Network Statement 2022 – Appendix 3.5A

Network Statement 2022 – Appendix 3.5A

Network Statement 2022 – Appendix 3.5A 1 Appendix 3.5A Contents Page 1. Long-distance lines Overview of the Long-distance lines 3 - 6 TIB 1 – 35 8 - 15 2. S-Lines Overview of the S-Lines 7 TIB 810 – 880 16 - 17 2 3 4 5 6 7 Serial TIB Line Project Description Exp. duration Exp. period Exp. dates Traffic impact Builder Categorisation, no. cf. Annex VII 1 1 København H (excl.) Track renewal Track, switches, and 18 days July-August 6/7-24/7 Total closure of Banedanmark High – Høje Tåstrup Kh-Htå drainage works lines. Operations (incl.) to Høje Tåstrup from west are possible 2 1 Glostrup (excl.) – Track renewal Track and drainage 7 weeks May-July 2/5-25/6 Right track Banedanmark Major Høje Tåstrup (excl.) Kh-Htå works possessed 3 1 Høje Tåstrup (incl.) Track renewal Track and drainage 7 weeks August- 8/8-2/10 Right track Banedanmark Major – Glostrup (excl.) Kh-Htå works September possessed 1 Glostrup (incl.) – The Capital's Light Bridge positioning 1 weekend Easter 15-18. April All tracks Hovedstadens Høje Tåstrup (excl.) Rail at Glostrup possessed. No Letbane (3. operations Kh – party) Htå 1 Ringsted (excl.) – Reconstruction of Track and bridge All holiday 9/4 – 18/4 Single track Banedanmark Roskilde (excl.) tracks works weekends during 13/5 -15/5 possession. the spring 26/5 – 29/5 One track 4/6 – 6/6 possessed at a time on the line Ro-Rg. 4 1 Ringsted (excl.) – Reconstruction of Track and bridge 3 weeks July-August 17/7 -7/8 3 weeks total Banedanmark High Roskilde (excl.) tracks works closure of lines 5 1 Ringsted (excl.) – Reconstruction of Track and bridge 9 weeks July-September 5/7 - 16/7 11 weeks single Banedanmark High Roskilde (excl.) tracks works 8/8 - 2/10 track possession. One track possessed at a time on the line Ro-Rg. 1 Slagelse (excl.) – NFSP0541 Track and bridge All holiday 9/4 – 10/4 Single track Banedanmark XXXXXX Korsør (excl.) works Slagelse - weekends during 14/4 –18/4 possession. Korsør the spring 13/5 -15/5 One track 26/5 – 29/5 possessed at a 4/6 – 6/6 time on the line Sg-Kø. 6 1 Slagelse (excl.) – NFSP0541 Track and bridge 3 weeks June-July 27/6 – 17/7 Single track Banedanmark High Korsør (excl.) works Slagelse - possession. Korsør One track possessed at a time on the line Sg-Kø. Parts of track 1 in Korsør are possessed. 7 1 Slagelse (excl.) – NFSP0541 Track and bridge 8 days + 8 hours July 17/7 – 25/7 Total closure of Banedanmark High Korsør (incl.) works Slagelse - lines. Operations Korsør to Korsør from west is possible. 8 1 Slagelse (excl.) – NFSP0541 Track and bridge 2 weeks July-August 25/7 – 7/8 Single track Banedanmark High Korsør (excl.) works Slagelse - possession. Korsør One track possessed at a 8 Serial TIB Line Project Description Exp. duration Exp. period Exp. dates Traffic impact Builder Categorisation, no. cf. Annex VII time on the line Sg-Kø. Parts of track 1 in Korsør are possessed. 