M / S . Diamondresearchandmer

M / S . Diamondresearchandmer

DRAFT ENVIRONMENTAL IMPACT ASSESSMENT AND EMP REPORT FOR Proposed Area Development Project “Dream City” AT Block No. 177 & Others, Moje- Khajod, Taluka- Surat City, District – Surat, State- Gujarat. PROJECT CATEGORY: B, 8(b), Townships and Area Development Projects STUDY PERIOD: 12th March to 11th June, 2018 PROJECT PROPONENT: M/s. Diamond Research and Mercantile (Dream) City Limited (DREAM) CITY LIMITED PREPARED BY: en-VISIOn ENVIRO TECHNOLOGIES PVT. LTD 3rd FLOOR, SHRI RAM COMPLEX, ABOVE BANK OF INDIA, NEAR KARGIL CHOWK, SURAT-DUMAS ROAD, PIPLOD, SURAT-395007 GUJARAT. Phone No.: (0261) 2223003, 2224004 Email Add.: [email protected] Website: www.en-vision.in M/S. DIAMOND RESEARCH AND MERCANTILE Accreditation by QCI / NABET Certificate No. 1417/IA 003 180710_RP22_0 INDEX SR. NO. TITLE PAGE NO. CHAPTER-1 : INTRODUCTION 1.1 Purpose of EIA 1-1 1.2 Promoters and their background 1-1 1.3 Brief description of the project 1-2 1.4 Scope of study 1-2 1.5 Regulatory frame work 1-4 CHAPTER-2 : PROJECT DESCRIPTION 2.1 Type of the Project 2-1 2.2 Need for the project and its importance to the country and/or region 2-1 2.3 Information for the Violation 2.2 2.4 Location 2-3 2.5 Important Features of the Project 2-11 2.5.1 CRZ-Applicability for the project Site 2-12 2.6 Proposed Schedule and Approval for Implementation 2-12 2.7 Project Facilities 2-12 2.7.1 Scope of the Project Site 2-13 2.7.2 Change of topography and Land use due to the Project 2-14 2.7.3 Parking Details 2-14 2.7.4 Amenities at Project Site 2-16 2.8 Cost of the project 2-16 2.9 Resource Requirements 2-16 2.9.1 Construction Phase 2-17 2.9.2 Manpower requirement for the construction and operation phase 2-17 2.9.3 Raw Materials Requirement during Construction Phase 2-17 2.9.4 Energy Requirements 2-18 2.10 Source of Water, Water Requirements and Waste Water Generation 2-18 2.10.1 Sewage Treatment Plant (STP) 2-19 2.11 Air Environment 2-24 2.11.1 Source of Fugitive Emission (Dust) And Its Control 2-25 2.12 Solid Waste Generation and Management 2-25 2.13 Fire Hydrant System 2-27 2.13.1 Details of Fire Station 2-28 2.14 Rain Water Harvesting Plan 2-28 2.14.1 Drainage Pattern 2-30 2.15 Water conservation and its measures 2-32 2.15.1 Water Conservation Plan 2-32 2.15.2 Domestic Water Conservation Measures 2-32 2.16 Green Building Concepts 2-32 2.16.1 Energy Conservation Measures 2-32 2.17 Natural Resource Conservation 2-33 CHAPTER-3 : BASELINE ENVIRONMENTAL STATUS 3.1 Introduction 3-1 3.2 Period of monitoring 3-1 3.3 Components and methodology 3-1 3.4 Study area 3-2 3.5 Meteorological environment 3-2 3.5.1 Climate of study area 3-2 3.5.1.1 Predominant wind direction 3-3 M/S. DIAMOND RESEARCH AND MERCANTILE (DREAM) CITY LIMITED, SURAT, GUJARAT I - 1 SR. NO. TITLE PAGE NO. 3.5.1.2 Site specific micro-meteorology data 3-5 3.6 Air environment 3-7 3.6.1 Sampling methodology and analysis 3-7 3.6.2 Selection of monitoring locations 3-7 3.6.3 Results and discussion 3-9 3.7 Water environment 3-12 3.7.1 Sampling methodology and analysis 3-12 3.7.2 