Air Commodore Rob Woods OBE Chief of Staff (Air), Defence Equipment & Support Royal Air Force the Team…

Air Commodore Rob Woods OBE Chief of Staff (Air), Defence Equipment & Support Royal Air Force the Team…

<p><strong>A Warfighters View: Weapon System Availability – A Collaborative Challenge </strong></p><p>Air Commodore Rob Woods OBE </p><p><strong>Chief of Staff (Air)</strong>, <strong>Defence Equipment &amp; Support </strong><br><strong>Royal Air Force </strong></p><p>The Team….. </p><p>Mr Richard Hamilton <br>BAE Systems plc </p><p>Air Cdre Rob Woods <br>MoD DE&amp;S </p><p>Mr Geraint Spearing <br>MoD DECA </p><p>Gp Capt Simon Vicary <br>MoD DE&amp;S </p><p>Mr Ian Cole MoD DECA </p><p>Mr Ian Manley <br>MoD DE&amp;S </p><p>UK Defence Equipment &amp; Support (DE&amp;S) </p><p><strong>“To equip and support our Armed Forces for operations now and in the future” </strong></p><p>DE&amp;S’s Role </p><p>• Procure &amp; support equipment, through life, for UK’s Armed Forces for both current &amp; future operations </p><p>• MOD’s lead department for commercial activities </p><p>• Manage relationships with MOD, the Front Line &amp; Industry </p><p><em>DE&amp;S HQ, MOD Abbey Wood, Bristol, UK </em></p><p>DE&amp;S Budget to Spend 2019/20 </p><p>• £10.8 Billion Core Spend: <br>− £5.4 Billion for Purchase of New <br>Equipment </p><p>− £5.4 Billion for Equipment <br>Support </p><p>• £3.9 Billion budget for Air Domain, 56% of which for Support </p><p>Air Domain Portfolio </p><p><strong>Backdrop for Transformation in Support: 2000-05 </strong></p><p>• Strategic Defence Review 1998 <br>–Smart Acquisition <br>•Similar lessons learnt over multiple operations; urgent need to improve </p><p>• DLO Strategy <br>•Increasing demand for UK military </p><p>capability across the globe <br>–20% Savings &amp; ‘Transformation </p><p>Staircase’ <br>•Nature of operations changed </p><p>•Need to find efficiencies <br>• Air &amp; Land End-to-End Review • Defence White Paper 2004 • Government Efficiency Review 2004 • Formation of DE&amp;S <br>– Preserve current &amp; future capability </p><p><strong>End-2-End Review of Air &amp; Land Logistics - 2003 </strong></p><p><strong>• Simplified&nbsp;lines &amp; levels of support </strong></p><p>- From 4 x Lines of Maintenance to 2 x Levels:&nbsp;Forward &amp; Depth </p><p>• <strong>Creation of Depth Support Hubs for platforms </strong></p><p>- Tornado @ Marham and Harrier @ Cottesmore </p><p>• <strong>‘Contracting for Availability’ </strong></p><p>- Tornado Future Support - ATTAC Phase 1 &amp; ROCET </p><p><strong>• Reliable&nbsp;&amp; consistent supply chain </strong></p><p>- Reduced in-theatre delivery Op TELIC from 4-7 to 1-2 days; in <br>NW Europe from 28 to 7 days </p><p>• <strong>Application of ‘Lean’ techniques </strong></p><p><strong>- </strong>Training &amp; migration to Continual Improvement </p><p><strong>National Audit Office Report - Jul 2007 </strong></p><p>‘Transforming Logistics Support for Fast Jets’ </p><p>“The Department made significant reductions in the cost of support to fast jets; the Tornado and Harrier Project Teams’ costs reduced from total of £711M in 2001-02 to £328M in 2006-07, </p><p><strong>providing cumulative savings of some £1.4Bn over the 6-year period</strong>.” </p><p>“The Department has continued to achieve broadly the same level of performance in terms of flying hours throughout the transformation. On&nbsp;this basis, the Department’s <strong>transformation of </strong></p><p><strong>logistics support represents good value for money </strong>to date </p><p>…although there are risks…” </p><p><strong>2003-11: Air Efficiency – Target v Achievement </strong></p><p>£M <br>500 <br>Achieved <br>400 </p><p>Target <br>300 <br>DLO/ </p><p>DE&amp;S <br>200 </p><p>100 <br>Front Line </p><p>2003/04 </p><ul style="display: flex;"><li style="flex:1">04/05 </li><li style="flex:1">05/06 </li><li style="flex:1">06/07 </li><li style="flex:1">07/08 </li><li style="flex:1">10/11 </li></ul><p></p><p>•</p><p>11 </p><p><strong>The UK’s Support Transformation Staircase </strong></p><p><strong>Today’s Support Solutions </strong></p><p>• Relationship between DE&amp;S and Industry largely stabilized; ‘post- <br>Levene’ relationship between DE&amp;S and Air Cmd still in work </p><p>• Have developed areas where analysis of Perspectives 1 &amp; 2 match, and increasingly tailored contracts on proven ‘good practice’: </p><p>– Governance is key: Programme Boards now regularly making tough decisions; SDSR <br>2015 provided real opportunities to grow capability </p><p>– CEO DE&amp;S has driven the ‘S’ back in DE&amp;S – Set requirements early on - focus on teamwork, transparency &amp; trust between SROs &amp; <br>DE&amp;S Delivery Teams </p><p>– Coherence in Deployed