Cal-PCA Requirements Development Workshop s1

Cal-PCA Requirements Development Workshop s1

<p>Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>1. The (worker) shall be provided with the capability to access the content of Mandatory a template/form.</p><p>2. The (worker) shall be provided with the capability to change the content of Mandatory a template/form.</p><p>3. The (worker) shall be provided with the capability to remove content from Mandatory a template/form.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 1 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>4. The proposed solution should minimize impact to field office staff and Mandatory external system users.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 2 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>5. Bidder must comply with Certification of Facility Readiness guidelines as Mandatory follows: The department will install all cabling and electrical. The department will provide outlets and utility services as required by the contractor provided equipment specification. Contractor must supply utility and all cabling requirements with the amperage, BTUs, weight and dimensions of each piece of equipment. All equipment must be able to be accommodated within the existing (department) building, room, office, and not require any major modifications to the existing department infrastructure (i.e. walls, floors, ceilings, environmental controls, etc.). The Bidder must check “Yes” on the matrix indicating compliance, or “No” on the matrix indicating non-compliance with the requirement.</p><p>Accuracy Clarity Complete Weaknesses: Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 3 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>6. The system shall provide business decision support tools. Desirable</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 4 of 4</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us