Sub Sector Project Description Budget Estimates Budget Release Actual Expenditure Status << Home Search by Sector

Sub Sector Project Description Budget Estimates Budget Release Actual Expenditure Status << Home Search by Sector

<< Home Search By Sector Sector Data updated as on: 04­11­2015 Sector: WATER Rs: 6,870,000,000 Rs: 1,654,951,000 Rs: 761,437,626 Sub Project Description Budget Estimates Budget Release Actual Expenditure Status Sector CL00001004­Construction of Khandan JonaliKochIrrigation Water 260,000 260,000 0 ­ Scheme Booni Chitral. PS00001004­Construction of Khandan JonaliKochIrrigation Water 260,000 0 0 ­ Scheme Booni Chitral. PR03001118­Creation of Planning and MonitoringCellin Water 5,564,000 5,564,000 1,411,680 ­ Irrigation and Power Departments. PS03001118­Creation of Planning and MonitoringCellin Water 5,564,000 0 0 ­ Irrigation and Power Departments. PS04001150­Feasibility/construction ofBazaiIrrigation Water 10,000 0 0 ­ Scheme. KT04001151­Construction of 20 Nos Water 7,500,000 7,500,000 1,524,130 ­ SmallDams/DelayAction Dams in NWFP. PS04001151­Construction of 20 Nos Water 30,000,000 0 0 ­ SmallDams/DelayAction Dams in NWFP. PR04001153­Updating study of TNO 1998 on Water 3,899,000 3,899,000 272,000 ­ groundwaterpotential in all district of NWFP. PS04001153­Updating study of TNO 1998 on Water 3,899,000 0 0 ­ groundwaterpotential in all district of NWFP. PS14000283­Chashma Right Bank Canal lift cumgravity Water 100,000 0 0 ­ project D.I Khan.(Federally Funded Rs. 100000 M). PR08000003­Construction of Sanam Palai andKundalDam Water 10,000,000 10,000,000 0 ­ in NWFP (PSDP Funded Cost Rs 481.046 M) PS08000003­Construction of Sanam Palai andKundalDam Water 30,000,000 0 0 ­ in NWFP (PSDP Funded Cost Rs 481.046 M) Water BU08000151­Construction of intake structureforBaran Dam. 5,000,000 5,000,000 5,000,000 ­ Water PS08000151­Construction of intake structureforBaran Dam. 15,000,000 0 0 ­ MD10000288­"Detail Design for ConstructionofBarrage on Water Swat River at AT works for feeding Upper Swat 9,923,000 4,961,000 0 ­ CanalSystem,Malakand." MD10000289­"Feasibility Study/Construction Water 13,500,000 6,750,000 1,414,857 ­ ofCivilChannels from Landaki to Hisar Baba, Malakand." PR11000116­Constuction of small dams Water 20,000,000 20,000,000 20,000,000 ­ inKhyberPakhtunkhwa. PS11000116­Constuction of small dams Water 60,000,000 0 0 ­ inKhyberPakhtunkhwa. PR12000075­PS12000075­Revamping of Budni Nullah Water 10,000,000 10,000,000 0 ­ inDistrictPeshawar PS12000075­PS12000075­Revamping of Budni Nullah Water 30,000,000 0 0 ­ inDistrictPeshawar PR12000030­"PS12000030­""Construction of Small Damat Water 15,000,000 15,000,000 15,000,000 ­ Kiyala,District Abbottabad.""" PS12000030­"PS12000030­""Construction of Small Damat Water 45,000,000 0 0 ­ Kiyala,District Abbottabad.""" KT12000118­"PS12000118­""Pre­Feasibility Water study,FeasibilityStudy and Detail Design of small dams in 1,250,000 1,250,000 0 ­ Khyber PakhtunkhwaPhase­II""" PR12000118­"PS12000118­""Pre­Feasibility Water study,FeasibilityStudy and Detail Design of small dams in 1,250,000 1,250,000 773,025 ­ Khyber PakhtunkhwaPhase­II""" PS12000118­"PS12000118­""Pre­Feasibility Water study,FeasibilityStudy and Detail Design of small dams in 7,500,000 0 0 ­ Khyber