2005 Annual Return

2005 Annual Return

Annual Return Reporting on the year 2004/05 31 July 2005 Page 2 Contents Executive summary.....................................................................................................................................................................................................5 Introduction..................................................................................................................................................................................................................16 Network Rail’s regulatory targets....................................................................................................................................................................20 Key performance indicators................................................................................................................................................................................24 Section 1 – Operational performance .........................................................................................................................................................27 Introduction...................................................................................................................................................................................................27 Summarised network-wide data (delays to major operators) ........................................................................................28 National delay data by cause...............................................................................................................................................................30 Results for operating routes by delay category........................................................................................................................34 Further breakdown of performance data....................................................................................................................................43 Public Performance Measure (PPM)...............................................................................................................................................46 Section 2 – Asset failure .......................................................................................................................................................................................47 Infrastructure incidents recorded for attribution of delay..................................................................................................47 Network-wide totals................................................................................................................................................................................47 8 Operating Routes..................................................................................................................................................................................49 Section 3 – Asset quality ......................................................................................................................................................................................54 KPI 6 Network Rail Asset Stewardship Incentive Index (ASII)........................................................................................54 Number of broken rails (M1) .............................................................................................................................................................55 Rail defects (M2).........................................................................................................................................................................................57 Track geometry - national standard deviation data (M3)...................................................................................................60 Track geometry – poor track geometry (M3) ..........................................................................................................................62 Track geometry – speed band data (M3)....................................................................................................................................64 Track geometry – level 2 exceedences (M5)............................................................................................................................73 Condition of asset temporary speed restriction sites (M4)..............................................................................................75 Earthwork failures and derailments (M6).....................................................................................................................................78 Bridge condition (M8).............................................................................................................................................................................80 Signalling failures (M9).............................................................................................................................................................................83 Signalling asset condition (M10)........................................................................................................................................................85 Alternating current traction power incidents causing train delays (M11).................................................................88 Direct current traction power incidents causing train delays (M12) ...........................................................................90 Electrification condition – AC traction feeder stations and track sectioning points (M13)............................92 Electrification condition – DC traction substations (M14)................................................................................................94 Electrification condition – AC traction contact systems (M15)......................................................................................96 Electrification condition – DC traction contact systems (M16) .....................................................................................98 Station condition index (M17)........................................................................................................................................................100 Network Rail 2005 Annual Return Page 3 Station facility score (M18)................................................................................................................................................................103 Light maintenance depot – condition index (M19)............................................................................................................106 Section 4 – Activity volumes...........................................................................................................................................................................108 Introduction................................................................................................................................................................................................108 Track renewals: (M20) rail renewed (M21) sleepers renewed and (M22) ballast renewed......................109 Rail renewed (M20)...............................................................................................................................................................................110 Sleepers renewed (M21)....................................................................................................................................................................111 Ballast renewed (M22).........................................................................................................................................................................113 Switches and crossings renewed (M25)....................................................................................................................................115 Signalling renewed (M24)...................................................................................................................................................................116 Bridge renewals and remediation (M23)...................................................................................................................................117 Culverts renewals and remediation (M26)..............................................................................................................................118 Retaining walls remediation (M27)...............................................................................................................................................119 Earthwork remediation (M28) ........................................................................................................................................................120 Tunnel remediation (M29)................................................................................................................................................................121 Section 5 – Network capability .....................................................................................................................................................................122 Route classification .................................................................................................................................................................................123 Linespeed capability (C1)...................................................................................................................................................................124

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    237 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us