Selection of monitoring location 3-13 3.7.3 Discussions 3-20 3.7.3.1 Ground water 3-20 3.7.3.2 Surface water 3-20 3.8 Noise environment 3-21 3.8.1 Selection of monitoring locations and results 3-22 3.8.2 Discussion of noise levels 3-24 3.8.3 Traffic study 3-25 3.8.3.1 Methodology 3-25 3.8.3.2 Summary and Discussion 3-26 3.9 Soil Environment 3-27 3.9.1 Sampling Methodology and Analysis 3-27 3.9.2 Sampling locations and Result 3-28 3.9.3 Discussion-soil environment 3-31 3.10 Landuse 3-31 3.10.1 Methodology of study 3-32 3.10.1.1 Pre-field interpretation 3-32 3.10.1.2 Site / ground truthing 3-32 3.10.1.3 Post field work 3-33 3.10.2 Land use / land cover map 3-33 3.11 Geomorphological, Geological, Hydro-Geological status 3-37 3.11.1 Methodology of field study 3-37 3.11.2 Geomorphology, Drainage & Watershed 3-37 3.11.3 Regional Geology & Structural Symbol 3-38 3.11.4 Geotechnical Studies 3-41 3.11.5 Seismic Zone 3-41 3.11.6 Soil 3-41 3.11.7 Hydrogeology 3-42 3.11.8.1 Expected Subsurface Strata 3-43 3.11.8.2 Inference 3-43 3.12 Socio - Economic Environment 3-45 3.12.1 Introduction 3-45 3.12.2 Major objective of the study 3-45 3.12.3 Identification of Stakeholders 3-45 3.12.4 Methodology 3-46 3.12.4.1 Primary data collection: tools and technique 3-46 3.12.4.2 Secondary data collection 3-47 3.12.4.3 Data analysis and interpretation 3-47 3.12.4.4 Limitation 3-47 3.12.5 The project influence area 3-47 3.12.6 Overview of the study area 3-51 3.12.7 Findings of community consultation 3-51 3.12.8 Public Consultation 3-54 3.12.9 Conclusion 3-57 3.13 Ecology and biodiversity of terrestrial environment 3-57 3.13.1 Biological diversity 3-58 3.13.2 Period of the study and study area 3-58 3.13.3 Methodology 3-59 3.13.4 Habitats description of the area (10 km) 3-62 3.13.5 Floral diversity of study area 3-64 3.13.5.1 Mangroves 3-64 3.13.5.2 Trees 3-64 3.13.5.3 Shrubs 3-66 3.13.5.4 Herbs 3-67 M/S. DIAMOND RESEARCH AND MERCANTILE (DREAM) CITY LIMITED, SURAT, GUJARAT I - 2 SR. NO. TITLE PAGE NO. 3.13.5.5 Climbers and Twiners 3-69 3.13.5.6 Cultivated plant in the study area 3-72 3.13.6 Endemic plant of Study area 3-72 3.13.7 Status of Forest and their category in the Study area 3-72 3.13.8 Faunal Biodiversity in the study area 3-72 3.13.9.1 Birds of the study area 3-72 3.13.9.2 Butterflies from the study area 3-75 3.13.9.3 Herpetofauna 3-75 3.13.9.4 Mammals 3-76 3.13.10 Rare and endangered fauna of the study area 3-76 CHAPTER-4 : ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES 4.1 Identification of impacts 4-1 4.1.1 Objective 4-1 4.1.2 Environmental aspects 4-1 4.1.3 Environmental impacts 4-1 4.1.4 Environmental indices 4-2 4.1.5 Environmental impact assessment study 4-2 4.1.5.1 Identification of impacts 4-2 4.1.5.2 Ecological impact assessment considered the following stages 4-2 4.1.5.3 Component wise environment risk assessment and mitigation 4-3 4.2 Impact identification and assessment 4-3 4.3 Significance of Impacts & Proposed Mitigation Measures 4-4 4.3.1 Emission Source and Air Quality Modeling 4-8 4.3.2 Impact and Mitigation on Air Pollution 4-8 4.3.3 