Space, and greater emphasis on Safety </p><p><strong>Continuing Efficiencies Realised in Support </strong></p><p><strong>Attack Helicopter </strong></p><p><strong>IOS: 21% savings over 5 years - Dec 14 </strong><br><strong>Hercules IOS: 17% savings over 6 years - Dec 15 </strong></p><p><strong>ATTAC: 18% savings to Out of Service - Jul 16 </strong><br><strong>Merlin IOS: 20% savings over 5 years - Apr 15 </strong></p><p><strong>Chinook TLCS: </strong></p><p><strong>23% savings over 5 years - Jan 15 </strong><br><strong>Hawk Support: 8% savings over 4 years - Mar 16 </strong></p><p><strong>TyTAN Launch - July 2016 </strong></p><p><strong>An Industry View: Weapon System Availability – A Collaborative Challenge </strong></p><p>Mr Richard Hamilton </p><p>Manufacturing &amp; Support Director, <strong>BAE Systems plc </strong></p><p><strong>Typhoon Total Availability Enterprise (TyTAN</strong>) </p><p>•</p><p>10-year deal for all aspects of Typhoon operational support </p><p>– Brings together several legacy contracts into one arrangement </p><p>– 10 year framework allows industry to make long term investments to optimise support </p><p>••</p><p>Target price 38% lower than previous arrangements <br>– Unachieveable through “business as usual” negotiation with single-source supplier </p><p>Reinvestment of support savings directly in platform capability development </p><p><strong>The Challenge </strong></p><p><strong>For the UK MOD </strong></p><p><strong>SAVE MORE </strong></p><p>• Funding stream for UK Typhoon Support insufficient </p><p><strong>Reduce Operating Costs </strong></p><p>based on current run rates <br>• Tornado Out of Service Date driving required Typhoon </p><p>Capability Enhancements <br>• Operational commitments driving need for improvements </p><p>to how Typhoon is operated in the UK Fleet </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>DELIVERMORE </strong></li><li style="flex:1"><strong>SPENDMORE </strong></li></ul><p></p><p><strong>Increase Competitive Advance </strong><br><strong>Reinvest Savings in Capacity </strong></p><p><strong>For BAE Systems </strong></p><p>• Driving recurring support costs down will allow recycling of c.£0.5bn into capability programmes </p><p><strong>Enhance Typhoon Product </strong></p><p>• Enhanced operational effectiveness of the Typhoon weapon system to support UK RAF requirements <br>• Typhoon Export sales dependent upon cost efficiencies being </p><p>realised </p><p><strong>DO MORE </strong></p><p><strong>TyTAN – A Step Change in Typhoon Support – Joint Plan </strong></p><p>•</p><p>Agreement signed Jul 2016 <br>Replaced existing multiple support contracts with a single output-based availability service Jointly developed by BAE Systems and MoD under Future Support Operating Model project during 2015/16 </p><p>••</p><p>Delivers flying hours, simulator availability and pilot training in support of the Typhoon Force Command Plan Transformation programme a critical enabler <br>Enterprise “One Team” integrated approach to ensure success ‘Enablers’ are multi-organisational in nature Investment of cash; energy and leadership </p><p><strong>TyTAN Features &amp; Performance Management </strong></p><p>••</p><p>Highly integrated enterprise approach (BAES/RAF/DE&amp;S) </p><p>Only one main Performance Indicator - Pay Per Flying Hour </p><p><strong>FLYING HOURS </strong><br><strong>NON-FLYING SERVICES </strong></p><p>– Simple measure that is used to drive delivery and behaviour </p><p>– Other indicators used for management information only </p><p><strong>COST </strong><br><strong>RESILIENCE </strong></p><p>•</p><p>“Key Resilience Indicators” act as safety net to protect military output and operational flexibility </p><p><strong>CONTROL </strong></p><p>– e.g. Bank&nbsp;of Hours, Inventory health </p><p><strong>TyTAN - Performance Management </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Payment </strong></li><li style="flex:1"><strong>Governance </strong></li></ul><p></p><p>• Flying HourAchievement <br>•KPI 1 - Training andMission </p><p>Support •KPI 2 - Airworthiness &amp;Safety •European OPMI </p><p><strong>Non-flying </strong><br><strong>Flying </strong></p><p><strong>Services </strong><br><strong>Hours </strong></p><p><strong>Deliver... </strong></p><p><strong>One </strong><br><strong>Enterprise </strong></p><p><strong>Whilst ensuring... </strong></p><p><strong>Cost Control </strong><br><strong>Resilience </strong></p><p><strong>Key Resilience </strong><br><strong>Transformation </strong></p><p><strong>Indicators </strong></p><p>• Continuous Improvement </p><ul style="display: flex;"><li style="flex:1">• Recycling for capability </li><li style="flex:1">• KRI 1 - Flying HourResilience </li></ul><p>• KRI 2 - Supply Chain Resilience • KRI 3 - Safety &amp; Availability </p><p>Modifications Embodiment </p><p><strong>Typhoon Total Availability Enterprise (TyTAN</strong>) </p><p>• 10 year, Output Based contract with Price Per Flying Hour (PPFH) <br>• 40% Savings reinvested into future capability • Output based services (Flying Hours and </p><p>Simulator Availability) <br>• Avionics provider (Leonardo) fully integrated into the Joint Avionics Service&nbsp;(JAS) <br>• Long term deal providing better incentives for Transformation <br>• Operates as a single Enterprise (BAES, RAF and DE&amp;S) </p><p><strong>Enterprise Enablers </strong></p><p>25 </p><p><strong>Enterprise Leadership </strong></p><p><strong>TyTAN RSO </strong></p><p>Typhoon Force Commander Air Cdre Mark Chappell </p><p>••<br>FH achieved Recycling for capability </p><p><strong>No 1 Group Delivery Lead </strong></p><p><strong>DE&amp;S </strong></p><p><strong>Delivery Lead </strong><br><strong>BAE Systems Delivery Lead </strong></p><p>UK Support (TyTAN) Delivery <br>Director <br>Deputy Force Commander </p><p>Gp Capt Jez Milne <br>Deputy Head FAST – CapSust <br>Ian Manley <br>Alison Ballard </p><p>•••<br>CP &amp; IYDP Transformation Fly the Plan <br>•••<br>Contract Management European interfaces Strategic Support Planning <br>•••<br>Service delivery Transformation Cost reduction </p><p><strong>Relentless focus on: </strong></p><p><em>Doing the right thing, at the right time, in the right place </em><br><em>Driving out/avoiding waste Delivering the Command Plan </em></p><p>26 </p><p><strong>Joint Governance Structure </strong></p><p><strong>6-monthly </strong></p><p><strong>2-Star </strong><br><strong>TyTAN Review </strong></p><p><strong>TyTAN Senior </strong><br><strong>Perfomance Review &amp; </strong><br><strong>Quad </strong></p><p><strong>Monthly with every 3rd meeting being&nbsp;1* Quad </strong></p><p><strong>Enterprise Operation and Transformation </strong><br><strong>Review </strong></p><p><strong>Monthly Monthly </strong></p><p><strong>Enterprise Strategic Planning Cell </strong><br><strong>Review </strong><br><strong>Operation </strong><br><strong>TyTAN Change </strong></p><p><strong>Review Board </strong><br><strong>Fin/Comm </strong><br><strong>Performance </strong></p><p><strong>Review </strong><br><strong>Working Group </strong><br><strong>Blue Box - Reviews - Service Delivery Team Leads </strong></p><p>27 </p><p><strong>Transformation Cultural Change – The Challenge </strong></p><p>Changing legacy cultures and behaviours key to TyTAN’s success </p><p>Three dimensions of change; <br>BAE Systems – DE&amp;S – Air Command BAE Systems Front Office vs Back Office European Collaboration </p><p>Requires all teams to be focused on the priorities of the solution; <br>Flying Hour &amp; Pilot competency Maintaining Airworthiness Achieving Transformation &amp; Efficiency Enabling Recycling for Capability </p><p><strong>From Customer / Supplier to Partnering to Enterprise </strong></p><p>28 </p><p><strong>TyTAN – What have we learnt? </strong></p><p>•</p><p>••</p><p>Early alignment of objectives (around operational output) is crucial </p><p>Re-investment of support savings is a powerful incentive to all </p><p>Trust takes time to build; transformation and cultural change is a c5 year process; long term security is needed to enable investment </p><p><strong>Relentless focus on: </strong></p><p><strong>Doing the right thing, at the right time, in the </strong></p><p><strong>right place, with the right behaviours </strong></p><p>•••</p><p>Customer has to change too and work in a highly integrated way with industry for the common good </p><p><strong>Driving out / avoiding waste </strong></p><p>Leadership demonstration of changed behaviours essential </p><p><strong>Delivering the Operational Output </strong></p><p>All parties need a mature understanding of each other's business, motivations and cost drivers </p><p>29 </p><p><strong>Conclusions &amp; Future Relationships </strong></p><p>• Identify good practice inter-organizationally &amp; adopt it • DE&amp;S and Industry will continue working together: trust achieved through shared values - ‘win-win criteria’ - clear contracted responsibilities &amp; open communications </p><p>• Innovation &amp; coherence - together </p><p>• Consider intelligent support on future Foreign Military Sale platforms • Remain flexible - resources likely to need further balancing • Make Plan A work; reflect that perhaps there never was a Plan B… </p><p><strong>“The Snowplough Test” </strong></p><p><strong>Question. Who&nbsp;gets the snowplough out in the morning ? Answer. It’s&nbsp;now our industry partner because…… </strong></p><p><strong>……..it’s in their interest for us to fly! </strong></p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us