
<p>LCVAP Projects 2017/18</p><p>BRACKNELL</p><p>Binfield Temporary classroom Refurbs: Phase 2 Binfield Heating modifications St. Michael’s Easthampstead WC refurbishments St. Michael’s Sandhurst Electrical upgrade St. Michael’s Sandhurst Emergency floor repairs</p><p>BUCKS</p><p>Burnham St. Peter’s Asbestos removal Cadmore End Boiler replacement Frieth Electrical rewire/upgrade Hawridge and Cholesbury External area improvements Ibstone School expansion works: infant to primary Marlow Holy Trinity Roof replacement: Phase 2 Newton Longville Replacement windows St. Mary’s Amersham WC Refurbishments St. Paul’s Wooburn Electrical rewire</p><p>MILTON KEYNES</p><p>Bow Brickhill Drainage repairs Christ the Sower Emergency hot water heater replacement St. Mary and St. Giles (South site) Remodelling of entrance area (safeguarding)</p><p>OXFORDSHIRE</p><p>Chipping Norton, St. Mary’s WC/Cloakroom refurbishments Didcot All Saints Temporary classroom replacement Goring Asbestos removal Little Milton Temporary classroom replacement Oxford St. Barnabus Roofing/ceiling/refurbishment/asbestos removal Oxford St. Ebbe’s Boiler replacement Oxford St. Michael’s Roofing/ceiling refurbishment</p><p>READING</p><p>All Saints Infants Fire Risk assessment works New Christchurch Entrance extension (cont’d from 2106/17) New Christchurch Hall refurbishment St. Mary and All Saints Outdoor area works WEST BERKSHIRE</p><p>Brightwalton WC Refurbishments Bradfield Roofing works Enborne Electrical rewire/upgrade Englefield Classroom refurbishment Mortimer, St. Mary’s Replacement windows Newbury, St. John’s Fire Risk Assessment: Ph 2 works Stockcross Roofing repairs/asbestos encapsulation Sulhamstead Entrance works (safeguarding) Welford and Wickham Fencing (Safeguarding) Welford and Wickham Classroom refurbishments Woolhampton Boiler replacement</p><p>WINDSOR AND MAIDENHEAD</p><p>Cheapside External works Cheapside Boiler replacement Churchmead Humanities building refurbishment Churchmead Site Security Cookham Dean H&S works St. Edward’s Royal Free Middle WC Refurbs/legionella prevention works St. Edward’s Royal Free Middle DT Suite refurbishment St. Michael’s Sunninghill Emergency boiler replacement</p><p>WOKINGHAM</p><p>Grazeley Structural repairs Sonning Entrance works (cont’d from 2106/17) St. Peter’s Earley Fencing (safeguarding) St. Sebastian’s WC refurbishment</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-