Contact: Nick Coccia - NAAMS Project Manager

Contact: Nick Coccia - NAAMS Project Manager

<p> NAAMS Project 1000 Town Center Drive Suite 300 Southfield, MI 48075 248-223-9000</p><p>Contact: Nick Coccia - NAAMS Project Manager NOTE: ALTERNATE MEETING Mobile: 248-860-2717 LOCATION – SEE MAP [email protected] LOCATED AT BOTTOM OF MEETING AGENDA AGENDA. Meeting Name: NAAMS Global Assembly Component Team Meeting Date and Time: January 08, 2014 7:30 AM Location: 1000 Town Center Drive - Suite 300, Southfield, MI 48075</p><p>2014 Meeting Dates: January 08 March 05 June 04 September 03 December 03</p><p>* Note: Shaded column, line item numbers, referenced from August 14, 2013 meeting report.</p><p>Sect. Pages Responsible Item Agenda Discussion Topics: * Personnel 1. Attendance/Introductions: - - - G. Bode 1.2 Emergency Procedures: - - - K. Taylor 2. Approval of August 14, 2013 Meeting Report: - - - G. Bode 3. Website Updates: - - - 14.2Ø mounting hole updated to coincide with the same on N. Coccia - 11. R 4 Page 14. Dowel Hole Tolerance Issue: Last meeting, March 01, 2014 4. 5. - - - shall be end of running change. Locating Pin Wear: Updates from team. Reminder that 5. Chrysler, Ford, and GM to recommend which pins get treated, 6. TBD TBD ALL if approved as new NAAMS Standard. Power Clamp – European Mounting Hole Pattern – Update: Nick distributed information from Destaco. Only response is noted below: ------Original Message----- From: Detlef Redante <[email protected]> To: nickjcoccia <[email protected]> Sent: Thu, Aug 22, 2013 3:30 am Subject: Antwort: NAAMS Global Assembly Components Meeting Report for August 21, 2013</p><p>6. Hallo Nick, 7. - - R. Bowdich</p><p>I would for sure support the DeStaCo′s point. It would strengthen my position. I still stick to my generic Clamps that are independent from the supplier. DeStaCo now tries to get released as 3rd source for those.</p><p>Mit freundlichen Grüßen / Kind Regards / afectuosamente / Pozdrowienia / С уважением Detlef Redante Dipl.Ing (FH) ME Body Design & Welding Standards</p><p>Page 1 of 4 7. Blade Style Risers: Update from Kuka 8. TBD TBD K. Taylor Heavy Duty – Drop Away Leaf Assembly: Delayed from last meeting, but information from previous reports/agendas shall remain below in blue text for reference purposes. Ken Taylor presented a preliminary model of the next version for inclusion to Section N. The following characteristics were noted during the discussion:  Bore sizes shall be 125 and 160MM  Width of assembly is approximately 18”, but the final dimension is to be determined based upon further discussion.  Mounting can be accomplished from any side of the unit. 8. 9. N TBD Team  Chamfer corners of assembly side plates to reduce weight and for packaging purposes.  Many core sub-components are made from the same metal thickness, to allow grinding all items at once.  Load weight restrictions for moving objects to be determined at a later date.  Ken Taylor has CATIA files of the assembly, and will provide them to anyone who requests them  K. Taylor will also design preliminary pedestal risers to review with team at the next meeting. An interactive PDF file shall accompany the report as an attachment. Black Oxide Note Modification: 106 total pages require updates including table of contents. Potential note modifications below: -DO NOT APPLY BLACK OXIDE COATING TO COMPONENTS MANUFACTURED FROM " SS TYPE 303 OR 304" MATERIAL.</p><p>-BLACK OXIDE PROCESS SHALL NOT BE APPLIED TO "SS TYPE 303 OR 304“MATERIALS.</p><p>-NO BLACK OXIDE TREATMENT TO "SS TYPE 303 OR 304" MATERIALS. Locating Pins/Retainers: 9. 34 pages require updates. 10. 1, 1.1, 1.2, 4, 5, 6, 7, 8, 9, 10, 21, 22, 23, 24, 25, 26, 27, 41, 42, 45, 46, 47, 48, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, and 62. 7 pages have “discontinued” watermarks, but they are not noted on the table of contents. Pages 39, 40, 43, 44, 46, 48, and 49. L-Blocks: 32 pages require updates. 1, 1.1, 3, 5, 6, 8, 9, 10, 12, 13, 21, 23, 24, 26, 27, 28, 30, 31, 38, 40, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, and 53. N.C. Blocks 40 PAGES REQUIRE UPDATES. ALL PAGES EXCEPT FOR18, 20, 22, 25, 28 AND 30. Waltonen indicates approximately 11 hours to make changes.</p><p>Page 2 of 4 New Business:</p><p>10. P 5 G. Bode</p><p>Conclusion/Next Meeting: The next scheduled meeting shall - - 11. be held on March 05, 2014, at KUKA NAO - 6600 Center G. Bode Drive, Sterling Heights, Michigan, 48312</p><p>Page 3 of 4 Page 4 of 4</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us