World Bank Document

World Bank Document

I E1016 Volume 2 Government of Islamic Republic of Iran l Public Disclosure Authorized | Supplementary Environmental and Social Assessment of Alborz Integrated Land and Water Management Project .. q .-.... - Public Disclosure Authorized I~~~~~~~~~~~~~~~* I Public Disclosure Authorized DRAFT 16 September 2004 Public Disclosure Authorized Prepared by Mahab Ghodss Consulting Engineers ' FILE COPY I I Table of Contents Acronyms and Abbreviations | 0 Executive Summary i 1 Introduction and Background | 1.1 Government Preparation of the Alborz Dam and the AILWMP 1-2 1.2 Design, Objectives and World Bank Involvement 1-4 1.3 Background of the Supplementary Environmental and Social Assessment (ESA) 1-6 1.3.1 Justification and Scope of the Supplementary ESA 1-6 1.3.2 Key Environmental and Social Issues for the ESA 1-7 3 2 Supplementary Information on Policy, Legal and Administrative Framework 2.1 National Legal Framework 2-1 2.1.1 Environmental Issues Addressed in the Third Five-year Development Plan 2-2 I 2.2 National Regulations and Decrees 2-3 2.3 International treaties 2-4 2.4 Policy Framework 2-5 I 2.4.1 National Environmental and Social Safeguard Policies 2-5 2.4.2 World Bank Environmental and Social Safeguard Policies 2-10 2.5 Administrative Framework 2-11 3 Project Description: Alborz Integrated Land and Water Management Project 3.1 Project Title 3-1 4 3.2 Objectives and Justification 3-1 3.3 Project Location 3-2 3.4 Project Components 3-6 || 3.5 Implementation, Oversight and Monitoring 3-24 3.6 Project Phases 3-25 3.7 Other Projects in Project Area 3-27 4 Environmental and Social Baseline Conditions 4.1 Physical and Chemical Environment 4-1 4.1.1 Topographic and Physiographic Conditions 4-1 4.1.2 Geology 4-2 4.1.3 Soils 4-3 4.1.4 Geo-tectonics 4-4 4.1.5 Erosion 4-5 4.1.6 Climate 4-6 9I4.1.7 Hydrology 4-10 4.1.8 Groundwater 4-21 4.1.9 Water Consumption 4-25 3 4.1.10 Ab-bandans (Surface Storage ponds) 4-28 4.1.11 Water Quality 4-29 4.1.12 Waste Water 4-45 3 4.1.13 Solid Waste 4-50 4.1.14 Pollution from Agriculture 4-54 I l | 4.2 Biological Environment 4-58 4.2.1 Flora & Fauna in the Ecological Sections 4-58 4.2.2 Protected areas natural habitats and areas of high biodiversity 4-70 4.2.3 Threatened species and their habitat requirements 4-73 4.2.4 Existing activities affecting the fauna and flora 4-77 4.3 Supplementary Socio-economic Baseline 4-80 a 4.3.1 Population 4-80 4.3.2 Economy 4-81 4.3.3 Services 4-82 J 4.3.4 Religion 4-84 4.3.4 Cultural Environment 4-84 4.4 Public Consultation on the AILWMP 4-85 4.4.1 Assessment of People's Perception of the AILWMP - Public Consultation 4-85 5 Supplementary Assessment of Environmental and Social Impacts 5.1 Supplementary Assessment of Impacts on Physical and Chemical Environment 5-3 5.1.1 Potential Impacts of the Project 5-3 5.2 Supplementary Assessment of Impacts on Biological Environment 5-11 || 5.2.1 Potential Impacts of the Project 5-12 5.3 Supplementary Assessment of Social Impacts 5-14 5.3.1 Potential Impacts of the Project 5-15 I 5.3.4 Resettlement Impacts of the Alborz Dam 5-18 5.4 Cumulative Project Specific Impacts 5-22 5.4.1 Analysis of Project Cumulative Impacts 5-23 5.4.3 Summary of Project Cumulative Impacts 5-24 6 Analysis of Alternatives I 6.1 Analysis of Alternative Components and Sub-Components 6-1 6.1.1 Without Project Alternative 6-1 6.1.2 With Partial Project Alternative 6-2 X 6.1.3 With Project Alternative 6-2 6.2 Project Alternatives 6-3 6.2.1 Dam and Irrigation and Drainage Network 6-3 Xt 6.2.2 Inclusion of Fish Farming 6-4 6.2.3 Water Use Scenarios 6-4 6.3 Justification for the Selected Project Alternative 6-6 7 Mitigation: Environmental and Social Management Plan 7.1 Forest and Wildlife Monitoring 7-3 3 7.2 Water Quality and Quantity Monitoring 7-9 7.2.1 Ab-bandan Management and Monitoring 7-13 7.3 River Ecology Monitoring and Mitigation 7-17 I 7.4 Basin Water Fund 7-22 7.5 Pest Management Plan 7-23 7.5.1 Pest Management in Project Area 7-25 1 7.6 Dam Safety Plan 7-30 7.6.1 Existing Dams and Dams under Construction 7-30 I | 7.6.2 Panel of Experts 7-30 7.6.3 Main Findings and Recommendations 7-31 7.6.5 Dam Safety Action Plan 7-33 I 7.7 Resettlement Action Plan and Policy Frameworks 7-37 7.7.1 Overview and Categorization 7-37 7.7.2 Supplementary Resettlement Plan for Alborz Dam 7-38 I 7.7.3 Additional Resettlement Plan Provisions 7-39 7.7.4 Resettlement Policy Framework - Upper Watershed 7-41 7.7.5 Resettlement Policy Framework - Lower Watershed 7-43 I 7.8 Physical Cultural Property 7-47 7.9 Proposed Budget for the ESMP 7-49 7.9.1 Overview 7-49 7.9.2 Summary