Version 3 - Residential Unit Summary and Estimated Occupancy / Parking Ratios

Version 3 - Residential Unit Summary and Estimated Occupancy / Parking Ratios

<p>Westbank Submission 1 vs. 2 vs. 3 – “Cheat Sheet” or “Fun Facts” 25 January 2017</p><p>Buildings Vers 1 Vers 2 Vers 3 Comments</p><p># of Towers 7 towers 6 towers 6 towers Each tower ~600 sq m floorplate; 25m separation between towers Property 1 Bloor – 9 floors 9 floors (30m) 7 floors (24m) 31 rental units Markham West (36m) Corner (backs onto Palmerston) Property 1b Palmerston 7 floors Deleted for n/a Lane (~30m) park Property 2 Bloor – 25 (82m) 24 (73m) 24 (72m) 286 rental units – North Markham East across 2 towers Tower Corner combined Property 2 Markham East 19 (63m) 21 (64 m) 19 (58m) – South Tower (behind Tower heritage buildings) Property 3 - Bloor – Bathurst 29 (93m) 25 (76m) 25 (75m) 395 rental units North Corner across 2 towers Tower combined Property 3 Bathurst Street 25 (82m) 29 (90m) 28 (84 m) – South Midblock tower Tower (mid- Block) Property 4 Bathurst – 15 + 3 for 13 + 2 (42m) 13 (+2) (41m) 94 rental units Lennox “Corner” mechanical plant (53m) Retail 15m 9m 9m Part of tower height Height reduction</p><p>Units 1017 928 806 -211 units (-21%) Residential 71,005 m2 65,174 m2 59,882 m2 GFA Non- 15,455 m2 15,992 m2 + 15,253 + 4,990 residential +2,166 4,410 (heritage) GFA (heritage) (heritage) Market 1560 m2 (incl) Total GFA 86,460 m2 87,020 m2 82,124 m2 FSI 6.25 6.0 5.8 (??) Not sure of version 3</p><p>Parking 674 (~436 572 (352 473 (245 -191 (-43%) tenet tenet; 238 Tenet; 220 Tenet; 228 parking; commercial commerical) Commerical Commercial unchanged paid) paid) levels 3 5 4 Bike 962 911 1038 (addition of surface parking bike parking)</p><p>Parkland 0 900 sq m 1250 m2 Heritage 15 21 23 26 total listed Westbank Submission 1 vs. 2 vs. 3 – “Cheat Sheet” or “Fun Facts” 25 January 2017</p><p>Version 3 - Residential Unit Summary and Estimated Occupancy / Parking Ratios</p><p>Residential Units # units Estimated Occupancy # of people Studio 225 (28%) 1 person 225 1 Bedroom 237 (29%) 1.5 persons 355.5 2 Bedroom 188 (23%) 2 persons 376 3 Bedroom 115 (14%) 2.5 persons 287.5 Live / Work 41 (5%) 1 person 41 TOTAL 806 units 1285 residents</p><p>Residential Parking Parking spots per unit = . spots = 248 3</p><p>Residential Bike Parking Bike spots per unit = 1 Spots = 808 </p><p>Version 2 - Residential Unit Summary and Estimated Occupancy / Parking Ratios</p><p>Residential Units # units Estimated Occupancy # of people Studio 1 person 163 163 (18%)</p><p>1 Bedroom 394 (42%) 1.5 persons 591 2 Bedroom 257 (28%) 2 persons 514 3 Bedroom 90 (10%) 2.5 persons 225 Live / Work 25 (3%) 1 person 25 TOTAL 929 units 1518 residents</p><p>Residential Parking Parking spots per unit = . spots = 352 38</p><p>Residental Bike Parking Bike spots per unit = .85 Spots = 795</p><p>Version 1 - Residential Unit Summary and Estimated Occupancy / Parking Ratios</p><p>Residential Units # units Estimated Occupancy # of people Studio 1 person 62 62 (6%)</p><p>1 Bedroom 462 (45%) 1.5 persons 693 2 Bedroom 390 (38%) 2 persons 780 3 Bedroom 87 (9%) 2.5 persons 217.5 Live / Work 15 (1%) 1 person 15 TOTAL 1016 1767 residents</p><p>Residential Parking Parking spots per unit = . spots = 436 43</p><p>Residential Bike Parking Bike spots per unit = .85 Spots = 867 Westbank Submission 1 vs. 2 vs. 3 – “Cheat Sheet” or “Fun Facts” 25 January 2017</p><p>Comments:</p><p>Laneways: </p><p>- Honest Ed’s Alleyway retained in current position; proposed to be sold to WB so they can put parking beneath it; city will require easements for public access in perpetuity and no allowance for building on it - Palmerston Lane widened to 6m (+2.6m) - Eliminated East-West laneway at north end of park and added that space to the park - East-West laneway between Bathurst and Markham Street (WB owned land with public easement)</p><p>Sidewalks:</p><p>- Sidewalks widened to 6m in blocks with all new construction. o Bloor Street (Markham to Bathurst) and Bathurst Street (Bloor to East-West Laneway) o Planting of Trees in these sections - Sidewalks maintained at current depth for sections of Bloor and Bathurst with Heritage Buildings (very narrow; no room for trees)</p><p>Enhanced Public Realm – Loading Docks / Parking Ramps, etc</p><p>- Parking Ramps o 1 Parking Ramp off of Lennox Street Servicing Commercial + Market + some Tenet (underground parking on property between Markham and Honest Ed’s Laneway) o Main idea is to combine all underground parking IF the city allows construction under city owned Honest Ed’s Alley o Eliminates surface level market docks and moves them below grade o Eliminates parking ramp off East-West Laneway o Combines Commercial and Tenet Parking into 1 huge underground parking lot accessed off Lennox Street o Elimination of 2nd ramp and moving loading docks below grade opens up space that WB proposes to use to extend the market and enabling a “diagonal cut-through” to the Plaza at the Bathurst-Bloor Corner</p><p>Road Modifications:</p><p>- Version 3 proposal is to widen eastern end of Lennox Street creating a dedicated left turn lane - Lennox is widening by taking property from the city owned right of way on both the WB and Randolph Academy sides of the road</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us