Milling and Paving Notice

Milling and Paving Notice

<p> FINAL PAVING NOTICE</p><p>Belmont Glen Village Julia Street</p><p>September 25-28, 2015</p><p>Dear Homeowners:</p><p>Starting on Friday, September 25th and/or on Monday, the 28th, the Developer’s contractors will complete the final paving with new asphalt topping of the streets within Belmont Glen Village noted in the enclosure. We need your assistance to make this operation run smoothly. </p><p>Please have any vehicles moved off of the street’s asphalt in front of your homes each morning by 7 AM. Please have any basketball goals in front of your homes pulled back from the street’s paved areas. On your specified trash and recycling days, please place your containers on the grass medial strips in front of your homes. Basically, we need unimpeded access to the street’s asphalt areas for the days we are working. If vehicles are still in the asphalt areas, we will be forced to tow them to an area that is not in the construction work zone.</p><p>You will have continued access to your homes throughout the process. Deliveries can still be scheduled. Crews from Virginia Paving will be on site daily to direct traffic in and out of the areas they are working. It will be a slight inconvenience, but the results of your efforts will be well worth it, “newly paved streets”. Once the new pavement is laid, take care when turning sharply or stopping quickly until the asphalt cools down after a few days. Also, take care when walking on the new asphalt and entering your home as the oils from the new asphalt can be tracked onto your floors by you and your family.</p><p>The dates are a bit flexible due to any weather we may get between now and project completion. During the paving operation, weather can also delay the topping operation. Therefore, we have scheduled the two day time frame for the completion of the entire operation. The contractors will stop work at 5 PM or 6 PM. </p><p>If you have any questions, you can contact me via email at [email protected] or by cell at 571-220-3412.</p><p>Thank you for your cooperation, </p><p>Mark Flynn for Elm Street Development</p><p>Enclosure</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us