PakhtunkhwaPhase­II""" CL12000079­PS12000079­Feasibility Study forAlternatealignment / proposal for the Construction of Water 5,760,000 5,760,000 0 ­ Trichan toAttahkIrrigation Scheme Tehsil Mulkoh Distt: Chitral. PS12000079­PS12000079­Feasibility Study forAlternatealignment / proposal for the Construction of Water 5,760,000 0 0 ­ Trichan toAttahkIrrigation Scheme Tehsil Mulkoh Distt: Chitral. BU12000007­PS12000007­Raising of Baran Water 5,000,000 5,000,000 0 ­ Dam(Presentation toPDWP). PS12000007­PS12000007­Raising of Baran Water 15,000,000 0 0 ­ Dam(Presentation toPDWP). DA12000080­"PS12000080­""Construction of Water 1,178,000 1,178,000 0 ­ GanooraiIrrigationChannel, District Dir Upper.""" PS12000080­"PS12000080­""Construction of Water 2,356,000 0 0 ­ GanooraiIrrigationChannel, District Dir Upper.""" MD12000015­PS12000015­Construction of Water 7,500,000 7,500,000 5,889,481 ­ RangmalaIrriationScheme in Malakand. PS12000015­PS12000015­Construction of Water 22,500,000 0 0 ­ RangmalaIrriationScheme in Malakand. PS14000327­Detailed Design and Construction ofSiran Water 30,000,000 0 0 ­ Right Bank Canal District Mansehra. Water PR13000105­Providing Railing / Fencing ofCanalspassing 10,000,000 10,000,000 10,000,000 ­ through Peshawar City. PS13000105­Providing Railing / Fencing ofCanalspassing Water 30,000,000 0 0 ­ through Peshawar City. PR13000127­"""Construction of Gadwalian Water 11,600,000 11,600,000 11,600,000 ­ Dam,DistrictHaripur.""" PS13000127­"""Construction of Gadwalian Water 11,600,000 0 0 ­ Dam,DistrictHaripur.""" AD13000129­Construction of FloodMitigationStructures in Water 2,000,000 2,000,000 1,850,616 ­ Khyber Pakhtunkhwa. CA13000129­Construction of FloodMitigationStructures in Water 1,000,000 1,000,000 0 ­ Khyber Pakhtunkhwa. DA13000129­Construction of FloodMitigationStructures in Water 2,600,000 2,600,000 2,600,000 ­ Khyber Pakhtunkhwa. MD13000129­Construction of FloodMitigationStructures in Water 480,000 480,000 480,000 ­ Khyber Pakhtunkhwa. MR13000129­Construction of FloodMitigationStructures in Water 520,000 520,000 392,728 ­ Khyber Pakhtunkhwa. PR13000129­Construction of FloodMitigationStructures in Water 7,000,000 7,000,000 0 ­ Khyber Pakhtunkhwa. PS13000129­Construction of FloodMitigationStructures in Water 56,250,000 0 0 ­ Khyber Pakhtunkhwa. SU13000129­Construction of FloodMitigationStructures in Water 4,000,000 4,000,000 4,000,000 ­ Khyber Pakhtunkhwa. SW13000129­Construction of FloodMitigationStructures in Water 1,150,000 1,150,000 1,150,000 ­ Khyber Pakhtunkhwa. PS13000106­Construction of Canal Patrol RoadalongWGC Water 30,000,000 0 0 ­ on the R/Side from Ring Road to Kohat Road. AD13000130­Construction / Improvement ofSmallStorage Water 2,500,000 2,500,000 2,500,000 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. BU13000130­Construction / Improvement ofSmallStorage Water 1,000,000 1,000,000 1,000,000 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. CA13000130­Construction / Improvement ofSmallStorage Water 1,000,000 1,000,000 0 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. DA13000130­Construction / Improvement ofSmallStorage Water 2,500,000 2,500,000 2,499,989 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. KT13000130­Construction / Improvement ofSmallStorage Water 1,000,000 1,000,000 0 