Table 4: IF YOU ARE CONSTRUCTING a DOCKING FACILITY, PLEASE PROVIDE the FOLLOWING
Total Page:16
File Type:pdf, Size:1020Kb
Table 4: IF YOU ARE CONSTRUCTING A DOCKING FACILITY, PLEASE PROVIDE THE FOLLOWING
Structures Type of Work* Length** Width** Height** Total Sq. ft. # Proposed # Existing over water Slips Slips
Docks/Piers/Number:
Finger Piers/Number:
Other Water Structures:
Total:
*Type of Work N-New R-Replaced O-Other RR-Removed A-Altered/Modified **In Feet
Use of Structure
Will the docking facility provide:
Livaboard Slips? If yes, Number:
Fueling Facilities: If yes, Number: :
Sewage Pump-out Facilities? If yes, Number:
Other Supplies or Services Required for Boating (excluding refreshments, bait and tackle) Yes No
Type of Materials for Docking and Pilings (i.e., CCA, pressure treated wood, plastic, or concrete)
Pilings :
Docking :
Proposed Dock Plank Spacing (if applicable) :
Proposed Size (length and draft), Type, and Number of Boats Expected to Use or Proposed to be Mooring at the facility) :