Steering Committee Agenda

Steering Committee Agenda

<p> Banner Student Information System</p><p>Steering Committee Agenda July 8, 2013</p><p>Time 3:30-4:30 p.m. Location KT G13 Agenda</p><p>1. Project status reports a. Project Schedule: A. Ohio Reciprocity (Frank Guzik, Patrick McLaughlin, Julie Litmer- Schwaller)  Residency Code Changes  Changes in Banner  Changes to processes  Changes in reporting B. Quarterly Oracle Critical Patches Testing Completed? Schedule move to PROD? (Julie Litmer-Schwaller) C. Moving of Banner PROD servers to Ginsburg – July 2013 (Julie Litmer- Schwaller) D. Evisions Upgrade (Julie Litmer-Schwaller) 1. Future Discussion items a. Degree Works Update (Nancy Leinbach & Julie Litmer-Schwaller) b. Clean Address Batch Process in PROD? (Julie Litmer-Schwaller) c. Sponsor Point Project - TouchNet/Banner Connect Upgrade (Pam Michalec & DBA) d. Oracle 11g Outstanding Issues List (Julie Litmer-Schwaller & DBA) e. Blackboard/Banner Real Time Integration – Spring/Summer Go-Live (Julie Litmer- Schwaller) f. Banner 9 – When? (Julie Litmer-Schwaler) g. Student Workers – Banner Security (Marvin Haugk & Frank Guzik) h. Password Expiration Channel (Julie Litmer-Schwaller) i. General Student Guest Level – How is it being used? (Patrick McLaughlin) j. BRIO Conversion (Kim DeLeon) Banner Student Information System</p><p>Steering Committee Agenda July 8, 2013</p><p> k. Clean Address Project (Julie Litmer-Schwaller and Jim Richardson)  P O Box list on Address Line 2 – This Postal Regulation  APT/STE/BLDG Number Displaying on Line 1 and Address on Line 2…needs one of these items designated.  Batch running monthly / Added to monthly operations calendar  Next Steps for INB, SSB, Tape Load Processes l. System Password Sync – TRNG all ID’s and SHDW (Julie Litmer-Schwaller) m. Banner Student Upgrade 8.4 – Open Problems (Julie Litmer-Schwaller)  Transfer Credit Group Issue  Active Assignment Link in Faculty Dashboard  CAPP Issues (Rules, display of apostrophe, etc.)  Grade Roll issue with SHADEGR. n. dotCMS update (Terry Coonan) o. Windows 7 – Update on ODBC connection and BRIO (Kim De Leon) p. Paper Cut interface with Touchnet (Julie Litmer-Schwaller) q. AY Term for Accelerated MBA Program Update (Julie Litmer-Schwaller) r. dotCMS and the Banner Web Site s. Netmail Removal – Student Look-up Screen/Confidentiality Setting Changes (Julie Litmer-Schwaller) t. International Student Services Data Changes – Date to have reports changed (Julie Litmer-Schwaller) u. User Modernization: Banner Self-Service Webinar & FAQ v. Employee IDM Status (Julie Litmer-Schwaller) 2. General Information a. PPRD System – Like PROD Last Refresh date: 06/18/2013 b. TRNG System – Like PROD Last Refresh date: 06/26/2013 c. DEVL System – Like PROD. Banner Student Information System</p><p>Steering Committee Agenda July 8, 2013</p><p>Last Refresh date: 10/21/2012 d. SHDW System – Like PROD on Census Spring 2013 Last Refresh date: 01/17/2013 e. DEV2 System – Is not currently functional per Jim Richardson</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us