11 1 Snoghøj (incl.) – EP Modernisation Establishment of a 1x 30 hours per Q1-Q2 Not settled Single track Banedanmark Medium Fredericia (incl.) NA0022 new neutral section track operations + No traction current available 12 1 Snoghøj (incl.) – EP Modernisation Establishment of a 1x 30 hours per Q1-Q2 2022 Not settled Single track Banedanmark Medium Taulov (incl.) NA0022 new neutral section track operations + No traction current available 13 2 Orehoved (incl.) Signalling Test / Putting into 2 x 56 hours Q1, Q2 Not settled Total closure of Banedanmark Medium Programme service of track 1 lines. Fjernbane Roll Out 7 14 2 Nykøbing F Vest RFB Soft ground work, All year round All year round 1/1-31/12 Total closure of Banedanmark Major (excl.) – Rødby preparations for lines. Færge (incl.) double track 15 2 Nykøbing F Vest RFB Placing of rolling All year round All year round 1/1-31/12 Total closure of Banedanmark Major (incl.), stock, etc. Shunting lines. Lokaltog can track 1 (I-signal D to and from the operate to to U-signal B) work track Nykøbing F St. 16 4 Køge N (excl.) - Platform extension Switch works before 8 days Spring 10/4-18/4 Total closure of Banedanmark High Næstved (excl.) at Haslev st. extension of island lines. platform 17 4 Køge N (excl.)- Platform extension Mounting of 18 m 4 weeks Summer 2/7-31/7 Possession of track Banedanmark High Næstved (excl.) at Haslev st. extra platform 2 /island platform. southwards as an Track 1 can be extension of the operated. island platform 5 Roskilde (excl.) - Reconstruction of Drainage work, 3 weekends July – August 17/7 – 7/8 Single track Banedanmark XXXXX Lejre (excl.) tracks Roskilde - tracks in total possession. Ringsted 18 5 Holbæk (excl.) - Roskilde - Track works 4 weeks April-May 08/4-06/5 Total closure of Banedanmark Major Kalundborg (Incl.) Kalundborg lines. 19 5 Jyderup (excl.)– Track works Track works in Jy – 16 days March-November 1/3-1/11 Total closure of Banedanmark High Kalundborg (excl.) Se, in Væ, and in Kb lines. 20 6 Vigerslev (excl.)- Signalling Static test 2 x 56 hours Q1 Not yet settled Total closure of Banedanmark Medium Kjn -Ringsted Programme lines. (excl.) Fjernbane Roll Out 1 21 6 Vigerslev (excl.)- Signalling Static test 3 x 56 hours Q2 Not yet settled Total closure of Banedanmark Medium Kjn-Ringsted (excl.) Programme lines. Fjernbane Roll Out 1 22 6 Vigerslev (excl.) – Programme Test runs 6 x 56 hours Q3, Q4 Not yet settled Total closure of Banedanmark Medium Kjn – Fjernbane Roll Out 1 lines. Ringsted (excl.) 9 Serial TIB Line Project Description Exp. duration Exp. period Exp. dates Traffic impact Builder Categorisation, no. cf. Annex VII København G (excl.) – Kjn – Ringsted (excl.) Lille Skensved (excl.) – Kjn (excl.) 23 6 Vigerslev (excl.) - Signalling Putting into service 1 x 56 hours Q4 Not yet settled Total closure of Banedanmark Medium Kjn-Ringsted (excl.) Programme lines Fjernbane Roll Out 1 24 11 Københavns Maintenance Maintenance of the 24 hours March 19/3 – 20/3 Total closure of Øresundsbroen Medium Lufthavn Kastrup Oeresund bridge lines (excl.) – Peberholm (incl.) 25 11 Københavns Maintenance Maintenance of the 24 hours November 5/11 – 6/11 Total closure of Øresundsbroen Medium Lufthavn Kastrup Oeresund bridge lines (excl.) – Peberholm (incl.) 26 11 Kastrup station Ny Kastrup Lufthavn Stage: 1a: Catenary 9 days July 16/07 – 25/07 Possession of Sund og Bælt High (incl.) Station (NKLS) works, i.a mounting tracks 11+12, all of new control trains through switch track 1+2 and SORF from 2. main track