FINAL EIA/EMP REPORT Rev.00_2020 ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots AT Village Biswasdih, P.O. Gadi Srirampur District Giridih, Jharkhand. PROJECT AREA- 4.755 Ha. [ToR LETTER NO: F. No. 23-90/2018-IA.III(V) on Dated 1st February, 2019] (STUDY PERIOD: 1st October To 31st December 2018) APPLICANT Lal Ferro Alloys Co. (P) Limited. Mr. Chetu Sao (Director) Village Biswasdih, P.O. Gadi Srirampur District Giridih, Jharkhand E-mail: [email protected] Ph: 9931573899 Fax: 06532-223003 ENVIRONMENT CONSULTANT VARDAN ENVIRONET (QCI/NABET ACCREDITED NO. NABET/EIA/1922/RA 0166) Plot 82-A, IMT Manesar, Sector -5, Gurugram (Haryana) E-MAIL: [email protected] CONTACT: 0124-4291036, 09899651342 DOCUMENT NO. 2018_VI_00035_FINAL EIA (July 2020) ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand FINAL EIA/ Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant EMP REPORT (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots REVIEW AND REVISION HISTORY History of revisions of the present report: Table I: History of the Revisions Rev. Date Modifications Remarks Report has been prepared by Team Vardan and Rev.00 28.07.2020 FINAL EIA /EMP Report all the comments of reviewers have been incorporated in FINAL EIA/EMP report. Document No. 2018_VI_00035 Table II: Record of Review Rev. Date Description Review-1 Review-2 Approval Rev.00 28.07.2020 FINAL EIA /EMP Mr. K. M. Khare Mr. S.K. Sharma Mr. R.S. Yadav Report 28.07.2020 30.07.2020 31.07.2020 - - - This Report has been prepared by Vardan EnviroNet on behalf of and for the use of the M/s Lal Ferro Alloys Co. (P) Ltd with due consideration and skill as per our general terms and conditions of business and terms of agreement with the M/s Lal Ferro Alloys Co. (P) Ltd. DISCLAIMER Vardan EnviroNet has taken all reasonable precautions in the preparation of this report as per its auditable quality plan. Vardan EnviroNet also believes that the facts presented in the report are accurate as on the date it was written. However, it is impossible to dismiss absolutely, the possibility of errors or omissions. Vardan EnviroNet therefore specifically disclaims any liability resulting from the use or application of the information contained in this report. The information is not intended to serve as legal advice related to the individual situation. i ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand EIA TEAM 3 Proposal: Environmental Clearance for Pig Iron plant (1x23m ) with capacity 12000 TPA and Coke Plant (24 DECLARATION ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots Declaration by Experts contributing to the EIA studies for M/s Lal Ferro Alloys Co. (P) Ltd at Village: Biswasdih, P.O. Gadi Srirampur, District: Giridih, Jharkhand. We, hereby certify that we were a part of the EIA report team in the following capacity that developed the above EIA. EIA coordinator: Name: Mr. K.M. Khare Signature and Date: Period of involvement: September 2018-July 2020 Contact information: Vardan Environet, Plot No. 82A, Sector 5, IMIT Manesar, Gurugram (Haryana)-122052 Contact – 9051920308 Email Id: [email protected] Associate EIA Coordinator: Name: Mr. Anshul Yadav Signature and Date: Period of involvement: September 2018-July 2020 Contact information: Vardan Environet, Plot No. 82A, Sector 5, IMT Manesar, Gurugra, Haryana -122052 Contact – 9953147268 Email Id: [email protected] Functional area experts: No Functional Name of the Signature Involvement areas expert/s (period and task**) October 2018-April 2019 1 AP* Mr. K.M. Khare a) Identifying the sources of (FAE – Cat. A) emissions and mitigation ii ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand EIA TEAM 3 Proposal: Environmental Clearance for Pig Iron plant (1x23m ) with capacity 12000 TPA and Coke Plant (24 DECLARATION ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots No Functional Name of the Signature Involvement areas expert/s (period and task**) measures. b) Inventorisation of point Source Mr. Shubham Tyagi Stacks emissions details. (Team Member, FAE – Cat. B) c) Site-specific micro-meteorology Monitoring and collection of secondary data. d) Air quality monitoring – location planning, supervision of AAQ monitoring, sample collection and preservation. e) Laboratory visit during analysis of samples f) Identification of air emission impacts from the project. g) Proposing mitigation measures along with budget for control of air pollution October 2018-April 2019 a) Surface water and ground Mr. K.M. Khare water quality monitoring, (FAE – Cat. A) Sampling, Preservation and assessment, impacts on Water environment and mitigations. 