
Hydromega Services Inc. Detailed Impact Analysis Report - DRAFT For Trenton Lock 1 Hydro Project H351681-00000-121-066-0003 Rev. 0 February 5, 2018 This document contains confidential information intended only for the person(s) to whom it is addressed. The information in this document may not be disclosed to, or used by, any other person without Hatch's prior written consent. Hydromega Services Inc. Detailed Impact Analysis Report - DRAFT For Trenton Lock 1 Hydro Project H351681-00000-121-066-0003 Rev. 0 February 5, 2018 This document contains confidential information intended only for the person(s) to whom it is addressed. The information in this document may not be disclosed to, or used by, any other person without Hatch's prior written consent. Trenton Lock 1 Hydro LP Project Management Report Trenton Lock 1 Hydro Project Environment Sustainability and Community Interface Management H351681 Detailed Impact Analysis Report - DRAFT Report Detailed Impact Analysis Report - DRAFT H351681-00000-121-066-0003 C. Coughlin, M. Approved Esraelian, C. Sehl, J. 2018-02-05 0 T. Clarke K. Vukovics for Use Villella, K. Wilson, P. Snable, K. Vukovics DATE REV. STATUS PREPARED BY CHECKED BY APPROVED BY Discipline Lead Functional Manager H351681-00000-121-066-0003, Rev. 0, Ver: 04.03 © Hatch 2018 All rights reserved, including all rights relating to the use of this document or its contents. Trenton Lock 1 Hydro LP Project Management Report Trenton Lock 1 Hydro Project Environment Sustainability and Community Interface Management H351681 Detailed Impact Analysis Report - DRAFT IMPORTANT NOTICE TO READER This report was prepared by Hatch Ltd. (“Hatch”) for the sole and exclusive use of Hydromega Services Inc. (the “Client”) for the purpose of assisting the Client in making decisions with respect to the Environmental Services for the Trenton Lock 1 Hydro Project (the “Project”). Hatch acknowledges that this report may be provided to third parties provided that all such parties shall rely upon this report at their own risk and shall (by virtue of their receipt of the report) be deemed to have (a) acknowledged that Hatch shall not have any liability to any party other than the Client in respect of the report and (b) waived and released Hatch from any liability in connection with the report. This report contains the expression of the opinion of Hatch using its professional judgment and reasonable care based on information available and conditions existing at the time of preparation. The use of or reliance upon this report is subject to the following: • The report being read as a whole, with sections or parts hereof read or relied upon in context; • The conditions of the site may change over time (or may have already changed) due to natural forces or human intervention, and Hatch takes no responsibility for the impact that such changes may have on the accuracy or validity of the observations, conclusions and recommendations set out in this report; and • The report is based on information made available to Hatch by the Client or by certain third parties; and unless stated otherwise in the Agreement, Hatch has not verified the accuracy, completeness or validity of such information, makes no representation regarding its accuracy and hereby disclaims any liability in connection therewith. H351681-00000-121-066-0003, Rev. 0, Page i Ver: 04.03 © Hatch 2018 All rights reserved, including all rights relating to the use of this document or its contents. Trenton Lock 1 Hydro LP Project Management Report Trenton Lock 1 Hydro Project Environment Sustainability and Community Interface Management H351681 Detailed Impact Analysis Report - DRAFT Table of Contents 1. Introduction ........................................................................................................................................ 1-1 1.1 Organization of Report ............................................................................................................... 1-1 1.2 Project Rationale ........................................................................................................................ 1-3 1.3 Project Title and Location .......................................................................................................... 1-3 1.3.1 Project Title ................................................................................................................... 1-3 1.3.2 Project Location ............................................................................................................ 1-3 1.4 Proponent Information ............................................................................................................... 1-4 1.5 First Nation Participation ............................................................................................................ 1-4 1.6 Proposed Project Dates ............................................................................................................. 1-4 1.7 Project Description ..................................................................................................................... 1-5 1.7.1 Project Elements ........................................................................................................... 1-5 1.7.2 Project Construction ..................................................................................................... 1-8 1.7.3 Project Operation ........................................................................................................ 1-14 2. Assessment Methodology and Identification of Valued Ecosystem Components .................... 2-1 2.1 Assessment Methodology .......................................................................................................... 2-1 2.1.1 Significance of Residual Effects ................................................................................... 2-3 2.2 Project and Study Areas ............................................................................................................ 2-4 2.2.1 Project Area .................................................................................................................. 2-4 2.2.2 Study Area .................................................................................................................... 2-5 2.3 Valued Ecosystem Components ................................................................................................ 2-6 2.4 Legal Framework ..................................................................................................................... 2-15 2.5 Applicable Standards ............................................................................................................... 2-16 2.5.1 Environmental Standards and Guidelines Document – Ontario Waterways, July 2017 ............................................................................................................................ 2-16 2.5.2 Parks Canada Cultural Resource Management (CRM) Policy, 2013 ........................ 2-16 2.5.3 Canada’s Historic Places: Standards and Guidelines for the Conservation of Historic Places in Canada – A Federal, Provincial and Territorial Collaboration, 2010 ............................................................................................................................ 2-17 2.5.4 Directive for Dam Safety Program of Parks Canada Dams and Water-Retaining Structures, 2009 ......................................................................................................... 2-17 2.5.5 PCA’s Rideau Canal and Trent Severn Waterway National Historic Sites of Canada: Policies for In-Water and Shoreline Works and Related Activities, 2007 ............................................................................................................................ 2-17 2.5.6 Trent-Severn Waterway National Historic Site of Canada Management Plan, 2000 ............................................................................................................................ 2-17 2.5.7 Reference Guide on Physical and Cultural Heritage Resources, CEAA (1996) ........ 2-17 2.5.8 Parks Canada Guiding Principles and Operational Policies, 1994 ............................ 2-18 2.5.9 PCA Operational and Design Criteria 2014 ................................................................ 2-18 3. Engagement ....................................................................................................................................... 3-1 3.1 Federal and Provincial Engagement Requirements .................................................................. 3-1 3.1.1 Federal Requirements .................................................................................................. 3-1 H351681-00000-121-066-0003, Rev. 0, Page ii Ver: 04.03 © Hatch 2018 All rights reserved, including all rights relating to the use of this document or its contents. Trenton Lock 1 Hydro LP Project Management Report Trenton Lock 1 Hydro Project Environment Sustainability and Community Interface Management H351681 Detailed Impact Analysis Report - DRAFT 3.2 Stakeholder List ......................................................................................................................... 3-2 3.3 Timing for Engagement ............................................................................................................. 3-3 3.3.1 Engagement during the IESO’s LRP Process .............................................................. 3-3 3.3.2 Engagement during the DIA Process ..........................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages329 Page
-
File Size-