Phm- Cph 27 21 Odense (excl.) - Signalling Test operations 7 x 56 hours Q1, Q2 Not yet settled Total closure of Banedanmark Medium Svendborg (incl.) Programme lines Fjernbane Roll Out10 28 21 Odense (excl.) - Signalling Test operations 5 x 56 hours Q3 Not yet settled Total closure of Banedanmark Medium Svendborg (incl.) Programme lines Fjernbane Roll Out10 29 23 Fredericia (incl.) - Elevator Establishment of lift 23 days March- Week 22 – 25 Tracks 2 and 3 Banedanmark High Fredericia (incl.) NPTG0016 at track 2 September possessed 30 23 Fredericia (incl.)- Preparatory work New bridge, new 7 x weekend 1., 2. and 3. Week: Single track Banedanmark Medium Børkop (incl.) – FA-AR place possession quarter 2022 3,14,17,18,19, operations Vejle (incl.) Bridge 20520.8 20,35 Fredericia – Børkop - Vejle 31 23 Fredericia (incl.)- Preparatory work New bridge, new LA40 January- 3 weeks 16/1- La 40 max 300 m Banedanmark High Børkop (incl.) – FA-AR place February 7/2 at bridge 20520.8 Vejle (incl.) Bridge 20520.8 in both main tracks 23 Børkop (excl.) – Preparatory work Bridge lifting 1 possession 1. quarter 22022 11/2-13/2 Possession of Banedanmark XXXXXX Vejle (incl.) FA-AR Bridge 20568 (34 hours) tracks 2 4 and 40, left track Vj-Bk, permission to leave Vj under special conditions without a written order 10 Serial TIB Line Project Description Exp. duration Exp. period Exp. dates Traffic impact Builder Categorisation, no. cf. Annex VII 23 Børkop (excl.) – Preparatory work Bridge lifting 1 possession 1. quarter 22022 13/2-14/2 Possession of Banedanmark XXXXXXXX Vejle (incl.) FA-AR Bridge 20568 (22 hours) tracks 4, 6 and 40, left track Bk-Vj, permission to enter Vj under special conditions without a written order 36 23 Vejle (incl.) - Preparatory work New bridge, new 1 x day February 26/2-27/2 Total closure of Banedanmark Medium Heidenstam (incl.) FA-AR place possession both tracks Vejle - Bridge 20621 (30 hours) Hedensted 37 23 Vejle (incl.)- Preparatory work New bridge, new 1 x day November 19/11-20/11 Total closure of Banedanmark Medium Hedensted (incl.) FA-AR place possession both tracks Vejle - Bridge 20621 (30 hours) Hedensted 38 23 Vejle (incl.)- Preparatory work New bridge, new LA40 Current Along with Both tracks Vejle- Banedanmark * Hedensted (incl.) FA-AR place possessions Hedensted Bridge 20621 39 23 Vejle (incl.)- Preparatory work Demolition of bridge 1 x day April 22/4-24/4 Total closure of s Banedanmark Medium Hedensted (incl.) FA-AR Bridge 20624 possession (30 both tracks Vejle - hours) Hedensted 40 23 Horsens (incl.) - Preparatory work New bridge, same 1 x weekend May 20/5-22/5 Total closure of s Banedanmark Medium Hovedgård (incl.) FA-AR place possession both tracks Bridge 20724 between Horsens- Hovedgaard 41 23 Horsens (incl.)- Preparatory work New bridge, same LA40 Current Along with Both tracks Banedanmark * Hovedgård (incl.) FA-AR place possessions between Horsens- Bridge 20724 Hovedgaard 42 23 Hovedgård (incl.) - Preparatory work New bridge, same 1 x day April 23/4-24/4 Total closure of Banedanmark Medium Skanderborg (incl.) FA-AR place possession both tracks Bridge 20756 (30 hours) between Hovedgaard- Skanderborg 43 23 Hovedgård

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us