2 WP* b) Identification, characterisation Mr. Shubham Tyagi of effluent streams and treatments (Team Member, there of FAE – Cat. B) c) Water balance and conservation measures d) Budget Allocation October 2018-June 2020 Ms. Surbhi Rohan a) Processing of site- specific micro- 3 AQ* Makhwana meteorological data (FAE – Cat. A ) b) Collection and use of iii ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand EIA TEAM 3 Proposal: Environmental Clearance for Pig Iron plant (1x23m ) with capacity 12000 TPA and Coke Plant (24 DECLARATION ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots No Functional Name of the Signature Involvement areas expert/s (period and task**) inversion/mixing Height data for modelling. c) Air dispersion modelling for prediction of GLCS due to PM10, S02 and NOx Mr. Asif Hussain October 2018-April 2019 (FAE – Cat. A) a) Analysis of ambient noise quality 4 NV* Mr. Shubham Tyagi data (Team Member, b) Impact due to plant noise and FAE – Cat. B) abatement measures October 2018-April 2019 a) Biological environment status in Dr. Niteesh Kumar respect of terrestrial faun and 5 EB* (FAE – Cat. A) aquatic eco system b) Impact on ecological environment October 2018-April 2019 a) Ground water resource assessment Mr. R.S. Yadav 6 HG* (FAE – Cat. A) b) Impact on ground water potential and mitigation measures for avoiding Ground water contamination. October 2018-April 2019 a) Determination of demographic profile including socio economy & Ms. Shilpa Mishra 8 SE* livelihood (FAE – Cat. A) b) Assessing the changes in socio economic pattern c)Budget Allocation iv ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand EIA TEAM 3 Proposal: Environmental Clearance for Pig Iron plant (1x23m ) with capacity 12000 TPA and Coke Plant (24 DECLARATION ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots No Functional Name of the Signature Involvement areas expert/s (period and task**) October 2018-April 2019 a) Non-hazardous solid wastes generation, recycling and disposal 9 SHW* Mr. S.K. Sharma b) Storage and management of (FAE – Cat. A) hazardous solid wastes c)Budget Allocation October 2018-April 2019 a)Sampling, analysis and characterization of soil b) Assessment of Mr. S.K. Sharma fertility/productivity of soil, 10 SC* (FAE – Cat. A) nutrient availability c) Remediation of soil pollution/contaminated soils d) Controlling degradation of soil/soil conservation October 2018-April 2019 a) Analysis of data related to land use pattern 11 LU* Mr. Ankur Agarwal b) Land use map development. (FAE – Cat. A) c) Impact on land environment in respect to land form change October 2018-April 2019 a) Identification of hazardous Mrs. Anuradha prone areas 12 RH* Sharma (FAE – Cat. A) b) Environment risk evaluation c) On-site and Off-site emergency planning v ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand EIA TEAM 3 Proposal: Environmental Clearance for Pig Iron plant (1x23m ) with capacity 12000 TPA and Coke Plant (24 DECLARATION ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots Declaration by the Head of the accredited consultant organization I, R.S. Yadav, hereby, confirm that the above mentioned experts prepared the EIA of M/s Lal Ferro Alloys Co. (P) Ltd at Village: Biswasdih, P.O. Gadi Srirampur, District: Giridih, Jharkhand. I certify that this report has been prepared by ‘Vardan Environet’ with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. I also confirm that I shall be fully accountable for any misleading information mentioned in this statement. Name: R.S.Yadav Signature Designation: Managing Director NABET Certificate No. & Issue Date: NABET/EIA/1922/RA 0166 issued on 17.06.2020 and valid upto 06.11.2022 vi ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand TABLE OF Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant CONTENTS (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots TABLE OF CONTENTS Title Page No.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages323 Page
-
File Size-