Estimate Base on Function Points

Estimate Base on Function Points

<p> Estimate based on Lines of Code (LOC) Page 652</p><p>Function Estimated lines of Code</p><p>User Interface 2,300</p><p>Two Dimensional Analysis 5,300</p><p>Three Dimensional Analysis 6,800 . . . Total Lines of Code 33,200</p><p>Average Productivity 620 LOC/ person-month</p><p>Estimated Effort 33,200 / 620 = 54 pm Estimate base on Function Points</p><p>Assume: 24 input screens 16 reports 22 queries 4 internal files 2 external files Productivity is 6 FP/pm</p><p>Calculate Function points: Inputs = 24 x 4 = 96 Reports = 16 x 5 = 80 Queries = 22 x 4 = 88 Internal Files = 4 x 10 = 40 External Files = 2 x 7 = 14</p><p>Total Function Points = 318</p><p>Complexity Factors: Backup and Recovery 4 Data Communications 2 Distributed Processing 0 Performance Critical 4 Existing Operating Environment 3 On-line data Entry 4 Input Transaction/ multiple Screens 5 Master files updated on line 3 Information domain values complex 5 Internal processing complex 5 Code designed for reuse 4 Conversion/installation in design 3 Multiple installations 5 Application designed for change 5 TOTAL 52</p><p>Total Function Points = 318 x (.65 + .01 x 52) = 372</p><p>Estimated effort is 372 / 6.5 FP per month / = 57 person- months Process Based Estimation</p><p>Activity Planning Anal Des Code Test Total</p><p>10 Screens ? ? ? ? ?</p><p>8 Reports ? ? ? ? ?</p><p>4 Quereies ? ? ? ? ?</p><p>Internal DB ? ? ? ? ?</p><p>External DB ? ? ? ? ?</p><p>Totals ? ? ? ? ?</p><p>Estimate effort for each function by Framework Activity Empirical Estimation Models</p><p>Based on LOC/FP Results will vary widely Build your own based on experience!!</p><p>C E = A + B ( ev) Examples: E= 5.2 (KLOC)0.91</p><p>E = 3.2(KLOC)1.05 Assume: B = 0.16 P = 12,000</p><p>0.43 tmin = 8.14(LOC / P) t = 8.14 (33,200/12000)0.43 = 12.6 pm</p><p>E = 180Bt3</p><p>E = 180 x .28 x 1.053 = 58 pm Object Oriented Estimation</p><p>1. Count Use Cases.</p><p>2. Determine the number of Key Classes.</p><p>3. Categorize the interface type and develop a multiplier: No GUI 2.0 Text-based 2.25 GUI 2.5 Complex GUI 3.0</p><p>4. Multiply the number of Key Classes by the multiplier to determine Support Classes.</p><p>5. Multiply the total number of classes by the average number of work-units per class, e.g 20 person-days per class.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us