Abu Dhabi PROJECTS at a Glance

Abu Dhabi PROJECTS at a Glance

Abu Dhabi Abu Dhabi ABU DHABI PROJECTS AT A GLANCE Package name Owner Status $ million* Consultant Principal contractor Start date End date Abu Dhabi Central Market Redevelopment Aldar Properties Construction 1,875 Foster + Partners-EC Harris Arabian Construction Company (ACC)-Mushrif Trading & Contracting Company Q2-2007 Q1-2014 Abu Dhabi International Airport – Midfield Terminal Complex Abu Dhabi Airport Company (Adac)-Scadia Construction 4,000 Arup-Kohn Pederson Fox Associates (KPF) Consolidated Contractors Company (CCC), TAV and Arabtec Q2-2012 Q4-2016 Abu Dhabi International Airport Expansion – Overview Adac-Scadia EPC 7,080 Skidmore Owings & Merrill (SOM)-Aeroport de Paris-Halcrow-KPF Al Habtoor Engineering Enterprises-Al Jaber & Partners Construction & – Q4-2015 Energy-Murray & Roberts-Oderbrecht Abu Dhabi Metro Abu Dhabi Department of Transport (Dot) Design 7,000 Parsons Brinckerhoff-Aecom-DP Architects Not yet appointed Q3-2014 Q1-2019 Adnoc Headquarters Complex Abu Dhabi National Oil Company (Adnoc) Construction 1,000 HOK-Hill International Six Construct Q2-2010 Q4-2013 Al Falah Community Development Aldar Properties Construction 2,500 Hyder Consulting Middle East-Road Transport and Civil Engineering Al Jaber Engineering Services-Ghantoot Transport & General Contracting- Q1-2009 Q4-2015 Consultants-Urbis Limited-GHM Design Bin Hafeez General Contracting & Transport Establishment-Bilbadi Contracting-El Seif Engineering Contracting-Pembinaan SPK Al Mafraq Hospital Abu Dhabi Health Services Company (Seha) Construction 800 Allen and Shariff Corporation Murray & Roberts-Al Habtoor Leighton Group Q1-2011 Q3-2014 Al Maryah Island Project – Overview Mubadala EPC 3,000 Not yet appointed Al Naboodah Contracting – Q1-2016 Al Raha Beach Development – Overview Aldar Properties EPC 14,700 Hill International Al Jaber & Partners Construction & Energy-Laing-O’Rourke-Murray & Q4-2005 Q4-2021 Roberts-Drake & Scull International Al Reem Island Development – Overview Bunya EPC 10,000 Alliance Engineering-Hyder Consulting Arabian Sea Foundation – Q3-2023 Aluminium Rolling Mill Emirates Conversion Industries Investments (Senaat)- Feasibility Study 1,500 Not yet appointed Not yet appointed Q3-2014 Q2-2016 Abu Dhabi Basic Industries Corporation (ADBIC) Capital Centre – Overview Abu Dhabi National Exhibitions Company EPC 2,180 Halcrow Arabtec Construction-United Engineering Construction (UNEC) – Q1-2015 Capital City District – Overview Urban Planning Council (UPC) Design 37,430 KEO International Consultants-Hyder Consulting Middle East-Perkins & Will Not yet appointed Q1-2020 Cleveland Clinic Mubadala Development Company Construction 1,900 Driver Consult Arabtec Construction-Aktor-Six Construct-Samsung Corporation Q1-2010 Q3-2013 Etihad Rail Network – Overview Etihad Rail EPC 11,000 Aecom-Parsons-Atkins Tecnimont-Saipem-Dodsal Q4-2011 Q1-2017 Etihad Rail Network – Phase One Etihad Rail Construction 1,000 Bechtel Corporation-Atkins-Hyder Consulting Middle East Tecnimont-Saipem-Dodsal Q4-2011 Q3-2014 Etihad Rail Network – Phase Two – Contract Three Etihad Rail EPC ITB 724 Aecom-Parsons-Atkins Not yet appointed Q3-2013 Q1-2015 Etihad Rail Network – Phase Two – Contract Two Etihad Rail EPC ITB 740 Aecom-Parsons-Atkins Not yet appointed Q4-2013 Q4-2015 GCC Railway