SCM Projects

SCM Projects

Annex 3 ‐ List of projects Scandinavian‐Mediterranean Corridor ‐ sorted by Country and Mode ‐ Final Report CEF pre‐ Transport Studies or Costs Critical ID Location Description of project Project promoter Timing Financing sources identified mode works (MEUR) issue section Ring Rail Line : A two‐track urban line for passenger traffic to Helsinki Airport. It will have an 8‐kilometre FI 1 Rail Helsinki Works Finnish Transport Agency 2009‐2015 736 Public funds and other sources. X X tunnel with two tubes, 5 surface stations in the first phase out of wich 2‐3 underground stations Finnish Transport Agency, FI 2a Rail Helsinki Study & works Central Pasila and metro: Center‐Pasila new railway line 2014‐2017 40 Public funds and possible EU Co‐funding (CEF) X cities of Helsinki and Espoo Finnish Transport Agency, FI 2b Rail Helsinki Study & works Helsinki marshalling yard: Improvement of Helsinki marshaling yard (60 M€) 2015‐2020 60 Public funds and possible EU Co‐funding (CEF) X cities of Helsinki and Espoo Finnish Transport Agency, FI 2c Rail Helsinki Study & works Helsinki interlocking system: Updating of the Helsinki interlocking system 2020‐2025 90 Public funds and possible EU Co‐funding (CEF) X cities of Helsinki and Espoo City Rail Loop : New railway to connect Helsinki Airport with rail (1st phase Ring Rail to be completed in 2015). Finnish Transport Agency, city FI 3 Rail Helsinki Study & works 2014‐2020 1.000 Public funds and possible EU Co‐funding (CEF) X X City Rail Loop also improves the connection between the two CNCs that cross in the Helsinki node. of Helsinki Espoo urban railway : Extension of Espoo urban rail to remove a major bottleneck between two CNCs in the Finnish Transport Agency, city FI 4 Rail Espoo Study & works 290 Public funds and possible EU Co‐funding (CEF) X Helsinki urban node. of Espoo Repairs of areas with ground frost damage and soft soils on main railway lines : Ground frost damage will be FI 5 Rail Nationwide Study & works repaired at the most critical sites, for example by building supporting embankments, by stabilisation and Finnish Transport Agency 2014‐2019 Public funds and possible EU Co‐funding (CEF) X constructing retaining steel walls beside the track. Rail Joker Line: Rail Joker Line 1st phase in a three‐phase project to connect east‐west urban rail to long‐ Helsinki Regional Transport, FI 6 Rail Helsinki Study & works distance rail, Helsinki airport and port. Improves the connection between the two CNCs that cross in the 2018‐2020 300 Public funds and possible EU Co‐funding (CEF) X X municipalities Helsinki node. Helsinki Regional Transport, Airport line: Airport Line. A tunnel to connect long distance trains from north, west and east to airport and city FI 7 Rail Helsinki Study & works city of Helsinki, Transport 1.000 Public funds and possible EU Co‐funding (CEF) X X centre. Agency FI 7 a Rail Helsinki ‐ Turku Study & works Railway yards improvement: Improvement of the railway yards on the section Turku ‐ Helsinki ‐ Vainikkala Finnish Transport Agency 2014‐2030 200 Public funds and possible EU Co‐funding (CEF) X x FI 7 b Rail Luumäki ‐ Vainikkala Study & works Additional (2nd) track: Additional (2nd) track on the section Luumäki ‐ Vainikkala Finnish Transport Agency 250 Public funds and possible EU Co‐funding (CEF) X x FI 8a Rail Helsinki ‐ Turku Study & works Improvement of the section Espoo ‐ Karjaa: Improvement of the section Espoo ‐ Karjaa Finnish Transport Agency 150 Public funds and possible EU Co‐funding (CEF) X x FI 8b Rail Helsinki ‐ Turku Study & works Improvement of the section Salo ‐ Turku: Improvement of the section Salo ‐ Turku Finnish Transport Agency 200 Public funds and possible EU Co‐funding (CEF) X x Espoo ‐ Lohja ‐ Salo railway: New shortcut railway Espoo‐Lohja‐Salo in Helsinki‐Turku section; cost estimated FI 8c Rail Helsinki ‐ Turku Study & works Finnish Transport Agency 1.500 Public funds and possible EU Co‐funding (CEF) X X between 1400 and 1500 million Euro [higher value included in the cost column] Helsinki ‐ Turku ‐ Helsinki ‐ Turku ‐ Tampere triangle: Investigation into the transport system of Helsinki – Tampere – Turku FI 9 Rail Study Regional Councils 1.500 Public funds and possible EU Co‐funding (CEF) X x Tampere economic triangle. Improvement of service level on railway section Kouvola – Kotka/Hamina: Several improvement measures for FI 10 Rail + Road Kouvola ‐ Kotka/Hamina Study & works Finnish Transport Agency 2030 165 Public funds and possible EU Co‐funding (CEF) X X the railway yards as well as different railway and road sections E18 Hamina bypass : The project includes a construction of a 15 km ring road for safe and smooth traffic on FI 11 Road Hamina Works Finnish Transport Agency 2011‐2015 180 Financed from national budget and EU funds. X the north side of the city of Hamina. Ring Road III, the second phase : Ring Road III, which is part of E18, will be improved in the Lentoasemantie FI 13 Road Helsinki Works Finnish Transport Agency 2013‐2016 150 Financed by national and regional/local funds. X area and between Lahdenväylä and Porvoonväylä. Hamina ‐ Vaalimaa (RU E18 Hamina – Vaalimaa : The completion of the E18 highway between Hamina and Vaalimaa will provide a FI 14 Road Study & works Finnish Transport Agency 2015‐2018 660 Financed from national budget and EU funds. X border) motorway‐standard road from Turku to Vaalimaa, on the Russian border. Ring Road III, the third phase : Construction of new intersections and third lines for needed sections, FI 16 Road Helsinki Study & works improvement of existing intersections, parallel road connections as well as public transport and light traffic Finnish Transport Agency 154 Public funds and possible EU Co‐funding (CEF) X arrangements, implementation of the noise abatement. E18 Naantali ‐ Kaarina: Cnstruction of additional line sections, new intersections and tunnel, improvement of FI 17 Road Naantali ‐ Kaarina Study & works existing intersections, parallel road network, light traffic system and traffic management system. [cost for 1st Finnish Transport Agency 163 Public funds and possible EU Co‐funding (CEF) X phase included in cost column] Renewal of road, sea and rail traffic control systems : The project of renewing the control systems comprises Road + Rail + FI 18 Nationwide Works ICT system projects related to developing the road, sea and rail traffic control systems, as well as equipment Finnish Transport Agency 2013‐2018 90 Public funds and possible EU Co‐funding (CEF) X Sea and service procurements. Passenger Terminal to West Harbour: Terminal with efficient land connections, because of substantially Port of Helsinki, City of FI 23 a Seaport Helsinki Study & works increasing transport volumes between Helsinki and Tallinn. Passenger terminal (MoS application) to be built Helsinki, Finnish Transport 2014‐2018 275 Public funds and possible EU Co‐funding (CEF) X x by 07/2017. Planning phase to be started to improve hinterland connections. Agency Page 1 of 20 03 December 2014 Annex 3 ‐ List of projects Scandinavian‐Mediterranean Corridor ‐ sorted by Country and Mode ‐ Final Report CEF pre‐ Transport Studies or Costs Critical ID Location Description of project Project promoter Timing Financing sources identified mode works (MEUR) issue section Port of Helsinki, City of Pdeepening of Vuossari Harbour fairway: Fairway depth from 11m to 13 m and improvement of the sea basin FI 23 b Seaport Helsinki Study & works Helsinki, Finnish Transport 2016‐2018 50 Public funds and possible EU Co‐funding (CEF) to meet the needs created by growing vessel sizes in short sea shipping.. Agency Naantali, Turku, Seaport + The Finnish ScanMed Ports: Joint project of the Finnish ScanMed ports including e.g. improvements of the Ports of Naantali, Turku, FI 19 Helsinki and Study & works 2014‐2020 400 Public funds and possible EU Co‐funding (CEF) X MoS maritime access as well as LNG‐infrastructure and services, development of the intermodality and e‐Freight Helsinki and HaminaKotka HaminaKotka Development of Turku airport : Renovation of the terminal building and paved areas, improvement of the FI 21 Airport Turku Works Finavia 2014 14 Financed by national budget X passenger services Development of Helsinki airport : Several improvement, repairs and maintenance measures in a major FI 22 Airport Helsinki Study & works Finavia 2014‐2020 900 Public funds and possible EU Co‐funding (CEF) X development programme at Helsinki Airport KORARO project (studies): The project includes land use, urban and technical planning for the new planned FI 20 RRT Kouvola Study & works terminal area of Kouvola RRT, terminal area governance and sustainability as well as railway sector City of Kouvola 2015‐2017 4 Public funds and possible EU Co‐funding (CEF) X deregulation and technology studies. KORARO project (works): The project includes extension of the rail yard, including infrastructure extension for FI 20a RRT Kouvola Study & works multimodal operations, governance and service management model as well as extension of the basic City of Kouvola 2017‐2020 35 Public funds and possible EU Co‐funding (CEF) X infrastructures, cross border infrastructures and connectiviyt upgrades) Port of Helsinki, City of FI 23 c RRT Helsinki Study & works New Intermodal terminals: Terminals to serve the Helsinki node incl. Developmentof dry ports Helsinki, Finnish Transport 2014‐2020 5 Public funds and possible EU Co‐funding (CEF) X x Agency Long distance commuting: Long distance commuting: trip chains, smart transport, urban development of rail Regional Councils, city of FI 23 Multimodal Helsinki Study & works 2014‐2020 4 Public funds and possible EU Co‐funding (CEF) X terminal areas (HHT) Helsinki FI 23 d ITS ScanMed Corridor Study & works Implementing of cooperative I T S : Nordic way; Next I T S, EIP++ Finnish Transport Agency 2014‐2016 2 Public funds and possible EU Co‐funding (CEF) Seaport + Turku/Naantaki ‐ Pre‐identified project: Port interconnection: Study and potentially services for further port interconnections, FI 19a/SE Study Port Authorities and other 2030 Public funds and possible EU Co‐funding (CEF) X x MoS Stockholm serving the Ports of Stockholm and Finnish ports (Turku, Naantalim Helsinki, HaminaKotka).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us