LCVAP Projects 2017/18
Total Page:16
File Type:pdf, Size:1020Kb
LCVAP Projects 2017/18
BRACKNELL
Binfield Temporary classroom Refurbs: Phase 2 Binfield Heating modifications St. Michael’s Easthampstead WC refurbishments St. Michael’s Sandhurst Electrical upgrade St. Michael’s Sandhurst Emergency floor repairs
BUCKS
Burnham St. Peter’s Asbestos removal Cadmore End Boiler replacement Frieth Electrical rewire/upgrade Hawridge and Cholesbury External area improvements Ibstone School expansion works: infant to primary Marlow Holy Trinity Roof replacement: Phase 2 Newton Longville Replacement windows St. Mary’s Amersham WC Refurbishments St. Paul’s Wooburn Electrical rewire
MILTON KEYNES
Bow Brickhill Drainage repairs Christ the Sower Emergency hot water heater replacement St. Mary and St. Giles (South site) Remodelling of entrance area (safeguarding)
OXFORDSHIRE
Chipping Norton, St. Mary’s WC/Cloakroom refurbishments Didcot All Saints Temporary classroom replacement Goring Asbestos removal Little Milton Temporary classroom replacement Oxford St. Barnabus Roofing/ceiling/refurbishment/asbestos removal Oxford St. Ebbe’s Boiler replacement Oxford St. Michael’s Roofing/ceiling refurbishment
READING
All Saints Infants Fire Risk assessment works New Christchurch Entrance extension (cont’d from 2106/17) New Christchurch Hall refurbishment St. Mary and All Saints Outdoor area works WEST BERKSHIRE
Brightwalton WC Refurbishments Bradfield Roofing works Enborne Electrical rewire/upgrade Englefield Classroom refurbishment Mortimer, St. Mary’s Replacement windows Newbury, St. John’s Fire Risk Assessment: Ph 2 works Stockcross Roofing repairs/asbestos encapsulation Sulhamstead Entrance works (safeguarding) Welford and Wickham Fencing (Safeguarding) Welford and Wickham Classroom refurbishments Woolhampton Boiler replacement
WINDSOR AND MAIDENHEAD
Cheapside External works Cheapside Boiler replacement Churchmead Humanities building refurbishment Churchmead Site Security Cookham Dean H&S works St. Edward’s Royal Free Middle WC Refurbs/legionella prevention works St. Edward’s Royal Free Middle DT Suite refurbishment St. Michael’s Sunninghill Emergency boiler replacement
WOKINGHAM
Grazeley Structural repairs Sonning Entrance works (cont’d from 2106/17) St. Peter’s Earley Fencing (safeguarding) St. Sebastian’s WC refurbishment