<p> Table 4: IF YOU ARE CONSTRUCTING A DOCKING FACILITY, PLEASE PROVIDE THE FOLLOWING</p><p>Structures Type of Work* Length** Width** Height** Total Sq. ft. # Proposed # Existing over water Slips Slips</p><p>Docks/Piers/Number:</p><p>Finger Piers/Number:</p><p>Other Water Structures:</p><p>Total:</p><p>*Type of Work N-New R-Replaced O-Other RR-Removed A-Altered/Modified **In Feet</p><p>Use of Structure </p><p>Will the docking facility provide:</p><p>Livaboard Slips? If yes, Number: </p><p>Fueling Facilities: If yes, Number: : </p><p>Sewage Pump-out Facilities? If yes, Number: </p><p>Other Supplies or Services Required for Boating (excluding refreshments, bait and tackle) Yes No</p><p>Type of Materials for Docking and Pilings (i.e., CCA, pressure treated wood, plastic, or concrete)</p><p>Pilings : </p><p>Docking : </p><p>Proposed Dock Plank Spacing (if applicable) : </p><p>Proposed Size (length and draft), Type, and Number of Boats Expected to Use or Proposed to be Mooring at the facility) : </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-