Corridor Overview Cross Sections

Corridor Overview Cross Sections

CC1 DRAFT LOWER QUEEN ANNE - DOWNTOWN Queen Anne Corridor Overview Length: 2.3 miles QUEEN ANNE N AVE ROY ST MERCER ST Terminus New Track Miles: 4.5 single-track miles (rail only) Options VU99 Capitol Hill Major Stations: King Street Hub, S Jackson St - 2nd Ave S, A HARRISON ST 5 1st Ave - Yesler Way, Madision/Marison St, Seneca St, Pike St, BROAD ST Virginia St, Bell St, Queen Anne Ave N / 1st Ave N - Denny 1ST N AVE DENNY WAY Way, Harrision St (or Mercer/Roy St) Average Stop Spacing: 1,900 feet 1ST AVE Key Connections: STEWART ST BELL ST • King Street Hub BLANCHARD ST Westlake Hub VIRGINIA ST • Financial District Station B PIKE ST • Pioneer Square Station UNION ST • Colman Dock UNIVERSITY ST • RapidRide C (future) SENECA ST Central District MADISON ST Service Restructuring Corridor Alignment Elliott Bay 1ST AVE Proposed Stations COLUMBIA ST JAMES ST None Alignment Alternative - All Modes Colman Dock YESLER WAY Operating Plan Headway by Mode X Segments - Cross Section Reference 15 Peak Peak Peak / Base / Evening & Weekend 10 ST Link Light Rail / Stations S JACKSON ST 5 Rail: 8 / 10 / 15 0 0.25 0.5 Minutes Miles 0 King St. 5AM 9AM 1PM 5PM 9PM 1AM Enhanced Bus: 10 /10 / 15 Cross Sections Segment A Segment B Lower Queen Anne Couplet: North of Denny, rail would operate in a 1st Avenue: 1st Avenue has sufficient curb-to-curb width to accommo- couplet formation and could operate in mixed traffic or dedicated lanes. date 5 lanes. This would allow a center median dedicated or shared lane Multiple options are available for a turnaround/terminus. operation. Center-running rail and center platform stations would benefit traffic circulation on the downtown 1-way street grid all the way from Rail Cherry to Denny. Stations are proposed at somewhat frequent inter- vals in the downtown core because this portion of the transit line could double as a ‘waterfront circulator’ in addition to being a high-capacity connection between Lower Queen Anne and Pioneer Square. Interlin- ing/connecting the 1st Avenue line with the First Hill line at Jackson/Oc- cidental would provide expanded circulation options. Rail Bus Bus Note: All cross sections are representative of a possible design option for a corridor segment. Right-of-way widths, utility constraints, and competing street use needs vary in each of the representative segments. CC1: COMPARATIVE MEASURES DRAFT LOWER QUEEN ANNE - DOWNTOWN Weekday Riders (2030) Productivity (Weekday Riders per Revenue Hour) Rail Rail up to 12,600 Riders (Net New Riders - 9,600 Riders) 150 Riders/Hour Enhanced Enhanced Bus Bus up to 6,200 Riders (Net New Riders 3,200 Riders) 80 Riders/Hour Annual Operating Cost (Operating Cost per Boarding Ride) Net Operating Cost per Net New Ride (Accounts for Service Restructuring and Consolidation Opportunities) Rail Rail $$$$$$ $5 million $$$$ $1.60 ($1.20) Enhanced Enhanced Bus $3 million Bus $$$ ($1.60) $$$$$$$ $3.10 Total Capital Costs (and Cost per Mile) Annualized Cost per Rider (Operating and Capital) Rail Rail $$$$$$$$$$ $121 million $3.00 $$ ($53 million per mile) $$$$$$$$$$ Enhanced Enhanced Bus $5 million Bus $ ($2 million per mile) $$$$$$$$$ $2.70 End-to-End Travel Time Savings Annual GhG Savings Personal vehicle (Average Savings per Ride including In- and Out-of-Vehicle Time) Transit Emissions Decrease Emissions Increase Rail Rail -31 1 Minutes 32 MT CO2e Enhanced Bus Enhanced -10 Minutes 1 Bus MT CO e 29 2 Vehicle Capacity Requirement (Estimated Bidirectional Demand by Mode vs. Capacity by Vehicle Type) 2,000 RIDERSHIP ESTIMATES (DEMAND) Streetcar Potential Demand Enhanced Bus Potential Demand 1,000 CAPACITY ESTIMATES (SUPPLY) Streetcar Capacity: 140 with standees, 8 to 10 min headways Passengers per Hour per Passengers 40-foot Trolley Bus Capacity: 80 with standees, 10 min. headways Streetcar Seated Capacity: 30, 8 to 10 min headways 0 Passenger time profile based on peer streetcar data (Portland) 5AM 6AM 7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM Note: Methodology sheet describes purpose and methodology for each measure. All cost estimates are presented in 2011 dollars..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us