Train Path Availability

Train Path Availability

Contribution of infrastructure and interoperability on combined transport growth Train path availability Martin Burkhardt Director General UIRR 2007-04-17 page 1 Train path availability: analysis 2005 Main rail network in the Brenner corridor and branches Augsburg München D Salzburg Innsbruck A - CH Verona München I Bolzano Core Section Trento Trieste Milano Verona Padova - Verona Bologna Extension Bologna 2007-04-17 page 2 Train path availability: analysis 2005 Infrastructure improvement Brenner Base Tunnel (EN) „Horizon 2010“: München Mühldorf - actual line incl. capacity improvements (automatic block Brennero-Verona, 2006) Grafing - removal of bottle neck Unterinntal 65km Rosenheim (4-track expansion Kundl-Baumkirchen, 2010) -> 18 Mio. t Capacity 170km 32km Kufstein „Planning case 2015“: Wörgl - 2-track Brenner-Basetunnel, 2016 73km Innsbruck - Partly expansion of branch lines Single track NEW 1-track Fortezza-Waidbruck, Double track NEW 1-track by-pass Bolzano 57km - partly expansion of expansion line 105km 425km München-Mühldorf-Freilassing Fortezza/Franzensfeste 48km - freight train relieve Mühldorf-Rosenheim Bolzano/Bozen -> 60 Mio. t Capacity Additionally, simultanous necessesary: 55km Trento - Rosenheim-Wörgl - Bolzano-Trento 150km 95km Verona H. Maak, Schrittweiser Ausbau der Brenner-Eisenbahnachse, ETR 7/8 2004 2007-04-17 page 3 Considerable structural change: 2007 RoLa Services New situation 2007 Regensburg Ökombi Relation Trains both directions Wörgl - Trento 56 Wörgl Wörgl - 170 Brennersee Verona Brennersee + from May 2007 Regensburg Trento Trento Trains/week 228 2007-04-17 page 4 Unaccompanied intermodal services 2006/07 Regular Trains per week Operator both directions Kombiverkehr / Cemat 186 TI / TX Company Trains 18 KombiDan / Cemat 12 Hupac (since 2007) 12 Trains/week 228 2007-04-17 page 5 Train path availability: analysis 2005 Infrastructure and System Framework „Natural Breakpoints“: München and Verona for BRC-railways 3 Language München Mühldorf 3 No Driver Change 3 Brake Sheet Grafing 65km 3 Wagon List Rosenheim { Signalling System 170km 32km Kufstein Wörgl Fritzens 73km Innsbruck *) *) 2. > 600to Single track NEW Double track NEW 3. >1200to 57km 105km 425km { Language Fortezza/Franzensfeste { Change Driver 48km 1200to/550m Bolzano/Bozen 1300to/450m { Driver 1+1 { Brake Sheet 55km Trento { Wagon List { Signalling System 150km { Train-Tail Plate/Lamp 95km { Freight Note/Data Entry { Signalling System Verona Source: BRAVO RA33 Meeting Frankfurt 2007-04-17 page 6 Train path availability: analysis 2005 Velocity Profile (München – Verona) MUNICH WÖRGL BRENNERSEE BRENNER TRENTO VERONA km 0 km 114 km 208 km 210 km 346 km 446 GÄRBERBACH BOZEN 100 km/h 70 km/h 30 km/h 0 km/h 1 H 07 MIN 1 H 27 MIN 3 H 13 MIN Source: ÖBB - Project Brenner Rail Cargo 2007-04-17 page 7 Train path availability: analysis 2005 Highly used capacity: e.g. München – Rosenheim 2007-04-17 page 8 Train path availability: analysis 2005 Use of Brennero/Brenner station during 24 hours 2007-04-17 page 9 Train path availability: analysis 2005 Current Bottlenecks – Line infrastructure Apart from general saturation: Decreasing possibilities of parking trains in the infrastructure of DB Netz (hampering buffering of trains in case of operational irregularities): ¾ Intensification of bottlenecks at departure and arrival stations by back-tailing of trains in the network or already at the departure terminals Availability of reserve and evasion slots in case of operational irregularities: ¾ Avoiding of train stops at transfer stations because of loss of connecting slot (train path) Nodal point of München and operations on München – Grafing – Rosenheim 2007-04-17 page 10 Train path availability: analysis 2005 Bottlenecks at stations / nodes Brenner station (Change of System) ¾ Complex (time consuming and costly) operation concept for locomotive change because of rigid separation of systems (no reversible tracks or routes) ¾ potential capacity bottleneck hampering increase of freight trains in relation with current operation concept and regulations of RFI Bolzano station Occupied by passenger trains Manual switches and signalling/train control does not allow to use as locomotive changing station Capacity bottleneck to optimise locomotive cycle times 2007-04-17 page 11 Train path availability: analysis 2005 Conclusions Current overall capacity is satisfying, whereas bottlenecks have been identified Further Operational Analysis can just be carried out by Infra Managers using timetable/simulation-tools “Round Table” between IMs and customers useful to agree upon priority measures Infrastructure Investments needed: ¾ München-Augsburg (two additional tracks Augsburg-Olching) (ongoing) ¾ Truderinger Kurve (for direct access to München-Riem Ubf) ¾ Kufstein-Innsbruck (two additional tracks between Kundl- Baumkirchen) for segregation of fast and slow traffic (ongoing) 2007-04-17 page 12 Train path availability: analysis 2005 Analysis of catalogue train paths 30 catalogue train paths 24 additionally available in each direction average time Munich Verona 7:30 h no difference to scheduled trains 2007-04-17 page 13 User requirements for train path allocation The role of the intermodal operators in train path scheduling 5. Acceptance/Rejection Leading 4. Improvement feedback loop Leading intermodal 3. Improvement request railway I M operator 2. time-table/train path offer undertaking 1. time-table/train path request co-ordination Partner Future option: direct path intermodal allocation to intermodal operator operators! 2007-04-17 page 14 User requirements for train path allocation 8 months but if a customer comes after the deadline it can be up to 20! Short term: within 5 days if slots are available! 2007-04-17 page 15.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us