![Cal-PCA Requirements Development Workshop s1](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
<p>Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>1. The (worker) shall be provided with the capability to access the content of Mandatory a template/form.</p><p>2. The (worker) shall be provided with the capability to change the content of Mandatory a template/form.</p><p>3. The (worker) shall be provided with the capability to remove content from Mandatory a template/form.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 1 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>4. The proposed solution should minimize impact to field office staff and Mandatory external system users.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 2 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>5. Bidder must comply with Certification of Facility Readiness guidelines as Mandatory follows: The department will install all cabling and electrical. The department will provide outlets and utility services as required by the contractor provided equipment specification. Contractor must supply utility and all cabling requirements with the amperage, BTUs, weight and dimensions of each piece of equipment. All equipment must be able to be accommodated within the existing (department) building, room, office, and not require any major modifications to the existing department infrastructure (i.e. walls, floors, ceilings, environmental controls, etc.). The Bidder must check “Yes” on the matrix indicating compliance, or “No” on the matrix indicating non-compliance with the requirement.</p><p>Accuracy Clarity Complete Weaknesses: Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 3 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 6</p><p>No. Requirement Description Priority</p><p>6. The system shall provide business decision support tools. Desirable</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 4 of 4</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-