<p> System-Wide Accessibility Weekly Update For week of Sunday 1/9/11-Saturday 1/15/11</p><p>General:</p><p> Met with Labor Relations Department to discuss discipline process for Class I violations Met with Bus Operations Training School to review upcoming Bus Recertification</p><p>Design and Engineering: </p><p> The following plans were reviewed and comments submitted o Review comments for Wollaston Station as a result of site inspection with respect to the proposed installation of new elevators o Elevator Design Standards with specifications, along with many comments o Building Code Analysis along with other codes on Redundant and Replacement Elevator Program</p><p> Site Inspections/Site Visits o Lechmere Station (mobile lift on outbound platform, mini-high platform on inbound platform, new accessible parking spaces with crosswalks blocked with snow mounds, etc.) o Science Park Station (temporary stairs, handrails, etc.) Massachusetts Bay Transportation Authority o Copley Station (verify mobile lifts on two platforms,Ten Park Plaza, Boston, MA 02116 elevator issues, etc.) www.mbta.com Meetings o Project review meeting on South Shore Garages (three garages - 30% Design) with Operations, Design & Construction and Engineering & Maintenance o Meeting with the MBTA Planning Department on proposed parking garage at Haverhill Commuter Rail Station.</p><p>Customer Complaints:</p><p>Tracked 9 customer complaints; 7 complainants. 8 Fixed Route 1 THE RIDE 2 Fixed Route complaints forwarded to Office of Diversity & Civil Rights (ODCR) for investigation 1 fixed route commendation</p><p>Internal Access Monitoring Program:</p><p> 11 Monitors conducted 43 trips throughout all of fixed route system (39 Bus; 4 Subway) Continued preparing quarterly internal monitoring reports Scanned 95 completed monitoring forms</p><p>Reduced Fare CharlieCard Program Activity </p><p> Issued 662 reduced-fare CharlieCards: 393 Senior CharlieCards 246 Transportation Access Pass (TAP) CharlieCards 13 Blind Access CharlieCards 10 “THE RIDE” CharlieCards Processed 125 account deposits for customers of the </p><p>SWA Weekly Update 1/15/11 Page 2 of 3 MBTA Paratransit program THE RIDE </p><p>SWA Weekly Update 1/15/11 Page 3 of 3</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-