Harbour Road, Hamilton Brett's Wharf Riverwalk Remediation Project

Harbour Road, Hamilton Brett's Wharf Riverwalk Remediation Project

ReportReport 18 JANUARY 2019 Harbour Road, Hamilton Brett's Wharf Riverwalk Remediation Project PR141833-5 | Harbour Road, Hamilton | Brett's Wharf Riverwalk Remediation Project | 18 Page i January 2019 Report Document status Version Purpose of document Authored by Reviewed by Review date 0 Planning Template HK MA 09/10/2018 1 Draft for client review HK MA 11/01/2019 2 Final MA 18/01/2019 Approval for issue Name Signature Date Michael Anderson 18/01/2019 This report was prepared by RPS Australia East Pty Ltd (‘RPS’) within the terms of its engagement and in direct response to a scope of services. This report is strictly limited to the purpose and the facts and matters stated in it and does not apply directly or indirectly and must not be used for any other application, purpose, use or matter. In preparing the report, RPS may have relied upon information provided to it at the time by other parties. RPS accepts no responsibility as to the accuracy or completeness of information provided by those parties at the time of preparing the report. The report does not take into account any changes in information that may have occurred since the publication of the report. If the information relied upon is subsequently determined to be false, inaccurate or incomplete then it is possible that the observations and conclusions expressed in the report may have changed. RPS does not warrant the contents of this report and shall not assume any responsibility or liability for loss whatsoever to any third party caused by, related to or arising out of any use or reliance on the report howsoever. No part of this report, its attachments or appendices may be reproduced by any process without the written consent of RPS. All enquiries should be directed to RPS. Prepared by: RPS AUSTRALIA EAST PTY LTD Prepared for: ALYSSA PETERS Level 4 HQ South Green Square 520 Wickham Street L1 505 St Pauls Terrace Fortitude Valley, QLD 4006 Fortitude Valley QLD 4006 Australia PO Box 1559, Fortitude Valley QLD 4006 T: +61 7 3539 9500 T: E: [email protected] E: [email protected] W: Author: Henry Kassay Reviewed: Michael Anderson Approved: Michael Anderson No.: PR141833-5 Version: Final Draft Date: 18 January 2019 Page ii 18 January 2019 | Brett's Wharf Riverwalk Remediation Project | Harbour Road, Hamilton | PR141833-5 Report Contents SUMMARY ......................................................................................................................................................... 5 1 INTRODUCTION ................................................................................................................................. 6 2 SITE DETAILS .................................................................................................................................... 7 2.1 Site particulars .................................................................................................................................. 7 2.2 Planning context ............................................................................................................................... 9 2.3 Surrounding land uses ..................................................................................................................... 9 2.4 Site constraints ................................................................................................................................. 9 3 PROPOSAL ...................................................................................................................................... 11 3.1 Project background......................................................................................................................... 11 3.2 Prescribed Tidal Works .................................................................................................................. 12 3.3 Removal of Marine Plants .............................................................................................................. 14 3.4 Construction methodology ............................................................................................................ 15 3.4.1 Spall/delamination repairs – stage 1 ................................................................................................. 16 3.4.2 Spall/delamination repairs – stage 2, 3 & 4 ...................................................................................... 16 3.4.3 Lightweight cementitious fill .............................................................................................................. 16 3.4.4 Rock armour seawall ......................................................................................................................... 16 4 STATUTORY PLANNING ASSESSMENT....................................................................................... 18 4.1 Assessment manager and relevant considerations .................................................................... 18 4.2 Economic Development Act ........................................................................................................... 18 4.3 State Interests .................................................................................................................................. 18 4.3.1 State Planning Policy Interactive Mapping ........................................................................................ 18 4.3.2 State DA Mapping ............................................................................................................................. 19 4.4 Referral ............................................................................................................................................. 19 4.5 Categories of assessment .............................................................................................................. 20 4.6 Northshore Hamilton Urban Development Area Development Scheme .................................... 20 4.6.1 Relevant Definitions .......................................................................................................................... 20 4.6.2 Northshore Hamilton Vision .............................................................................................................. 21 4.6.3 Northshore Hamilton Urban Development Area Structure Plan ....................................................... 21 4.6.4 Land Use Plan: UDA Wide Criteria ................................................................................................... 22 4.6.5 Land Use Plan: Precinct .................................................................................................................... 22 4.6.6 Zone .................................................................................................................................................. 23 4.6.7 Assessment Benchmarks .................................................................................................................. 24 4.7 Relevant preliminary approvals ..................................................................................................... 25 5 CONCLUSION .................................................................................................................................. 26 PR141833-5 | Harbour Road, Hamilton | Brett's Wharf Riverwalk Remediation Project | 18 Page iii January 2019 Report Tables Table 1 Project Summary ............................................................................................................................ 5 Table 2 Real Property Description .............................................................................................................. 7 Table 3 Planning Context ............................................................................................................................ 9 Table 4 Surrounding Uses .......................................................................................................................... 9 Table 5 Site Constraints .............................................................................................................................. 9 Table 6 Categories of Assessment ........................................................................................................... 20 Figures Figure 1 Locality Plan ................................................................................................................................... 7 Figure 2 Aerial Works Plan ........................................................................................................................... 8 Figure 3 Cadastral Plan ................................................................................................................................ 8 Figure 4 Bretts Wharf Project Site Constraints .......................................................................................... 10 Figure 5 Engineering Works Staging Plan ................................................................................................. 11 Figure 6 Stage 1 Works Excerpt ................................................................................................................ 12 Figure 7 Stage 1 Works Excerpt – Typical Detail ....................................................................................... 13 Figure 8 Stage 2 and 3 Works Excerpt ...................................................................................................... 13 Figure 9 Stage 4 Works Excerpt ...............................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    32 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us