Network Gulf Cooperation Council (GCC) Design 30,000 Khatib & Alami-Systra Consulting-Canarail Consultants Not yet appointed Q4-2013 Q2-2017 Khalifa Port and Industrial Zone (KPIZ) – Overview Abu Dhabi Ports Company (ADPC) EPC 24,000 Bechtel Corporation CCC-Ghantoot Transport & General Contracting-Archirodon Construction Q1-2006 Q4-2030 -Al Jaber & Partners Construction & Energy-Leighton-Hyundai Engineering & Construction-Boskalis-Al Habtoor Group-Ed Zueblin-System Construct Liwa Aquifer Storage and Recovery (ASR) Project Adwea Construction 4,000 Dornier Consulting-GTZ International Services ACC-Posco Engineering & Construction Q3-2010 Q4-2014 Louvre Museum Tourism Development and Investment Company (TDIC)-Louvre Museum Construction 27,000 EC Harris-Buro Happold-Jean Nouvel Arabtec Construction-Oger-Drake & Scull International-Constructora San Jose Q1-2013 Q4-2014 Mafraq-Ghweifat Highway Project – Overview Dot EPC ITB 2,700 Italconsult-Otak Not yet appointed – Q3-2018 Mafraq-Ghweifat Highway Project – Section One Dot EPC ITB 550 Mott MacDonald-Louis Berger Group-Otak-Steer Davies Gleave Not yet appointed Q4-2013 Q4-2018 Masdar City – Overview Masdar Construction 15,000 Australia Design Incorporated Various Q4-2026 Nuclear Power Plant Emirates Nuclear Energy Corporation (Enec) EPC 40,000 Atkins-CH2M Hill Doosan Heavy Industries & Construction-Hyundai Engineering & Construction- Q4-2009 Q2-2020 Korea Electric Power Corporation (Kepco)-Samsung C&T Corporation Onshore Shah Sour Gas Field Development (Package 10 – Non-Process Buildings) Al Hosn Gas EPC 600 Fluor ETA-Ascon Q3-2011 Q4-2014 Saadiyat Island – Overview TDIC EPC 2,000 Parsons Leighton-Jan de Nul – Q1-2018 Shamkha South Development – Overview – EPC 9,000 Mott MacDonald Ghantoot Transport & General Contracting-China State Construction – Q1-2015 Engineering Corporation (CSCEC)-Al Rajhi Construction- Saif Bin Darwish-Tristar Transport & Contracting Sheikh Khalifa Medical City Seha EPC ITB 681 SOM-Allen and Shariff Corporation Not yet appointed Q4-2013 Q4-2018 Shuweihat Three – IPP Abu Dhabi Water & Electricity Authority (Adwea) EPC 2,500 Fichtner Consulting Engineers Sumitomo Corporation-Daewoo Engineering-Korea Electric Power Q4-2010 Q1-2014 Corporation (Kepco)-Siemens Strategic Tunnel Enhancement Program (STEP) Abu Dhabi Sewerage Services Company (ADSSC) EPC 3,000 CH2M Hill Zublin-Impregilo Lideo-Samsung C&T Corporation Q1-2011 Q4-2014 Tameer Towers Shams Abu Dhabi Tameer EPC ITB 1,000 Hyder Consulting Middle East Al Habtoor Engineering Enterprises-Al Rajhi Construction Q3-2013 Q1-2015 Wahat Al Zaweya Bonyan International Investment Group Feasibility Study 1,000 Not yet appointed Not yet appointed Q4-2015 Q1-2020 Waste to Energy Plant The Centre of Waste Management Abu Dhabi (CWM)- EPC ITB 1,000 Unknown Not yet appointed Q4-2013 Q2-2016 Abu Dhabi National Energy Company (Taqa) Yas Island Development – Overview Aldar Properties Construction 40,000 Kellogg Brown & Root (KBR ) Various Q3-2007 Q1-2018 Yas Waterpark Aqua Park Aldar Properties Design 900 AGS Architects Not yet appointed Q2-2014 Q4-2017 **ITB = invitation to bid; EPC = engineering, procurement and construction *List includes projects worth over $550 million only. Gulf Construction, September 2013 56 57 Gulf Construction, September 2013.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us