LCVAP Projects 2017/18

LCVAP Projects 2017/18

<p>LCVAP Projects 2017/18</p><p>BRACKNELL</p><p>Binfield Temporary classroom Refurbs: Phase 2 Binfield Heating modifications St. Michael’s Easthampstead WC refurbishments St. Michael’s Sandhurst Electrical upgrade St. Michael’s Sandhurst Emergency floor repairs</p><p>BUCKS</p><p>Burnham St. Peter’s Asbestos removal Cadmore End Boiler replacement Frieth Electrical rewire/upgrade Hawridge and Cholesbury External area improvements Ibstone School expansion works: infant to primary Marlow Holy Trinity Roof replacement: Phase 2 Newton Longville Replacement windows St. Mary’s Amersham WC Refurbishments St. Paul’s Wooburn Electrical rewire</p><p>MILTON KEYNES</p><p>Bow Brickhill Drainage repairs Christ the Sower Emergency hot water heater replacement St. Mary and St. Giles (South site) Remodelling of entrance area (safeguarding)</p><p>OXFORDSHIRE</p><p>Chipping Norton, St. Mary’s WC/Cloakroom refurbishments Didcot All Saints Temporary classroom replacement Goring Asbestos removal Little Milton Temporary classroom replacement Oxford St. Barnabus Roofing/ceiling/refurbishment/asbestos removal Oxford St. Ebbe’s Boiler replacement Oxford St. Michael’s Roofing/ceiling refurbishment</p><p>READING</p><p>All Saints Infants Fire Risk assessment works New Christchurch Entrance extension (cont’d from 2106/17) New Christchurch Hall refurbishment St. Mary and All Saints Outdoor area works WEST BERKSHIRE</p><p>Brightwalton WC Refurbishments Bradfield Roofing works Enborne Electrical rewire/upgrade Englefield Classroom refurbishment Mortimer, St. Mary’s Replacement windows Newbury, St. John’s Fire Risk Assessment: Ph 2 works Stockcross Roofing repairs/asbestos encapsulation Sulhamstead Entrance works (safeguarding) Welford and Wickham Fencing (Safeguarding) Welford and Wickham Classroom refurbishments Woolhampton Boiler replacement</p><p>WINDSOR AND MAIDENHEAD</p><p>Cheapside External works Cheapside Boiler replacement Churchmead Humanities building refurbishment Churchmead Site Security Cookham Dean H&S works St. Edward’s Royal Free Middle WC Refurbs/legionella prevention works St. Edward’s Royal Free Middle DT Suite refurbishment St. Michael’s Sunninghill Emergency boiler replacement</p><p>WOKINGHAM</p><p>Grazeley Structural repairs Sonning Entrance works (cont’d from 2106/17) St. Peter’s Earley Fencing (safeguarding) St. Sebastian’s WC refurbishment</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us