Impact and Mitigation on Water Pollution 4-8 4.3.4 Impact and Mitigation on Noise Pollution 4-8 4.3.5 Impact and Mitigation on Solid Waste Management 4-8 4.3.6 Impact and Mitigation on Socio Economic Aspects 4-9 CHAPTER-5 : ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE) 5.1 General 5-1 5.2 Alternatives of site 5-1 5.3 Alternative technologies 5-2 5.3.1 Transport 5-2 5.3.2 Building materials and technologies 5-2 5.3.3 Energy conservation 5-3 CHAPTER-6 : ENVIRONMENTAL MONITORING PROGRAM 6.1 Introduction 6-1 6.2 Monitoring and reporting procedure 6-1 6.3 Laboratory facility 6-2 CHAPTER-7 : ADDITIONAL STUDIES 7.1 Public consultation/hearing 7-1 7.1.1 Introduction 7-1 7.1.2 Approach to the Study 7-1 7.1.3 Hazard Assessment and Evaluation 7-1 7.1.3.1 Methodology 7-1 7.1.3.2 Preliminary Hazard Analysis (PHA) 7-2 7.1.3.3 Fire Explosion and Toxicity Index (FE&TI) Approach 7-2 7.1.4 Control Measures 7-3 7.2 Disaster Management Plan 7-4 M/S. DIAMOND RESEARCH AND MERCANTILE (DREAM) CITY LIMITED, SURAT, GUJARAT I - 3 SR. NO. TITLE PAGE NO. 7.2.1 Emergency Preparedness Plan For Fire And Personnel Injury 7-5 7.2.1.1 Safety in Storage of Materials, Products & Wastes 7-5 7.2.1.1.1 High Speed Diesel 7-5 7.2.1.2 Diesel Storage 7-6 7.2.1.3 Furnishing Material 7-6 7.2.1.4 Remedial Measures 7-6 7.2.1.5 Communication 7-6 7.2.1.6 Chain of Command 7-7 7.2.2 Fire & Line Safety 7-7 7.2.3 Flood Hazard 7-7 7.3 Resettlement and Rehabilitation 7-8 CHAPTER-8 : ENVIRONMENTAL DAMAGE ASSESSMENT, REMEDIATION PLAN, NATURAL AND COMMUNITY RESOURCE AUGMENTATION PLAN 8.1 Justification for Violation 8-1 8.1.1 Environmental Damage Assessment 8-2 8.2 Remediation Plan 8-8 8.3 Natural and Community Resource Augmentation Plan 8-8 8.4 Economic Benefit due to Violation Activity 8-9 8.5 Conclusion and Recommendation 8-9 8.6 Implementation Schedule of Planned activities and related bank guarantee 8-9 CHAPTER-9: PROJECT BENEFITS 9.1 Physical Infrastructure 9-1 9.2 Social Infrastructure 9-1 9.3 Employment Potential 9-2 9.4 Other Tangible Benefits 9-2 CHAPTER-10: ENVIRONMENTAL COST BENEFIT ANALYSIS 10.1 Environmental Cost Benefit Analysis 10-1 CHAPTER-11: ENVIRONMENTAL MANAGEMENT PLAN 11.1 Introduction 11-1 11.1.1 Objectives of EMP 11-1 11.2 Environment Management Plan 11-2 11.2.1 Land Environment 11-2 11.2.2 Soil Environment 11-4 11.2.3 Water Environment 11-5 11.2.4 Hydro Geological Environment 11-6 11.2.5 Noise Level Monitoring & Traffic Management 11-7 11.2.6 Ecological Environment 11-9 11.2.7 Socio Economic Environment 11-11 11.2.8 Risk & Hazard And Occupational Health & Safety 11-13 11.2.9 Solid And Hazardous Waste Management 11-14 11.2.10 Air Environment 11-15 11.3 Green Belt Development Programme 11-16 11.3.1 Selection of Plants for Greenbelts 11-16 11.4 EMP for the Construction Phase 11-18 11.4.1 Soil Excavation & Site Preparation 11-18 11.4.2 Vegetation and Top Soil Management 11-18 11.4.3 Construction Debris 11-19 11.5 Environmental Management Cell (EMC) 11-19 M/S.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    341 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us