100 Part 1& 2</p><p>Foundation Please see attached general tower specification ETSP0383</p><p>Future: </p><p>1.8 m Solid antenna 15.5 m 1 1.2 m Solid antenna 15 m 2 General Tower Specification REFERENCE REV ETSP0383 3 PAGE 2 OF 2</p><p>Scope of Work</p><p>Antenna mounting bracket must be supplied & fitted on the tower during construction as follows:  Install 1 bracket, with their center lines, 0.5 m above the 20 m landing platform, one towards Devon RS. The exact positions will be discussed later with the successful supplier.</p><p>Site information:</p><p>1. The tower position is on flat terrain, supply tower & foundation for the correct terrain category. 2. The site for the tower installation is allocated out site a HV yard, but inside the substation. 3. The tower contractor must install a proper tower earth mat for this site. The tower earth in the foundation and the down conductor must be bonded together and copper welded to the substation earth mat. 4. Excavation material can be used on site as filling as far as possible, but any excess material must be removed from site and disposed of at a registered dumping ground. 5. The Lebohang substation is ±1 km to Lesley town, in Mpumalanga province. 6. Vehicle access not a problem, adjacent to main tar road. 7. Concrete must be mixed by hand or by portable concrete mixer on site. 8. Accommodation is available at Lesley town</p><p>M.P Ngwenyama 079 884 6926</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us