<p>Deer Lake Ridge Renovations Lakehead University, Thunder Bay Campus</p><p>ADDENDUM #1</p><p>1.0 Additions</p><p>1. Replace rusted electric baseboard heaters, in the washrooms, as required; anticipated amount: ~10. Size and model to match existing.</p><p>2. Remove and dispose of existing range hoods. Install new, (Owner supplied): “Broan”, by Nutone, model #BP130HWN, in each kitchen. Quantity: 36.</p><p>2.0 Clarifications</p><p>1. The vinyl planks, by Kennedy Flooring has been upgraded with a thicker wear layer; now called Ultimo 2.0. The colour is the same, but renamed; “Casablanca Oak”, #24837.</p><p>2. The Time and Materials for supply and install plywood subfloor shall be an hourly labour wage; and a square foot cost for 1/2” plywood.</p><p>3. Rescheduled Site Visit: Monday, March 21, 2016, @ 1:30PM </p><p>Revised Bidding Period Timelines:</p><p>Last Question: Thursday, March 24, 2016</p><p>Last Addenda: Monday, March 28, 2016</p><p>Bids Due: Monday, April 4, 2016 </p><p>Project #T215-029 March 16, 2016 Page 1 of 1</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-