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. MD13000130­Construction / Improvement ofSmallStorage Water 300,000 300,000 0 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. PR13000130­Construction / Improvement ofSmallStorage Water 2,000,000 2,000,000 2,000,000 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. PS13000130­Construction / Improvement ofSmallStorage Water 37,800,000 0 0 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. SU13000130­Construction / Improvement ofSmallStorage Water 500,000 500,000 0 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. SW13000130­Construction / Improvement ofSmallStorage Water 1,700,000 1,700,000 1,700,000 ­ and flow Irrigation Schemes in Khyber Pakhtunkhwa. DI13000098­Construction / Improvement of GuideBundRoad Water 10,000,000 10,000,000 3,220,145 ­ District D.I.Khan. PS13000098­Construction / Improvement of Water 30,000,000 0 0 ­ GuideBundRoad District D.I.Khan. AD13000107­Providing Bridges and VR Culvertsondifferent Water canal systems in Khyber Pakhtunkhwa and Covering 1,000,000 1,000,000 0 ­ ofWarsakGravity CA13000107­Providing Bridges and VR Culvertsondifferent Water canal systems in Khyber Pakhtunkhwa and Covering 1,000,000 1,000,000 0 ­ ofWarsakGravity DI13000107­Providing Bridges and VR Culvertsondifferent Water canal systems in Khyber Pakhtunkhwa and Covering 1,250,000 1,250,000 0 ­ ofWarsakGravity MD13000107­Providing Bridges and VR Culvertsondifferent Water canal systems in Khyber Pakhtunkhwa and Covering 2,000,000 2,000,000 0 ­ ofWarsakGravity PS13000107­Providing Bridges and VR Culvertsondifferent Water canal systems in Khyber Pakhtunkhwa and Covering 17,600,000 0 0 ­ ofWarsakGravity SU13000107­Providing Bridges and VR Culvertsondifferent Water canal systems in Khyber Pakhtunkhwa and Covering 1,000,000 1,000,000 817,271 ­ ofWarsakGravity SW13000107­Providing Bridges and VR Culvertsondifferent Water canal systems in Khyber Pakhtunkhwa and Covering 1,150,000 1,150,000 0 ­ ofWarsakGravity PS13000121­Construction of Bagh DheriFlowIrrigation Water 112,500,000 0 0 ­ Scheme District Swat. SW13000121­Construction of Bagh DheriFlowIrrigation Water 37,500,000 37,500,000 37,500,000 ­ Scheme District Swat. DI13000099­Extention and Improvement of spur No Water 30,000,000 30,000,000 15,000,000 ­ 18onR/B of Indus River District D.I.Khan. PS13000099­Extention and Improvement of spur No Water 30,000,000 0 0 ­ 18onR/B of Indus River District D.I.Khan. PS13000117­Detailed Design and Construction ofPehurHigh Water 250,000 0 0 ­ Level Canal Extension District Swabi. SU13000117­Detailed Design and Construction ofPehurHigh Water 250,000 250,000 0 ­ Level Canal Extension District Swabi. DI13000100­"""Metalling of Road along Disty No.20,CRBC, Water 3,661,000 3,661,000 3,661,000 ­ D.I.Khan.""" PS13000100­"""Metalling of Road along Disty No.20,CRBC, Water 10,986,000 0 0 ­ D.I.Khan.""" AD13000126­Construction of flood structure onBaganKhatta Water 1,237,000 1,237,000 0 ­ for protection of officers colony Abbottabad PS13000126­Construction of flood structure onBaganKhatta Water 3,713,000 0 0 ­ for protection of officers colony Abbottabad PR13000112­Construction of FloodProtectionStructures in Water Suria Khail and Walai Khwars District Nowsheraand 8,235,000 8,235,000

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us