Design Team Meeting Minutes

Design Team Meeting Minutes

<p> QUALITY POLICY: "TO BE THE PREMIER MANUFACTURING COMPANY IN THE WORLD"</p><p>DESIGN TEAM A&E Firm Meeting Minutes Meeting type: design, construction, etc.</p><p>Meeting #</p><p>LOCATION: XXXXXXXXX XXXXXXXXX XXXXXXXXX Sequential Numbering DATE: </p><p>REFERENCE: DaimlerChrysler Program and Location XXXXXXXXXXXXXX Construction Team Meeting Minutes Contractor Project Number PRESENT: DaimlerChrysler Firm A Firm B Firm C</p><p>DISTRIBUTION: All Present DaimlerChrysler Firm A Firm B Firm C</p><p>The purpose of this meeting was to discuss management issues. Questions regarding these minutes can be directed to Meeting Minutes were distributed via e-mail to all. Design Team Meeting Minutes Date: Meeting # Page 2</p><p>The next meeting is scheduled for , at . Design Team Meeting Minutes Date: Major Heading Meeting # Page 3</p><p>Open, Closed, 1.0 General Critical, Info. Red, Yellow, Item Description Green Current Status (identifies Responsibility meeting A.BB.CC Target Date number) A- Major Heading Closed Date B- Meeting # A.BB.CC C- Item # *Same numbering system as Construction minutes</p><p>2.0 Quality Item Description Current Status (identifies Responsibility meeting Target Date number) Closed Date</p><p>3.0 Bid Pack Schedule</p><p>Item Description Current Status (identifies Responsibility meeting Target Date number) Closed Date</p><p>4.0 Submittals</p><p>Item (identifies Description Current Status meeting Responsibility number Target Date Closed Date Design Team Meeting Minutes Date: Meeting # Page 4</p><p>5.0 Bid Package Progress</p><p>Item (identifies Description Current Status meeting Responsibility number Target Date Closed Date</p><p>6.0 Bulletins</p><p>Item (identifies Description Current Status meeting Responsibility number Target Date Closed Date</p><p>7.0 Contractor Concerns/RFI's</p><p>Item (identifies Description Current Status meeting Responsibility number Target Date Closed Date Design Team Meeting Minutes Date: Meeting # Page 5</p><p>8.0 Open Issues</p><p>Issue #/Status: Description of problem/issue: Area/Grouping: Assigned to: Date/Status: Info/Open/Hold/ Make sure that contractors open issue lists in meeting Verify/Closed minutes meet AAME MQAS requirements.</p><p>DSC101 ROOT CAUSE – 5 WHY ANALYSIS (if req’d): Program Diana Hedrick Origin Date: CLOSED 9/12/00 Not applicable Administrator 09/12/00</p><p>DESCRIPTION OF THE ACTION PLAN/PDCA: Target Date: In order to ensure MQAS requirements are met, a standard form 11/15/00 will be created to be utilized by all partners on the project. Closed Date: FOLLOW-UP STATUS: 1 09/12/00 Identify requirements for MQAS and AAME 1/ 09/12/00 Spoke with G. Pelletier to determine format 1 09/12/00 Spoke with Hannelore to confirm MQAS requirements are met 4/ 0 EVIDENCE OF EFFECTIVENESS (if req’d): 0 11/14/00 MQAS requirements are met. Form being used by partners currently on this program.</p><p>******************** Meeting Adjourned at X:XX p.m. ******************** Design Team Meeting Minutes Date: Meeting # Page 6</p><p>DAIMLERCHRYSLER PRTAP EXPANSION MEETING SIGN-IN SHEET INITIAL NAME PHONE Pager FAX EMAIL</p><p>DC-AME</p><p>DCX-Purchasing/V.A.</p><p>DCX</p><p>DCX-SE & E</p><p>DCX – Plant</p><p>Architect</p><p>DSI</p><p>Contractor X</p><p>Contractor Y</p><p>Contractor Z</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us