of ESMP and Proposed Budget 7-49 7.9.3 Institutional Arrangements 7-62 7.9.4 Implementation Schedule 7-62 I 7.9.5 Reporting Program 7-63 7.9.6 Transparency and Public Participation 7-63 I I l I I Il 11 | List of Annexes Annex A: Maps * No. Map Number Subject 1 I-60-GL-01 Base Map (the detail of the Project Area and its Sections) 2 1-60-PE-01 Geological Formations * 3 I-60-PE-02 Location of the Existing Faults 4 1-60-PE-03 Location of the Gauging Stations 5 1-60-PO-01 Location of Major Industries J6 I-60-PO-02 Zone of Agricultural Lands 7 1-60-BO-01 Distribution of Salmo trutta 8 I-60-BO-02 Distribution Panthera pardus 9 I-60-BO-03 Distribution of Cervus&Capreolus 10 I-60-BO-04 Distribution of Ursus Arctos 11 I-60-BO-05 Distribution of Onkorrhynchos mykiss * 12 I-60-BO-06 Suitable Wetland for Habitat and Breeding of chlidonias 13 I-60-BO-07 Distribution of Ecologic Bird 14 I-60-BO-08 Lafoor Hunting Forbidden U 15 I-60-BO-09 High Biodiversity Area 16 I-60-BO-10 Vegetation Map 17 I-60-BO- 11 Vulnerable Communities I 18 I-59-MM-01 Surface Water Monitoring Points 19 I-59-MM-02 Location of Monitoring Wellls | Annex B Socio-economic and Culture Questionnaires Annex BlLife Quality, Cultural, Social and Economical Questionnaires (Questionnaire No. 1) Annex B2 Public opinion and Public Participation Questionnaire (Questionnaire No.2) Annex C List of Plant Species and Physiognomic Characters (Cl) and (C2) List and Taxonomy of Fish in 5 Babolrood Annex D Pest Management Plan (Prepared by MOJA) Annex E Resettlement Plan and Resettlement Policy Frameworks Annex F Governmental Approval Documents for Implementation of Alborz Dam & its Irrigation and Drainage Network in Project Area Annex G List of ESA Report Preparers Annex H Without-AILWMP Alternatives 5 Annex I Additional Impact Information Annex J Water Demand and Balances Worksheet | Annex K Worksheet in EIA Matrix Annex L Worksheets for Partial Costing of ESMP | Annex M Original ESA CD-ROM I I List of Acronyms and Abbreviations AILWMP Alborz Integrated Land and Water Management Project ANOVA Analysis of Variance * a.s.l. above sea level ASC Agricultural Service Centers BOD Biological Oxygen Demand I BP Bank Procedure (World Bank) BWC Basin-Wide Committee BWF Basin Water Fund I BWMF Basin Water Management Fund CAS Country Assistance Strategy CDD Community Driven Development * CEP Caspian Environmental Program CHO Cultural Heritage Office CLO Central Liaison Office I COD Chemical Oxygen Demand CWRAS Country Water Resources Assistance Strategy DDT dichlorodiphenyltrichloroethane * DO Dissolved Oxygen DOE Department of Environment EA Environmental Assessment J EAWRP Eastern Anatolia Watershed Rehabilitation Project (World Bank) EC Electric Conductivity EFS Extension and Farming Systems I EIA Environmental Impact Assessment EMP Environmental Management Plan EPP Emergency Preparedness Plan I ESA Environmental and Social Assessment ESMP Environmental and Social Management Plan FFS Farmer Field School I FRWO Forest, Rangeland and Watershed Organisation (of MOJA) GIS Geographic Information System GOI Government of the Islamic Republic of Iran I GPS Global Positioning System GSRC Government Stakeholder Representation Committee GW Groundwater I ha Hectares IAS Interim Assistance Strategy (of World Bank) I&D Irrigation and Drainage I IMS Information Management System IPM Integrated Pest Management IPPPM Integrated Pest and Plant Protection Management * I.R. Islamic Republic IUCN International Union for Conservation of Nature & Natural Resources l I 1,iwmv Integrated Water Resources Management IWRM Integrated Water Resources Management IWMU Integrated Water Management Unit JIUCN International Union for Conservation of Nature and Natural Resources km Kilometer LO Liaison Office I LUP Land Use Planning M&E Monitoring and Evaluation " mcm Million cubic meters I MCC Main Conveyance Canal MEF Ministry of Economy and Finance MDOE Mazandaran Provincial Department of Environment I MDOFA Mazandaran Department of Fisheries and Aquaculture MGCE Mahab Ghodss Consulting Engineers meq Micro-equivalent I MGCE Mahab Ghodss Consulting Engineers MGRWC Mazandaran and Golestan Regional Water Company MGW Mega Watts * MIS Management Information Systems Unit MJAD Mazandaran Jihad and Agriculture Department mmZ Millimeter I MNA Middle East/North Africa MOE Ministry of Energy MOH Ministry of Health * MOEF Ministry of Economics and Finance MOH Ministry of Health MOJA Ministry of Jihad Agriculture I MPO Management & Planning Organization (Govt.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    248 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us