Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Name of the Project: Rajiv Gandhi InfoTech Park Phase II, Hinjewadii, Pune- 411 057. Location / site alternatives under consideration: Plot No. 31, Rajiv Gandhi InfoTech Park Hinjewadi, MIDC Phase II, Pune 411057 Size of the Project: * Total Plot Area -- 1, 99,934.05 sqm. Build up Area (cleared) – 1, 18,933.36 sqm Expansion Build up area (clearance to be obtained) –1,20,949 sqm Expected cost of the project: 280 Crores. Contact Information: Mr.Regu Raman Manager- Civil Projects Wipro Ltd. Special economic zone Plot No. 31, Rajiv Gandhi InfoTech Park Hinjewadi, Phase II, Pune 411057 -------------------------------------------------------------------------------------------------------------1 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. Screening Category: Building Construction Project 8(a) Category B2:> equal to 20,000 Sq.m.< equal to 1,50,000 Sqm. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No No Change in Land use. in land use, land cover or Setting up of Sector Specific SEZ topography including increase in approval Letter enclosed. intensity of land use (with Annexure: 3 respect to local land use plan). 1.2 Clearance of existing land, Yes This is an expansion project. -------------------------------------------------------------------------------------------------------------2 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. vegetation Clearance already obtained for and buildings? existing buildings on the plot. 1.3 Creation of new land uses? No NA 1.4 Pre-construction investigations Yes Soil Testing Report. e.g. bore houses, soil testing? Annexure 8 1.5 Construction works? Yes 1,20949 sq.m. 1.6 Demolition works? No NA 1.7 Temporary sites used for Yes Labor camp will be provided for 300 construction Works Or housing of Workers working within Construction construction site. Temporary sheds provided for workers? their residential purpose, drinking water facility provided to them. Water for the drinking and domestic purpose will be provided through tankers. Toilet block consisting of 20 toilets will be provided with Septic tank and soak pit. 1.8 Above ground buildings, Yes Excavated material during structures or earthworks including construction will be used to filling in linear structures, low-lying area within construction cut and fill or excavations site. 1.9 Underground works including No NA mining or tunneling? 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No NA -------------------------------------------------------------------------------------------------------------3 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. 1.13 Production and manufacturing No NA Processes? 1.14 Facilities for storage of goods or Yes Materials related to construction are materials? having temporary arrangement for storage within construction site. 1.15 Facilities for treatment or Yes a) During Construction disposal of solid waste or liquid phase: effluents? Construction debris will be used to backfilling of low-lying area within construction site. Solid waste that will be generated from construction workers working within site will be dispose through Municipal waste bins. Septic tank and soak pit will be providing for proper dispose of liquid effluent. b) During Operation Phase: (I) Solid waste: ( for expansion ) Total Quantity = 3011.1Kg/day a) Biodegradable Solid Waste = 1204.4 kg/day (Additional 50 Kg/day shall be accounted by trees, plantation and landscape trimming.) -------------------------------------------------------------------------------------------------------------4 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. = 1254.4 Kg/day b) Dry waste = 1806.6 kg/day Biodegradable and Non- biodegradable waste will be segregated. Dry waste will be sent for recycling and ‘In Vessel Process’ will treat wet waste for composting. (II) Liquid effluent will be treated in Sewage treatment Plant will having capacity = 600 KLD Schematic diagram of STP: Annexure- 11 1.16 Facilities for long term housing of No NA operational workers? 1.17 New road, rail or sea traffic No NA during construction or operation? 1.18 New road, rail, air waterborne or No NA other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No NA transport routes or infrastructure leading to changes in traffic movements? -------------------------------------------------------------------------------------------------------------5 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. 1.20 New or diverted transmission No NA lines or pipelines? 1.21 Impoundment, damming, No NA culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No NA 1.23 Abstraction or transfers of water No To accomplish water requirement of form ground or surface waters? workers working within construction site for their domestic use will be available from Tankers. During operation the water shall be utilized for domestic and flushing purpose. Water shall be subjected to treatment if the need arises. 1.24 Changes in water bodies or the No NA land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes During Construction Phase: Only materials for construction, Material Transport. operation or decommissioning? Approximately 3 Tractors/day 2 Trucks/day During Operation Phase: Vehicular circulation of the workers which will be employed within this complex. 1.26 Long-term dismantling or No NA decommissioning or restoration -------------------------------------------------------------------------------------------------------------6 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. works? 1.27 Ongoing activity during No NA decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Influx of People during either temporarily or Construction Phase: permanently? : 400- 450 workers. Influx of People during Operational Phase: Total 21,807 persons will be working. For expansion buildings population is 10,037. Clearance already obtained for buildings with population 11,770. 1.29 Introduction of alien species? No NA 1.30 Loss of native species or genetic No NA diversity? 1.31 Any other actions? No NA 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) Sr.No. Information/checklist confirmation Yes/No Details thereof (with -------------------------------------------------------------------------------------------------------------7 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes It’s an expansion project, agricultural land (ha) construction on Undeveloped land. 2.2 Water (expected source & competing Yes During Construction: users) unit: KLD Source: Tankers Water requirement=125 KLD. During Operation: Total Water requirement: (For Domestic, Flushing and irrigation) Total: 1046 KLD Total domestic water Requirement: 710 KLD Landscape : 96 KLD Total Reused Water = 568 KLD say 570 Air conditioning system = 240 KLD ( 120 KLD fresh & 120 KLD recycled) Source: MIDC, Treated Sewage, water from RWH. 2.3 Minerals (MT) No NA 2.4 Construction material: stone, Yes Companies authorized aggregates, and / soil approval local vendors. (expected source – MT) -------------------------------------------------------------------------------------------------------------8 Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057. 2.5 Forests and timber (source – MT) No NA 2.6 Energy including electricity and fuels Yes Source: MSEB (source, competing users) Unit: fuel During Construction: (MT), energy (MW) 450 KVA Approx. DG Sets: 125 KVA, 3 SETS. 75 KVA MSEB Connection During Operation: 8399 KVA Approx. Nos. of D.G.Sets: 1500 KVA , 6 Sets Fuel Requirement : HSD 250 lit/hr 2.7 Any other natural resources (use No - appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of -------------------------------------------------------------------------------------------------------------9 Form I & IA for Expansion
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages69 Page
-
File Size-